187 unique locations (2710 components) - Page 7 of 8

Active MW: 111795.11 MW
Inactive MW: 832.90 MW
Severn Power Station, West Nash Road, Nash, Newport, Gwent, NP18 2BZ (2 components)
• Existing CCGT that is to be refurbished
• Refurbishment of existing plant
Active • 2027-28 (T-4), 2025-26 (T-4)
Severn Power Station West Nash Road Nash Newport NP18 2BZ (22 components)
Combined Cycle Gas Turbine (CCGT) SEVERN POWER LIMITED Existing Generating CMU Severn Unit 10 Severn Unit 20 +1 more NP18
Active • 2029-30 (T-4), 2028-29 (T-4) ...
3095.02 MW
Severn Power Station, West Nash Road, Nash, Newport, NP18 2BZ (22 components)
• Existing CCGT Unit
• Existing CCGT Unit which is to be refurbished
• Existing CCGT UnitSevern Power Station West Nash Road Nash Newport NP18 2BZ
Combined Cycle Gas Turbine (CCGT) SEVERN POWER LIMITED Severn Unit 1 and 2 Severn Unit 10 +9 more NP18
Active • 2029-30 (T-4), 2028-29 (T-4) ...
3095.02 MW
Severn Power Station West Nash Road Newport NP18 2BZ (8 components)
Combined Cycle Gas Turbine (CCGT) SEVERN POWER LIMITED Existing Generating CMU Severn Power Unit 10 Severn Power Unit 20 NP18
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Severn Power Station, West Nash Road, Newport, NP18 2BZ (8 components)

Existing CCGT unit

Combined Cycle Gas Turbine (CCGT) SEVERN POWER LIMITED Severn Power Unit 10 Severn Power Unit 10 +2 more NP18
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Shottentons Farm, Pecks Hill, Nazeing, Essex, EN9 2NY (8 components)

Gas fuelled CHP generation plant (3)

Active • 2027-28 (T-4), 2025-26 (T-4) ...
16.48 MW
Site of the former Teesside Power Station, Greystone Road, Grangetown, Middlesbrough, TS6 8JF (2 components)

Tees CCPP is a 542.6MW CCGT unit to be installed on designated land within the (former ICI) Wilton Site this will be connected to Greystones 275kV 'A' Substation and Greystones … (2)

Combined Cycle Gas Turbine (CCGT) Sembcorp Utilities (UK) Limited Sembcorp Tees CCPP Power Station Sembcorp Tees CCPP Power Station TS6
Active • 2024-25 (T-4), 2023-24 (T-4)
Staythorpe Power Station Staythorpe Newark Nottinghamshire NG23 5PS (44 components)
Combined Cycle Gas Turbine (CCGT) RWE GENERATION UK PLC Existing Generating CMU CMU_STAY-1 CMU_STAY-2 +2 more NG23
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4893.37 MW
Staythorpe Power Station, Staythorpe, Newark, Nottinghamshire, NG23 5PS (44 components)
• Staythorpe 1 - CCGT MSID: 7210
• Staythorpe 2 - CCGT MSID: 7210
• Staythorpe 3 - CCGT MSID: 7210
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4893.37 MW
Sutton Bridge Power Station Centenary Way Sutton Bridge Lincolnshire PE12 9TF (18 components)
Combined Cycle Gas Turbine (CCGT) SUTTON BRIDGE POWER GENERATION Existing Generating CMU Sutton Bridge Sutton Bridge +1 more PE12
Active • 2029-30 (T-4), 2028-29 (T-4) ...
3095.02 MW
Sutton Bridge Power Station, Centenary Way, Sutton Bridge, Lincolnshire, PE12 9TF (16 components)
• Existing CCGT (2)
• Existing CCGT to be refurbished
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1551.59 MW
The Manor Way, Stanford-le-Hope, Essex, SS17 9GN (12 components)
Active • 2029-30 (T-4), 2028-29 (T-4) ...
2917.36 MW
The Manor Way, Stanford-le-Hope, Essex, SS17 9GN (11 components)

A CCGT station consisting of two Alstom GT26 gas turbines and a steam turbine and is based near Stanford-le-hope in Essex, England. Each turbine is individually metered with output being … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
2191.04 MW
The Manorway, Stanford-le-Hope, Essex SS17 9LP (11 components)
Storage (Duration 2h) Open Cycle Gas Turbine (OCGT) GATEWAY ENERGY CENTRE LIMITED Gateway Energy Centre Limited Gateway Energy Centre Limited SS17
Active • 2026-27 (T-4), 2025-26 (T-4) ...
30.72 MW
The Manorway, Stanford-le-Hope, Essex, SS17 9LP (11 components)

