113 unique locations (927 components) - Page 1 of 5

4 Chemistry Lane, Pentre, Deeside, CH5 2DW (5 components)

14MW Power plant comprising 7x2MW gas reciprocating engines. The power plant is connected to the local distribution and gas network.

Inactive • 2022-23 (T-4), 2019-20 (T-1)
9 J3 Business park, Balby Carr Bank, Doncaster, DN4 8DE (16 components)

A new build gas fuelled generating station.

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
A66 and Tees Dock Road, Grangetown TS6 7HJ (4 components)

New build power station comprised of multiple reciprocating engines.

Inactive • 2019-20 (T-1)
Albion Close, Worksop, Nottinghamshire, S80 1RA (5 components)

New reciprocating genset in acoustic enclosure

Inactive • 2020-21 (T-4), 2019-20 (T-1)
Arlesey Landfill Site Mill Lane Arlesey Bedfordshire SG15 6ZA (9 components)

The system comprises of two gas reciprocating engines provided an exported output of around 2MW.

Inactive • 2020-21 (T-1), 2020-21 (T-4) ...
Asher Lane, Ripley, Derbyshire, DE5 3RE (7 components)
• New reciprocating genset in acoustic enclosure
• New reciprocating engine in acoustic enclosure. *Post code and grid reference may not match because site address is not yet registered with post office. We have used nearest available post code.
Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
Askern 1 CMM Generation Campsall Road Askern Doncaster DN6 0FD (5 components)

Gas generating unit(s)

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Askern CMM Generation, Campsall Road, Askern, Doncaster DN6 0FD (17 components)
• Gas fired generating unit(s)
• Gas reciprocating engine(s)
• Gas-fired reciprocating engines
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
2.02 MW
Aspatria Business Park, Park Road, Aspatria, CA7 3DP (7 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Aveley (N) Sandy Lane Aveley South Ockendon Essex RM15 4XP (18 components)
• Gas fired generating unit
• The site comprises of four gas reciprocating engines with an assumed output of 4.6MW. The reciprocating engines are connected to the distribution network.
Inactive • 2021-22 (T-4), 2020-21 (T-1) ...
Banbury Power Hennef Way Grimsbury Banbury OX16 3WA (4 components)

Banbury Power will be a 12MW power plant comprising gas reciprocating engines. The export of the power plant is connected to the local distribution network via two separately metered 6MW …

Inactive • 2019-20 (T-1)
Banbury Power Hennef Way Grimsbury Banbury OX16 3WA (3 components)

Banbury Power will be a 12MW power plant comprising gas reciprocating engines. The export of the power plant is connected to the local distribution network via two separately metered 6MW …

Inactive • 2019-20 (T-1)
Belvoir Way, Fairfield Industrial Estate Louth LN11 0YZ (21 components)

New build power station comprised of multiple reciprocating engines.

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Bilsthorpe Colliery Site Bilsthorpe Newark Notts NG22 8ST (7 components)
• Gas fired reciprocating engines
• Gas reciprocating engines
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Boarhunt Rd, Fareham, PO17 6AJ (4 components)

Gas fired reciprocating engines

Inactive • 2020-21 (T-4), 2019-20 (T-1)
Building 2 Aldon Road Business Park, Poulton Le Fylde FY6 8JL (11 components)

New build gas generator

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Cadeby 1 CMM Generation Garden Lane Cadeby Doncaster DN5 7SN (14 components)
• 1x 2.00MW Containerised Generating sets.
• Gas fired generating sets.
• Gas generating unit(s)
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
3.05 MW
Campbeltown Road, Tranmere, CH41 9HP (10 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Canal St, Brierley Hill DY5 1JJ, UK (5 components)

14 x 1.1MW gas reciprocating engines at Canal St, Brierley Hill, Dudley on a designated in an industrial / Commercial district.

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Chatterley Whitfield Enterprise Centre Stoke-on-Trent ST6 8UW (4 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2019-20 (T-1)
Cheshire Power Station (Formally known as 'Bridgewater Paper') North Road Ellesmere Port CH65 1AF (9 components)
• 12 x 1.1 MW Reciprocating gas engines at Cheshire Power Station
• New build 12 x 1.1 MW Reciprocating gas engines at Cheshire Power Station
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Chesterfield Road, Swallownest, Sheffield, S26 4TL (5 components)

New reciprocating genset in acoustic enclosure

Inactive • 2020-21 (T-4), 2019-20 (T-1)
Common Lane, Wath upon Dearne, Rotherham, South Yorkshire, S63 7DX (10 components)
• Battery energy storage unit
• New reciprocating genset in acoustic enclosure
Active • 2028-29 (T-4), 2025-26 (T-1) ...
1.37 MW
Cuckoo Road, Nechells, Birmingham, B7 5TR (4 components)

New reciprocating genset in acoustic enclosure

Inactive • 2020-21 (T-4), 2019-20 (T-1)
Loading map...