Winnington CHP Winnington Lane Winnington Northwich Cheshire CW8 4GX (39 components)
• Continuously operating, maximum output GE gas turbine driving a 47.020MVA Alstom generator at 0.85 power factor.
• Continuously operating, maximum output GE gas turbine driving a 47.020MWA Alstom generator at 0.85 power factor.
• Continuously operating, variable output Man Diesel Turbo single pass-out back pressure turbine driving a 19.300 MVA TD Power Systems generator at 0.85 power factor.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
232.80 MW
West Marsh Road Spalding Lincolnshire PE11 3BB (15 components)
• A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Spalding, Lincolnshire. Metering of output is Net of auxiliary load.
• A new open cycle power station comprising gas turbines and associated balance of plant. This is being constructed on brownfield land in Spalding, Lincolnshire. Metering of output is Net of auxillary load.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
259.70 MW
Victory Road, Derby, Derbyshire, DE24 9HX (7 components)
• Existing OCGT.
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output
Active • 2028-29 (T-4), 2026-27 (T-4) ...
164.48 MW
426.46 MW
Ty Coch Farm Greenfield Holywell CH87HT (11 components)

Gas fuelled generation plant

Active • 2024-25 (T-4), 2023-24 (T-4) ...
9.50 MW
The Yard, Holme Road, Stoney Holme, Burnley, BB12 0BJ (4 components)

3 x 2MW gas reciprocating engines used for power generation, with associated infrastructure

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
5.70 MW
The Manorway, Stanford-le-Hope, Essex SS17 9LP (2 components)
• A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Stanford-Le-Hope, Essex. Metering of output is Net of auxillary load.
• A new open cycle power station comprising gas turbine(s) and associated balance of plant. This will be constructed on brownfield land in Stanford-Le-Hope, Essex. Metering of output is Net of auxillary load.
Active • 2024-25 (T-4), 2023-24 (T-4)
24.31 MW
Shottentons Farm, Pecks Hill, Nazeing, Essex, EN9 2NY (11 components)

Gas fuelled CHP generation plant

Active • 2025-26 (T-4), 2024-25 (T-1) ...
18.26 MW
Ratcliffe-on-Soar Nottingham NG11 0EE (100 components)
• Ratcliffe U2 OCGT fuelled on Diesel as defined by BS EN590
• Ratcliffe U4 OCGT fuelled on Diesel as specified by BS EN590
• Ratcliffe U4 auxiliary gas turbine. Note this Generating Unit is fuelled on Diesel as specified by BS EN590
Active • 2028-29 (T-4), 2026-27 (T-4) ...
3602.30 MW
Progress Power Station, Eye Airfield, Diss, Suffolk, IP23 7HE (4 components)

A new 299MW Open Cycle Gas Turbine (OCGT) power peaking plant

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
New Hall Farm School Lane Birchwood Warrington WA3 6LH (4 components)

New Gas fulled generation station

Active • 2024-25 (T-4), 2023-24 (T-4) ...
5.70 MW
Millbrook Power Station, Rookery South Pit, Green Lane, Stewartby, Bedfordshire MK43 9LX (4 components)
• A new 299MW Open Cycle Gas Turbine (OCGT) power peaking plant
• A new Open Cycle Gas Turbine (OCGT) power peaking plant
Active • 2024-25 (T-4), 2023-24 (T-4) ...
284.35 MW
Lynchford Lane, Farnborough, GU14 6LW (3 components)

10 gas reciprocating engines used for power generation, with associated infrastructure.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Little Barford Power Station Little Barford St Neots PE19 6YT (28 components)
• Little Barford 1 CCGT MSID: 4052
• Little Barford 1 OCGT . fuel type is distillate
• Little Barford 1 OCGT . fuel type is distillate MSID: 4052
Active • 2028-29 (T-4), 2026-27 (T-4) ...
3881.97 MW
Land off Well Street, Paisley, PA1 2QH (3 components)

4 gas reciprocating engines used for power generation, with associated infrastructure.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Land adjacent to Brynfyrd Botley Road Romsey SO52 9DP (3 components)

Gas fuelled generation plant

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Fort Parkway Heartlands Birmingham B24 9QT (9 components)
• Existing OCGT
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output.
Active • 2028-29 (T-4), 2024-25 (T-4) ...
133.92 MW
31252.77 MW
Factory Lane Croydon Surrey CR0 3RL (4 components)

Existing OCGT.

Active • 2028-29 (T-4), 2025-26 (T-4) ...
89.51 MW
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS (46 components)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 6)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 7)
• New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4371.10 MW
EDF Energy (Thermal Generation) Limited, West Burton A Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (119 components)
• West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUGT-4 = 100% (T_WBUGT-4)
• West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUPS-1 = 100% (T_WBUPS-1) + 25% (E_WBUPS-STX)
• West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUPS-3 = 100% (T_WBUPS-3) + 25% (E_WBUPS-STX)
Active • 2026-27 (T-4), 2025-26 (T-4) ...
2450.85 MW
Cowes Power Station Kingston Road East Cowes Isle of Wight PO32 6JS (31 components)
• Cowes 1 - OCGT, fuel is distillate MSID: 4548
• Cowes 2 - OCGT, fuel is distillate
• Cowes 2 - OCGT, fuel is distillate MSID: 4548
Active • 2028-29 (T-4), 2027-28 (T-4) ...
496.48 MW