Reciprocating engines

9 unique locations (278 components)

Traston Road, Off Corporation Road, Newport , Gwent, NP19 4RQ (26 components)
• Generating Unit 1
• ROCable hydro units within the BMU are not included in the CMU.
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
49.17 MW
Plot 4, South Kirkby Business Park, Hemsworth, WF9 3TJ (7 components)
• A 8MW New Build gas fuelled generating station.
• Gas fired reciprocating engines.
• Generating Unit 2
Active • 2026-27 (T-4), 2023-24 (T-4) ...
20.96 MW
Millerhill Recycling & Energy Recovery Centre Whitehill Road DALKEITH EH22 1SX (12 components)
• FCC (E+M) Limited, 170kT Energy from Waste plant at Newcraighall with estimated 14 MW Generation Capacity. Auxilliary load is not included in connection capacity .i.e the export is net.
• Generating Unit 2
• New CMU ID due to updated Grid Connection Agreement FCC (E+M) Limited, 170kT Energy from Waste plant at Newcraighall with estimated 14 MW Generation Capacity. Auxilliary load is not included in connection capacity .i.e the export is net.
Active • 2028-29 (T-4), 2024-25 (T-4) ...
46.94 MW
Land off Ely Road, Chittering, Cambridge, Cambridgeshire, CB25 9PN (9 components)
• Gas-fired reciprocating engines fitted with heat and CO2 recovery equipment, plus transformers, switchgear and associated controls with a total connection capacity of 9MW.
• Genset 3
• The CMU component at Breach Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 MW.
Active • 2025-26 (T-4), 2024-25 (T-4) ...
24.30 MW
Land Adjacent to Stobarts Logistics Off Branthwaite Road Lillyhall Workington Cumbria CA14 4ED (16 components)
• Gas reciprocating engines
• Generating Unit 2
• The East West Interconnector (EWIC) is a 400kV HVDC link between Connah's Quay in Wales and Woodland in Ireland.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
22.75 MW
Greengate Works Power Station, Sutton Heath Road or Burtonhead Road, St Helens, WA9 5DS (23 components)
• Generating Unit 2
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
28.28 MW
Foyers Power Station, Kelvin Way, Gorthleck, Foyers, Inverness-shire, IV2 6YB (17 components)
• Component has yet to be procured.
• Gas peaking reciprocating engines
• Generating Unit 1
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
204.51 MW
Fiddler's Ferry Power Station, Widnes Road, Cuerdley, Warrington, WA5 2UT (166 components)
• GT3
• Genset 1.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2027-28 (T-4), 2025-26 (T-4) ...
13899.76 MW
Aldon Road, Poulton - Le - Fylde, Lancashire FY6 8JL (2 components)
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
• Genset 3
Active • 2027-28 (T-4), 2022-23 (T-4)
Loading map...
Showing 9 locations