Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Open Cycle Gas Turbine (OCGT)

3 unique locations (20 components)

Victory Road, Derby, Derbyshire, DE24 9HX (7 components)
• Existing OCGT.
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output
Active • 2028-29 (T-4), 2026-27 (T-4) ...
164.48 MW
Fort Parkway Heartlands Birmingham B24 9QT (9 components)
• Existing OCGT
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output.
Active • 2028-29 (T-4), 2024-25 (T-4) ...
133.92 MW
Factory Lane Croydon Surrey CR0 3RL (4 components)

Existing OCGT.

Active • 2028-29 (T-4), 2025-26 (T-4) ...
89.51 MW
Loading map...
Showing 3 locations