Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

59 unique locations (228 components) - Page 1 of 3

Active MW: 14652.51 MW
Inactive MW: 930.44 MW
Wheldale Generation Site Wheldon Road Castleford West Yorkshire WF10 2RT (1 component)

Gas reciprocating engines.

Reciprocating engines ALKANE ENERGY UK LIMITED Existing Generating CMU CMM Portfolio WF10
Active • 2024-25 (T-1)
1.22 MW
Wellington Street, Oldham, Lancashire OL4 1SA (7 components)
• Energy facility comprising of battery energy storage sets and ancillary equipment. (2)
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
Reciprocating engines Storage (Duration 2h) STOR 108 LTD HAMILTON LANE POWER LIMITED New Build Generating CMU Hamilton Hamilton +3 more OL4
Active • 2026-27 (T-4), 2024-25 (T-1) ...
25.00 MW
Wallingford Road, Goring, Reading, RG8 0HS (3 components)

A 6.9MW gas fuelled generating station. (3)

Reciprocating engines GORING POWER LTD New Build Generating CMU GORING GORING +1 more RG8
Active • 2026-27 (T-4), 2025-26 (T-1) ...
19.53 MW
Tweedale Way, Oldham OL9 8EH (4 components)

CMU consisting of multiple reciprocating engines and alternators (3)

Reciprocating engines URBAN RESERVE (ASSETCO 2) LIMITED New Build Generating CMU Scholes Power OL9
Active • 2025-26 (T-4), 2024-25 (T-1) ...
8.64 MW
1.04 MW
Toray 1 Toray Textiles ImportExport Crown Farm Way Mansfield Nottingham NG19 0FN (2 components)
• Gas fired generating unit
• Gas reciprocating engines
Reciprocating engines ALKANE ENERGY UK LIMITED Existing Generating CMU A11703 Torays NG19
Active • 2024-25 (T-1), 2019-20 (T-1)
Tickhill Road Rotherham South Yorkshire S66 7QW (1 component)

Gas reciprocating engines

Reciprocating engines ALKANE ENERGY UK LIMITED Existing Generating CMU Maltby S66
Active • 2024-25 (T-1)
1.98 MW
The Manorway, Stanford-leHope, SS17 9LL (5 components)
• A gas fuelled generating station (2)
• A Battery Energy Storage System
Reciprocating engines Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h) CORPOWER LIMITED New Build Generating CMU Corpower Corpower +3 more Not Prequalified SS17
Active • 2025-26 (T-4), 2024-25 (T-1)
8.21 MW
Rosper Road Immingham North Lincolnshire DN40 3DZ (1 component)

New build gas reciprocating multi-engine generating plant

Reciprocating engines VPI IMMINGHAM ENERGY PARK A LIMITED New Build Generating CMU VPI Energy Park A DN40
Active • 2024-25 (T-1)
47.08 MW
Rhodesia Power Limited, Highgrounds Industrial Estate Highgrounds road, Rhodesia, Worksop, S80 3AT (3 components)

The CMU component consist of gas fired reciprocating engines, organic rankine cycle turbines and stack gas-recovery carbon capture to be installed on designated land at Rhodesia Power Limited, Highgrounds Industrial … (3)

Reciprocating engines RHODESIA POWER LIMITED New Build Generating CMU Rhodesia Power Limited S80
Active • 2025-26 (T-1), 2024-25 (T-1) ...
28.30 MW
Radstone Rd, Radstone, Brackley NN13 5PY (5 components)
• A new build diesel or gas grid support plant
• An Existing diesel grid support plant
• An Exiting diesel grid support plant
Reciprocating engines OCGT and Reciprocating Engines HALL FARM ENERGY LIMITED Existing Generating CMU Hall Farm Hall Farm +2 more NN13
Active • 2025-26 (T-1), 2024-25 (T-1) ...
9.39 MW
Pye Bridge Industrial Estate, Somercotes, Alfreton, DE55 4NX (9 components)
• Reciprocating gas engines running on natural gas (2)
• Additional reciprocating gas engines running on natural gas returned to service
Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas) PYEBRIDGE POWER LTD Existing Generating CMU Gas Generation Pye Bridge Gas Generation Pye Bridge +4 more DE55
Active • 2027-28 (T-4), 2026-27 (T-4) ...
22.72 MW
Prowse's Lane, Axbridge, BS26 2HP. (3 components)

