Reciprocating engines

89 unique locations (963 components) - Page 1 of 4

1 Maxwell Road, Woodston Industrial Estate, Peterborough PE2 7JB (7 components)
• This CMU is 10*2MW reciprocating engines using HVO.
• This CMU is 10*2MW reciprocating engines.
• This CMU is 6*2MW reciprocating engines.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
37.40 MW
23 Whittle Road, Ferndale Industrial Estate, Wimborne, BH21 7PW (8 components)

CMU consisting of multiple reciprocating engines and alternators

Active • 2025-26 (T-4), 2024-25 (T-1) ...
19.28 MW
3 Nairn Road, Deans Industrial Estate, Livingston, West Lothian, EH54 8AY (13 components)
• Newbuild gas generator
• Reciprocating engine (natural gas fuelled)
Active • 2026-27 (T-4), 2025-26 (T-1) ...
31.49 MW
46 Station Road Stokesley Middlesbrough TS9 7AA (16 components)
• 2 x 2.25 Gas reciprocating engines to be installed at Cleveland Nurseries (replacing existing CHP)
• Gas CHP engines in commercial horticultural usage with no auxilliary load
Active • 2027-28 (T-4), 2025-26 (T-4) ...
20.43 MW
7 COWLEY WAY CREWE CW1 6AE (8 components)

CMU consisting of multiple gas reciprocating engines and alternators

Active • 2024-25 (T-4), 2023-24 (T-1) ...
10.25 MW
Abercorn Street, Paisley, PA3 4DF (8 components)

A new build, gas fuelled generation station.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
76.15 MW
Aldon Road, Poulton-le-Fylde, Lancashire FY6 8JL (6 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
42.84 MW
Alne Material Recovery Facility, Forest Lane, Alne, York, YO61 1TU (14 components)
• Existing Generating CMU comprising of a gas fuelled reciprocating engine and gas delivery plant.
• New Build Generating CMU comprising of a CHP asset producing energy from waste.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
14.36 MW
Arlesey Landfill Site Mill Lane Arlesey Bedfordshire SG15 6RF (17 components)
• Gas reciprocating engines
• The system comprises of two gas reciprocating engines provided an exported output of around 2MW.
Active • 2027-28 (T-4), 2025-26 (T-4) ...
9.84 MW
Ashland Cottage Farm, Beck Lane, Sutton in Ashfield, NG17 3AH (14 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2024-25 (T-4), 2023-24 (T-1) ...
30.46 MW
Ashton Old Road, Openshaw, Manchester M11 1AA (7 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
68.54 MW
Aveley Landfill Site Sandy Lane Aveley RM15 4XP (28 components)
• 4x gas reciprocating engines with a combined output of approximately 4.3MW. All associated gas delivery equipment and switchgear is included. The generating units are connected to the distribution network.
• Gas fired generating units
• Gas reciprocating engines
Active • 2027-28 (T-4), 2025-26 (T-4) ...
7.71 MW
Booker Cash and Carry Didcot OX11 7HJ (12 components)

A completed power plant, with associated civil works, switchgear and electrical connection.

Active • 2026-27 (T-4), 2025-26 (T-4) ...
12.57 MW
Booker Cash and Carry Frobisher Way Hatfield Hertfordshire AL10 9TR (16 components)

A completed power plant, with associated civil works, switchgear and electrical connection.

Active • 2028-29 (T-4), 2026-27 (T-4) ...
27.31 MW
Briar Chemicals, Sweet Briar Road, Norwich, NR6 5AP (5 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2026-27 (T-4), 2023-24 (T-1)
30.46 MW
Bristol Royal Infirmary, Marlborough Hill, Bristol, BS2 8HW (15 components)
• 1 * 1.7MW diesel reciporcating engine
• 1 * 1.7MW diesel reciprocating engine
Active • 2026-27 (T-4), 2025-26 (T-4) ...
10.19 MW
Bristol Royal Infirmary, Marlborough Hill, Bristol, BS2 8HW (12 components)
• 1 * 1.7MW diesel reciporcating engine
• 1 * 1.7MW diesel reciprocating engine
Active • 2026-27 (T-4), 2025-26 (T-4) ...
10.22 MW
Bristol Royal Infirmary, Marlborough Hill, Bristol, BS2 8HW (15 components)
• 1 * 1.7MW diesel reciporcating engine
• 1 * 1.7MW diesel reciprocating engine
Active • 2026-27 (T-4), 2025-26 (T-4) ...
10.19 MW
Bristol Royal Infirmary, Marlborough Hill, Bristol, BS2 8HW (14 components)

1 * 1.7MW diesel reciprocating engine

Active • 2026-27 (T-4), 2025-26 (T-4) ...
10.19 MW
Cheshire Power Station North Road Ellesmere Port Cheshire CH65 1AF (7 components)
• CMU will be formed of multiple individual gas reciprocating gas engines.
• CMU will be formed of multiple individual reciprocating gas engines.
Inactive • 2023-24 (T-1), 2023-24 (T-4) ...
57.11 MW
Chickenhall Lane, Eastleigh, SO50 6RQ (4 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2024-25 (T-1), 2023-24 (T-1)
20.50 MW
Cps House, Stephenson Road, Severalls Industrial Park, Colchester, CO4 9QR (3 components)

CMU consisting of multiple reciprocating engines and alternators

Active • 2026-27 (T-4), 2023-24 (T-1)
17.36 MW
Crosby Power, Church Street, Bootle, L20 1AF (6 components)

CMU consisting of multiple reciprocating engines and alternators

Active • 2025-26 (T-4), 2023-24 (T-1) ...
8.20 MW
Dock Yard Power, Dock Yard Road, Ellesmere Port, CH65 4EF (9 components)

CMU consisting of multiple reciprocating engines and alternators

Active • 2025-26 (T-4), 2024-25 (T-1) ...
11.91 MW
Drake Grove, Burndell Road, Yapton, Arundel, BN18 0HX (7 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2026-27 (T-4), 2025-26 (T-1) ...
40.94 MW
Loading map...
Showing 25 locations