Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

34 unique locations (319 components) - Page 1 of 2

9 J3 Business park, Balby Carr Bank, Doncaster, DN4 8DE (14 components)

A new build gas fuelled generating station.

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Aveley (N) Sandy Lane Aveley South Ockendon Essex RM15 4XP (17 components)
• Gas fired generating unit
• The site comprises of four gas reciprocating engines with an assumed output of 4.6MW. The reciprocating engines are connected to the distribution network.
Inactive • 2021-22 (T-4), 2020-21 (T-1) ...
Belvedere Nurseries, Belvedere Lane, Watling Street, Fenny Stratford, Milton Keynes, MK17 9JH (6 components)

Energy Centre comprising of Lean Burn, Acoustically Treated Natural Gas Reciprocating Engines.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Campbeltown Road, Tranmere, CH41 9HP (10 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Cheshire Power Station (Formally known as 'Bridgewater Paper') North Road Ellesmere Port CH65 1AF (8 components)
• 12 x 1.1 MW Reciprocating gas engines at Cheshire Power Station
• New build 12 x 1.1 MW Reciprocating gas engines at Cheshire Power Station
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Dafen Power, Llethri Road, Dafen Park Industrial Estate, Llanelli, SA14 8QN (8 components)
• 10 MW power plant comprising 5 x 2MW gas fired reciprocating engines. Power plant will be connected to the local distribution network and local gas network.
• 10 MW power plant comprising of 5x2MW gas fired reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• 10 MW power plant comprising of 5x2MW gas fired reciprocating engines. The power plant will be connected to the local distribution network and local gas network.
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
9.31 MW
Dogsthorpe Landfill Site Welland Road Peterborough Cambridgeshire PE1 3TD (7 components)
• 2 gas reciprocating engines with a combined export output of approximately 2MW. The generating equipment is connected to the distribution network via an import/export meter.
• Gas reciprocating engines
Active • 2027-28 (T-4), 2026-27 (T-4) ...
7.64 MW
Forth Drove, Peterborough PE1 5NT (9 components)

A Prospective New Build Gas reciprocating energy reserve facility

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Garden Lane, Cadeby, Doncaster, DN5 7SN (10 components)

Gas fired generating engines

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Haverton Hill Road Stockton-on-Tees Billingham TS23 1PS (12 components)
• Gas and/or diesel reciprocating engines.
• New build power station comprised of multiple reciprocating engines.
• Power station comprised of multiple reciprocating engines.
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Hills Storage & Distribution Centre Stanley Way Stanley Industrial Estate Skelmersdale WN8 8EA (10 components)
• 20MW gas fuelled generating station
• A new build gas fuelled generating station.
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
J3 Business Park, Balby Carr Bank, Balby, Doncaster, DN4 8DE (12 components)

A 20MW New Build gas fuelled generating station.

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Land at Burn Park Farm, Cottingham, HU16 5SB (7 components)
• Battery storage plant
• Gas Peaking Reciprocating engines
• Gas peaking reciprocating engine
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Land at Ernest Nunn Road, Stowmarket IP14 2AH (6 components)

CMU is a new 20MW facility, metered on the distrbution boundary using a COP2 meter with no auxilliary load on site.

Inactive • 2019-20 (T-1), 2018-19 (T-1)
Land at Queens Road, Immingham, DN40 1QR (8 components)
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connected to the local distribution network and local gas network.
• 16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
Active • 2028-29 (T-4), 2021-22 (T-4) ...
29.54 MW
Land at Seal Sands Road, Seal Sands, Middlesbrough, TS2 1UB (12 components)

New build power station comprised of multiple reciprocating engines.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Land lying to the north west of Staithes Road, Hull, HU12 8DX (13 components)
• 21 MW power plant comprising 11 gas reciprocating engines. Power plant will be connected to the local distribution network and local gas network.
• 21MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
38.89 MW
"Land to the east of Marl Road, Knowsley, Kirkby, L33 7UH (9 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Land to the west (see map) of 18-20 Netherdale Rd, Netherton Industrial Estate, Wishaw ML2 0ER (8 components)
• The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV
• The facility consists of a series of gas fired generators. It connects to SPEN?s 33kV distribution network at 33kV
Inactive • 2022-23 (T-3), 2022-23 (T-4) ...
Old Mill Industrial Estate, Mansfield, NG19 9BG (13 components)
• 1 x MWM TCG 2016V
• Gas fired generating unit
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
Part Of Plots 15 And 16 Unit Rw 1 Bankwood Lane New Rossington Doncaster DN11 0PS (9 components)

Energy Centre comprising of Lean Burn, Acoustically Treated Natural Gas Reciprocating Engines.

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Loading map...
Showing 25 locations