Total installed capacity is 6.9MW gas reciprocating engines to be installed on designated land within a compound. (3)

Reciprocating engines BIOGAS TECHNOLOGY LIMITED New Build Generating CMU Axbridge Axbridge +1 more BS26
Active • 2025-26 (T-4), 2024-25 (T-1) ...
13.08 MW
Prince of Wales Energy Park Land off Skinner Lane Pontefract WF8 1HG (1 component)

Gas reciprocating engines

Reciprocating engines ALKANE ENERGY UK LIMITED Existing Generating CMU CMM Portfolio WF8
Active • 2024-25 (T-1)
0.47 MW
On land off Nairn Road, Deans Industrial Estate, Livingston, EH54 8AY (6 components)

A new build, gas fuelled generation station. (3)

Reciprocating engines DRUMCROSS GENERATION LIMITED New Build Generating CMU Drumcross Generation Limited Drumcross Generation Limited +3 more EH54
Active • 2025-26 (T-4), 2024-25 (T-1) ...
18.78 MW
Old Littleton Road, Chertsey, Surrey, TW17 9NU (5 components)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (2)
• A New Build gas generating station..
Reciprocating engines CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Castle Bromwich Chertsey +2 more TW17
Active • 2028-29 (T-4), 2027-28 (T-4) ...
62.02 MW
Newton Aycliffe CO Durham DL5 6EA (6 components)

Existing Gas Engine (3)

Active • 2024-25 (T-1), 2023-24 (T-1) ...
3.22 MW
Newmarket Lane Stanley Near Wakefield WF3 4BY (1 component)

Gas reciprocating engines

Reciprocating engines ALKANE ENERGY UK LIMITED Existing Generating CMU CMM Portfolio WF3
Active • 2024-25 (T-1)
0.30 MW
Neston Power Generation Plant, Longacres Road, Clayhill Light Industrial Park, Neston, CH64 3RL (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Reciprocating engines CONRAD (NESTON) LIMITED New Build Generating CMU Neston CH64
Active • 2024-25 (T-1)
2.36 MW
Millfield Lane Haydock Industrial Estate Haydock St Helens WA11 9UT (4 components)

A completed power plant, with associated civil works, switchgear and electrical connection. (3)

Reciprocating engines PEAK GEN POWER LIMITED Existing Generating CMU Peak Gen Power Haydock Peak Gen Power Haydock +2 more WA11
Active • 2024-25 (T-1), 2023-24 (T-1) ...
10.26 MW
M65, Accrington BB5 5WE (4 components)
• gas fired reciprocating engines (2)
• Gas fired reciprocating engines.
Active • 2024-25 (T-1), 2020-21 (T-4) ...
19.60 MW
Llay Grid Capacity Site Llay Hall Farm Llay Wrexham LL12 0TH (1 component)

3.4MW of installed capacity of gas fuelled reciprocating engines to be installed on designated land.

Reciprocating engines LLAY POWER LIMITED New Build Generating CMU Llay LL12
Active • 2024-25 (T-1)
3.21 MW
LAND ON THE SOUTH SIDE OF ROYDON ROAD HARLOW CM19 5GH (4 components)
• CMU consisting of a gas reciprocating engine and an alternator (2)
• CMU consisting of multiple gas reciprocating engines and alternators
Reciprocating engines URBAN RESERVE (ASSETCO) LIMITED Existing Generating CMU New Build Generating CMU Elizabeth Power Elizabeth Power Rejected CM19
Active • 2024-25 (T-1), 2023-24 (T-1) ...
9.48 MW
Land On The North Side Of Kerfoot Street Warrington, WA2 8NT (4 components)

CMU consisting of multiple reciprocating engines and alternators (3)

Reciprocating Engines Reciprocating engines URBAN RESERVE (ASSETCO 2) LIMITED New Build Generating CMU Kerfoot Power Kerfoot Power WA2
Active • 2025-26 (T-4), 2024-25 (T-1) ...
7.68 MW
Loading map...
Showing 25 locations