Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Open Cycle Gas Turbine (OCGT)

64 unique locations (1476 components) - Page 2 of 3

Knapton Generating Station, East Knapton, Malton, North Yorkshire, YO17 8JF (8 components)

Generating Station, the power generation facilities consist of RLM 6000 EGT generation package with a LM6000 gas turbine

Inactive • 2019-20 (T-1), 2018-19 (T-1)
Land adjacent to Brynfyrd Botley Road Romsey SO52 9DP (3 components)

Gas fuelled generation plant

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Land adjacent to Brynfyrd, Botley Road, Romsey, SO52 9DP (3 components)

10 x 2MW gas powered generator units to be installed on designated land within a manufacturing compound at the Botley Farm.

Inactive • 2021-22 (T-1)
land at Hoon Hay Farm, Marston Lane, Hatton, Derbyshire, DE65 5EA (1 component)

gas powered generator to be installed on designated land within a manufacturing compound at the Hoon Hay Farm.

Active • 2024-25 (T-4)
Land off Bicester Road Bicester Oxfordshire OX26 6EP (1 component)

Gas fuelled generation plant

Inactive • 2022-23 (T-4)
Land off Well Street, Paisley, PA1 2QH (3 components)

4 gas reciprocating engines used for power generation, with associated infrastructure.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Land West of Yelland Quay, West Yelland, Yelland, Barnstaple, EX31 3HB (1 component)

10 x 2MW gas reciprocating engines used for power generation, with associated infrastructure.

Inactive • 2022-23 (T-4)
Little Barford Power Station Little Barford St Neots PE19 6YT (28 components)
• Little Barford 1 CCGT MSID: 4052
• Little Barford 1 OCGT . fuel type is distillate
• Little Barford 1 OCGT . fuel type is distillate MSID: 4052
Active • 2028-29 (T-4), 2026-27 (T-4) ...
3881.97 MW
Lynchford Lane, Farnborough, GU14 6LW (3 components)

10 gas reciprocating engines used for power generation, with associated infrastructure.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Marsh Green Industrial Park Marsh Barton Trading Estate Exeter Devon EX2 8NY (10 components)
• Existing OCGT.
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
211.92 MW
Millbrook Power Station, Rookery South Pit, Green Lane, Stewartby, Bedfordshire MK43 9LX (4 components)
• A new 299MW Open Cycle Gas Turbine (OCGT) power peaking plant
• A new Open Cycle Gas Turbine (OCGT) power peaking plant
Active • 2024-25 (T-4), 2023-24 (T-4) ...
284.35 MW
Mill Lane, Kirkby in Ashfield, NG17 9LG (3 components)

5 x2MW gas reciprocating engines used for power generation, with associated infrastructure.

Inactive • 2019-20 (T-1)
Mitchell Road, Phoenix Parkway, Corby, Northamptonshire, NN17 5QT (44 components)
• The CMU is a Open Cycle Gas Turbine (OCGT)
• The CMU is a combined cycle gas turbine
• The CMU is a gas plant, capable of running in either OCGT or CCGT modes
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3397.00 MW
New Hall Farm School Lane Birchwood Warrington WA3 6LH (4 components)

New Gas fulled generation station

Active • 2024-25 (T-4), 2023-24 (T-4) ...
5.70 MW
Newton Aycliffe CO Durham DL5 6EA (24 components)
• Existing Gas Engine
• This is a long standing existing Gas Engine unit on land within a manufacturing site.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
27.91 MW
Peterborough Power Station, Storeys Bar Road, Peterborough, PE1 5NT (5 components)

Existing OCGT plant.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
918.41 MW
Power Station Road Isle of Grain Rochester ME3 0AR (77 components)
• Grain B CCGT Unit 6 Grain B power station provides heat to the Grain LNG regasification facility.
• OCGT from Grain U1. Fuel is Diesel as specified in BS EN590
• OCGT from Grain U4. Fuel is Diesel as specified in BS EN590
Active • 2028-29 (T-4), 2027-28 (T-4) ...
5014.90 MW
Progress Power Station, Eye Airfield, Diss, Suffolk, IP23 7HE (4 components)

A new 299MW Open Cycle Gas Turbine (OCGT) power peaking plant

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Ratcliffe-on-Soar Nottingham NG11 0EE (100 components)
• Ratcliffe U2 OCGT fuelled on Diesel as defined by BS EN590
• Ratcliffe U4 OCGT fuelled on Diesel as specified by BS EN590
• Ratcliffe U4 auxiliary gas turbine. Note this Generating Unit is fuelled on Diesel as specified by BS EN590
Active • 2028-29 (T-4), 2026-27 (T-4) ...
3602.30 MW
Redditch Generation Station Windsor Road Redditch B97 6HE (11 components)

Gas turbine generator

Active • 2025-26 (T-4), 2024-25 (T-1) ...
116.16 MW
Rockingham South, Smoke Land, Avonmouth BS11 0YT (7 components)
• 3 x 2MW OCGT gas reciprocating engines
• 5 x 2MW OCGT gas engines The CMU will using the existing grid connection point use ty the connected CMUs which already have CM agreements. The meterign will be expanded so the CMU can be metered seperatly.
• The CMU will consist of 2 MW's of containerised battery storage.
Active • 2027-28 (T-4), 2021-22 (T-4) ...
9.44 MW
Rockingham South, Smoke Lane, Avonmouth, BS11 0YT. (1 component)

The CMU will consist of 1 x 2 MW OCGT gas fired engine. It will have its own individual metering arrangements, but will share the grid connection point with 4 …

Inactive • 2022-23 (T-4)
Loading map...
Showing 25 locations