Reciprocating engines

9 unique locations (175 components)

Worset Lane, Hartlepool, TS27 3BQ (4 components)
• A new build, gas fuelled generation station
• Onsite load reduction and back up generation behind the meter on multiple sites
Active • 2028-29 (T-4), 2027-28 (T-4) ...
46.47 MW
Unproven DSR yet to be procured (46 components)
• Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 8MW.
• N/A
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Thorpe Marsh Ash Fields, Ash Fields Road, off Marsh Lane, Thorpe in Balne/Barnby Dun, Doncaster, DN6 0EA (4 components)
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
• One of six CHP units at University of Warwick, Coventry, CV4 7AL
• Onsite load reduction and back up generation behind the meter on multiple sites
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Liberty Lochaber Smelter, Fort William, Scotland PH33 6TH (53 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• Existing CCGT Unit
• Hydro power turbine generator Unit 1 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Land off Salmon Lane, Annesley, Nottinghamshire NG15 0DF (10 components)
• New reciprocating gensets in acoustic enclosure
• Onsite load reduction and back up generation behind the meter on multiple sites
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
7.44 MW
Errochty Power Station, Tummel Bridge, by Pitlochry, Perthshire, PH16 5DF (23 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• N/A
• This is a long standing existing Gas Engine unit on land within a manufacturing site.
Active • 2027-28 (T-4), 2023-24 (T-4) ...
Dorehouse Business Park Sheffield S13 9LT BB10 2TN (8 components)
• 1 x hydro turbine & synchronous generator
• Aggregate CMU from multiple sources
• Gas fired reciprocating engines.
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
4 Finway Road Hemel Hempstead HP2 7PT (11 components)
• 14.710 MW CHP generation
• Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW
• Onsite load reduction and back up generation behind the meter on multiple sites
Active • 2024-25 (T-4), 2022-23 (T-3) ...
4.76 MW
25 Southfield Lingard Lane Stockport SK6 2QN (16 components)
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
• Aggregate CMU from multiple sources
• N/A
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...