A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Stanford-Le-Hope, Essex. Metering of output is … (3)

Storage (Duration 2h) Open Cycle Gas Turbine (OCGT) GATEWAY ENERGY CENTRE LIMITED Gateway Energy Centre Limited Gateway Energy Centre Limited +9 more SS17
Active • 2026-27 (T-4), 2025-26 (T-4) ...
30.72 MW
The Yard, Holme Road, Stoney Holme, Burnley, BB12 0BJ (4 components)

3 x 2MW gas reciprocating engines used for power generation, with associated infrastructure (3)

Open Cycle Gas Turbine (OCGT) GAS GENERATION BURNLEY LIMITED New Build Generating CMU Gas Generation Burnley 2 Gas Generation Burnley 2 +2 more BB12
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Thorpe Marsh Power Station, nr Barnby Dun, Doncaster DN3 1ET (4 components)
• CCGT Unit
• CCGT Unit 1 (connected as G1)
• New combined cycle gas turbine power station comprising two units of the latest technology gas turbines, heat recovery steam generators, steam turbines and associated balance of plant. This will be constructed nr Barnby Dun
Combined Cycle Gas Turbine (CCGT) Thorpe Marsh Power Limited New Build Generating CMU Thorpe Marsh CCGT Thorpe Marsh CCGT +1 more Conditional DN3
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
TWINYARDS FARM HUTHWAITE LANE ALFRETON DE55 5HW (2 components)
• NEW BUILD GAS FUELLED GENERATING STATION
• NEW BUILD GAS FUELLED GENERATION STATION
Open Cycle Gas Turbine (OCGT) HUTHWAITE SOLAR FARM LIMITED New Build Generating CMU HUT111 HUTHWAITE Not Prequalified DE55
Inactive • 2020-21 (T-4), 2019-20 (T-1)
Ty Coch Farm Greenfield Holywell CH87HT (8 components)
Open Cycle Gas Turbine (OCGT) PINXTON ENERGY LIMITED TY COCH ENERGY LIMITED New Build Generating CMU PIN111 TYC111 Conditional CH8
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Ty Coch Farm Greenfield Holywell CH8 7HT (8 components)

Gas fuelled generation plant (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Units 1-4, Hirwaun Industrial Estate, Hirwaun, Aberdare, S Wales, CF44 9UY (5 components)
• A new 299MW Open Cycle Gas Turbine peaking plant (2)
• A new Open Cycle Gas Turbine peaking plant
Open Cycle Gas Turbine (OCGT) OCGT and Reciprocating Engines (Fuel Type - Gas) HIRWAUN POWER LIMITED New Build Generating CMU Hirwaun Power OCGT Hirwaun Power OCGT +2 more CF44
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Victory Road, Derby, Derbyshire, DE24 9HX (9 components)

Existing OCGT. (3)

Open Cycle Gas Turbine (OCGT) OCGT and Reciprocating Engines WHITETOWER ENERGY LIMITED Existing Generating CMU Derby Cogen Ltd Derby Cogen Ltd +5 more DE24
Active • 2029-30 (T-4), 2028-29 (T-4) ...
203.40 MW
West Burton B Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (28 components)
• West Burton B Power Station CMU 1 WB1-24= 100% T_WBURB-1
• West Burton B Power Station CMU 2 WB2-24= 100% T_WBURB-2
• West Burton B Power Station CMU 3 WB3-24= 100% T_WBURB-3
Storage (Duration 0.5h) Combined Cycle Gas Turbine (CCGT) WEST BURTON B LIMITED Existing Generating CMU West Burton B Power Station CMU 1 West Burton B Power Station CMU 1 +17 more DN22
Active • 2029-30 (T-4), 2028-29 (T-4) ...
3608.42 MW
West Marsh Road Spalding Lincolnshire PE11 2BB (9 components)
Combined Cycle Gas Turbine (CCGT) SPALDING ENERGY COMPANY, LTD. Spalding Energy Expansion Spalding Energy Expansion PE11
Active • 2029-30 (T-4), 2028-29 (T-4) ...
2596.64 MW
Loading map...
Showing 25 locations