Reciprocating engines

13 unique locations (187 components)

Stillingfleet Colliery Cawood Road, Stillingfleet Moor, Stillingfleet, Yorkshire, YO19 6HS (4 components)
• 1 x Jenbacher 420 (1.4MW)
• Reciprocating Gas Engine(s)
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Sloy Power Station, Inveruglas, By Arrochar, Argyll, G83 7DP (22 components)
• Energy facility comprising of battery energy storage sets and ancillary equipment.
• Genset 3
• The CMU component comprises of three 2MW Reciprocating Gas Engines
Active • 2026-27 (T-4), 2024-25 (T-4) ...
7.09 MW
Queens Road, Immingham, DN40 1QN (5 components)
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• Generating Unit 2
• Lithium Ion battery storage system capable of importing, storing and exporting electricity.
Active • 2027-28 (T-4), 2021-22 (T-4) ...
20.98 MW
Milton Keynes Hospital NHS Trust, Standing Way, Eaglestone, Milton Keynes, MK6 5LD (22 components)
• 3 x 2MW gas generator units to be installed on a compound adjacent to Droppingwell Road
• Behind the Meter Generation
• CMU consisting of multiple reciprocating engines and alternators
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Lochay Power Station, Killin, Perthshire, FK21 8UA (9 components)
• A gas fuelled generating station.
• Post-refurbishment generating unit. ROCable hydro units within the BMU are not included in the CMU.
• Pre-refurbishment generating unit. ROCable hydro units within the BMU are not included in the CMU.
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Land at the corner of Hull Road and Salt End Lane, HU12 8PP (6 components)
• A generating station consisting of multiple reciprocating engines and alternators located on a single site.
• The CMU will be formed of multiple individual Batteries. This site is to include a Battery Energy Storage System (BESS) that can either operate as import or export at will. The connection is to be provided at 33KV by installing an underground cable with a metering circuit breaker located at the customer's site.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
46.54 MW
Land Adjacent to Stobarts Logistics Off Branthwaite Road Lillyhall Workington Cumbria CA14 4ED (16 components)
• Gas reciprocating engines
• Generating Unit 2
• The East West Interconnector (EWIC) is a 400kV HVDC link between Connah's Quay in Wales and Woodland in Ireland.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
22.75 MW
Foyers Power Station, Kelvin Way, Gorthleck, Foyers, Inverness-shire, IV2 6YB (17 components)
• Component has yet to be procured.
• Gas peaking reciprocating engines
• Generating Unit 1
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
204.51 MW
Errochty Power Station, Tummel Bridge, by Pitlochry, Perthshire, PH16 5DF (23 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• N/A
• This is a long standing existing Gas Engine unit on land within a manufacturing site.
Active • 2027-28 (T-4), 2023-24 (T-4) ...
Dafen Power, Llethri Road, Dafen Park Industrial Estate, Llanelli, SA14 8QN (9 components)
• 10 MW power plant comprising of 5x2MW gas fired reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• 10 MW power plant comprising of 5x2MW gas fired reciprocating engines. The power plant will be connected to the local distribution network and local gas network.
• Ratcliffe U4 auxiliary gas turbine. Note this Generating Unit is fuelled on Gas Oil as specified by BS2869 Class A2
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
9.31 MW
Cowley Hill Works Boilerhouse, Albert Street, St Helens, WA10 2RZ (20 components)
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
13.89 MW
BROOKSBY QUARRY, BROOKSBY QUARRY MELTON ROAD, BROOKSBY, LE14 2LJ (7 components)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• Pre-refurbishment generating unit 2
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
Baglan Bay Power Station Baglan Energy Park Port Talbot SA12 7GE (27 components)
• A gas fuelled generating station.
• Existing BAGE-1 CCGT repowered with new gas turbine and substantial BOP improvements
• Existing CCGT Baglan Unit 1
Active • 2024-25 (T-4), 2023-24 (T-4) ...
428.74 MW