Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

19 unique locations (116 components)

Thurscoe Business Park, Barrowfield Rd, Thurscoe, Rotherham S63 0DB (3 components)

Gas reciprocating engines

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
4.61 MW
Substation at Saltend Lane Preston East Riding of Yorkshire HU12 8EY (6 components)
• Bio-liquid fuelled distribution connected generation station
• Gas fuelled distribution connected generation station
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
65.47 MW
Stewartby Landfill Site, Green Lane, Stewartby, Bedfordshire, MK43 9LY (2 components)
• Solar PV generation site
• The site comprises of gas reciprocating unit(s)
Active • 2025-26 (T-4), 2022-23 (T-4)
3.41 MW
Pioneer Mill, Milltown St, Radcliffe, Manchester, M26 1WN (1 component)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2022-23 (T-4)
19.03 MW
No.1 Maxwell Road Woodston Industrial Estate Peterborough PE2 7JB (8 components)
• A power plant, with associated civil works, switchgear and electrical connection.
• A recently completed power plant, with associated civil works, switchgear and electrical connection.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
56.82 MW
37.99 MW
Marsh Green Industrial Park Marsh Barton Trading Estate Exeter Devon EX2 8NY (9 components)
• Existing OCGT.
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
263.09 MW
Lubenham Road, Market Harborough, Leicestershire, LE16 9NP *Post code and grid reference may not match because site address is not yet registered with post office. We have used nearest available post code. (5 components)
• New reciprocating genset in acoustic enclosure
• New containerised battery storage equipment
• New reciprocating genset in acoustic enclosure
Inactive • 2022-23 (T-4), 2018-19 (T-1)
16.47 MW
Long Lane, Westhoughton, Bolton, Lancashire BL5 3QR (4 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
57.07 MW
Land at Kilbuck Lane, Haydock Cross Industrial Estate, St. Helens, WA11 9SR (3 components)

A new build gas fuelled generating plant at Haydock Cross Industrial Estate, WA11 9SR

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
38.02 MW
Knypersley Generation Unit G, Brown Lees Industrial Estate, Knypersley, Staffordshire, ST8 7DN (8 components)
• The CMU Component is made up of brand new gas-fired engines.
• The CMU Component is made up of reciprocating diesel engines.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Hawarden Industrial Park Clwyd Close Manor Lane Hawarden Deeside CH5 3PZ (12 components)
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
9.52 MW
GREENMOOR BANK FARM, OLD HUTTON, KENDAL, LA8 0NT (3 components)
• Battery Storage Plant
• Gas peaking reciprocating engine
• Gas peaking reciprocating engines
Inactive • 2022-23 (T-4), 2021-22 (T-4)
103.90 MW
47.80 MW
Applied Automation Eastern Wood Road Langage Industrial Estate PL7 5ET (10 components)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (2)
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
16.18 MW
Aldon Road, Poulton-le-Fylde, Lancashire FY6 8JL (6 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment. (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
57.08 MW
ACS&T - Tewkesbury - Site 1, Newtown Trading Est/Green La, Tewkesbury GL20 8HD (15 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
24.18 MW
Loading map...
Showing 19 locations