Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Open Cycle Gas Turbine (OCGT)

64 unique locations (1476 components) - Page 1 of 3

Wytch Farm, Wareham BH20 5JR (7 components)

Two gas turbines (CX501-KB7) rated at 5.3MW each.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Winnington CHP Winnington Lane Winnington Northwich Cheshire CW8 4GX (39 components)
• Continuously operating, maximum output GE gas turbine driving a 47.020MVA Alstom generator at 0.85 power factor.
• Continuously operating, maximum output GE gas turbine driving a 47.020MWA Alstom generator at 0.85 power factor.
• Continuously operating, variable output Man Diesel Turbo single pass-out back pressure turbine driving a 19.300 MVA TD Power Systems generator at 0.85 power factor.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
232.80 MW
Whitewalls Road, Rochester, Kent, ME2 4DZ (2 components)

A series of gas generators on an existing site.

Active • 2025-26 (T-1)
37.40 MW
Whitewall Road, Rochester, Kent, ME2 4DZ (4 components)

A series of gas generators on an existing site.

Active • 2024-25 (T-1), 2023-24 (T-1)
75.98 MW
West Marsh Road Spalding Lincolnshire PE11 3BB (15 components)
• A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Spalding, Lincolnshire. Metering of output is Net of auxiliary load.
• A new open cycle power station comprising gas turbines and associated balance of plant. This is being constructed on brownfield land in Spalding, Lincolnshire. Metering of output is Net of auxillary load.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
259.70 MW
Victory Road, Derby, Derbyshire, DE24 9HX (7 components)
• Existing OCGT.
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output
Active • 2028-29 (T-4), 2026-27 (T-4) ...
164.48 MW
426.46 MW
Ty Coch Farm Greenfield Holywell CH87HT (11 components)

Gas fuelled generation plant

Active • 2024-25 (T-4), 2023-24 (T-4) ...
9.50 MW
TWINYARDS FARM HUTHWAITE LANE ALFRETON DE55 5HW (4 components)
• NEW BUILD GAS FUELLED GENERATING STATION
• NEW BUILD GAS FUELLED GENERATION STATION
Inactive • 2020-21 (T-4), 2019-20 (T-1)
The Yard, Holme Road, Stoney Holme, Burnley, BB12 0BJ (4 components)

3 x 2MW gas reciprocating engines used for power generation, with associated infrastructure

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
5.70 MW
The Manorway, Stanford-le-Hope, Essex SS17 9LP (2 components)
• A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Stanford-Le-Hope, Essex. Metering of output is Net of auxillary load.
• A new open cycle power station comprising gas turbine(s) and associated balance of plant. This will be constructed on brownfield land in Stanford-Le-Hope, Essex. Metering of output is Net of auxillary load.
Active • 2024-25 (T-4), 2023-24 (T-4)
24.31 MW
Shottentons Farm, Pecks Hill, Nazeing, Essex, EN9 2NY (11 components)

Gas fuelled CHP generation plant

Active • 2025-26 (T-4), 2024-25 (T-1) ...
18.26 MW
RWE Generation UK plc Ferrybridge A Workshop Site Old Great North Road Knottingley WF11 8PR (2 components)

A CMU will be formed of an Open Cycle Gas Turbine unit.

Inactive • 2022-23 (T-4)
Rockingham South, Smoke Lane, Avonmouth, BS11 0YT. (1 component)

The CMU will consist of 1 x 2 MW OCGT gas fired engine. It will have its own individual metering arrangements, but will share the grid connection point with 4 …

Inactive • 2022-23 (T-4)
Rockingham South, Smoke Land, Avonmouth BS11 0YT (7 components)
• 3 x 2MW OCGT gas reciprocating engines
• 5 x 2MW OCGT gas engines The CMU will using the existing grid connection point use ty the connected CMUs which already have CM agreements. The meterign will be expanded so the CMU can be metered seperatly.
• The CMU will consist of 2 MW's of containerised battery storage.
Active • 2027-28 (T-4), 2021-22 (T-4) ...
9.44 MW
Redditch Generation Station Windsor Road Redditch B97 6HE (11 components)

Gas turbine generator

Active • 2025-26 (T-4), 2024-25 (T-1) ...
116.16 MW
Ratcliffe-on-Soar Nottingham NG11 0EE (100 components)
• Ratcliffe U2 OCGT fuelled on Diesel as defined by BS EN590
• Ratcliffe U4 OCGT fuelled on Diesel as specified by BS EN590
• Ratcliffe U4 auxiliary gas turbine. Note this Generating Unit is fuelled on Diesel as specified by BS EN590
Active • 2028-29 (T-4), 2026-27 (T-4) ...
3602.30 MW
Progress Power Station, Eye Airfield, Diss, Suffolk, IP23 7HE (4 components)

A new 299MW Open Cycle Gas Turbine (OCGT) power peaking plant

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Power Station Road Isle of Grain Rochester ME3 0AR (77 components)
• Grain B CCGT Unit 6 Grain B power station provides heat to the Grain LNG regasification facility.
• OCGT from Grain U1. Fuel is Diesel as specified in BS EN590
• OCGT from Grain U4. Fuel is Diesel as specified in BS EN590
Active • 2028-29 (T-4), 2027-28 (T-4) ...
5014.90 MW
Peterborough Power Station, Storeys Bar Road, Peterborough, PE1 5NT (5 components)

Existing OCGT plant.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
918.41 MW
Newton Aycliffe CO Durham DL5 6EA (24 components)
• Existing Gas Engine
• This is a long standing existing Gas Engine unit on land within a manufacturing site.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
27.91 MW
New Hall Farm School Lane Birchwood Warrington WA3 6LH (4 components)

New Gas fulled generation station

Active • 2024-25 (T-4), 2023-24 (T-4) ...
5.70 MW
Mitchell Road, Phoenix Parkway, Corby, Northamptonshire, NN17 5QT (44 components)
• The CMU is a Open Cycle Gas Turbine (OCGT)
• The CMU is a combined cycle gas turbine
• The CMU is a gas plant, capable of running in either OCGT or CCGT modes
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3397.00 MW
Mill Lane, Kirkby in Ashfield, NG17 9LG (3 components)

5 x2MW gas reciprocating engines used for power generation, with associated infrastructure.

Inactive • 2019-20 (T-1)
Loading map...
Showing 25 locations