Reciprocating engines

49 unique locations (464 components) - Page 1 of 2

Wheldale Generation Site Wheldon Road Castleford West Yorkshire WF10 2RT (2 components)

Gas reciprocating engines.

Active • 2024-25 (T-1), 2024-25 (T-4)
7.60 MW
Tweedale Way, Oldham OL9 8EH (9 components)

CMU consisting of multiple reciprocating engines and alternators

Active • 2025-26 (T-4), 2024-25 (T-1) ...
21.69 MW
Toray 2 Toray Textiles ImportExport Crown Farm Way Mansfield Nottingham NG19 0FN (2 components)
• Gas reciprocating engines
• Gas reciprocating engines.
Active • 2024-25 (T-1), 2024-25 (T-4)
2.09 MW
Toray 1 Toray Textiles ImportExport Crown Farm Way Mansfield Nottingham NG19 0FN (9 components)
• Gas fired generating unit
• Gas generating unit(s)
• Gas reciprocating engines
Active • 2024-25 (T-1), 2023-24 (T-4) ...
Tickhill Road Rotherham South Yorkshire S66 7QW (1 component)

Gas reciprocating engines

Active • 2024-25 (T-1)
1.98 MW
Scawby Brook, Scawby, Brigg, DN20 9LT. (3 components)

Brigg Gas Peaker

Active • 2026-27 (T-4), 2025-26 (T-1) ...
135.85 MW
Rosper Road Immingham North Lincolnshire DN40 3DZ (10 components)
• Battery storage unit
• Gas CHP on South bank of river Humber providing electricity and industrial steam
• New build gas reciprocating multi-engine generating plant
Active • 2028-29 (T-4), 2024-25 (T-1) ...
1165.32 MW
Rochester Power Generation Plant, Whitewall Road, Medway City Estate, Rochester, Kent, ME2 4DZ (13 components)
• Existing Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2026-27 (T-4), 2025-26 (T-1) ...
52.07 MW
Rhodesia Power Limited, Highgrounds Industrial Estate Highgrounds road, Rhodesia, Worksop, S80 3AT (6 components)

The CMU component consist of gas fired reciprocating engines, organic rankine cycle turbines and stack gas-recovery carbon capture to be installed on designated land at Rhodesia Power Limited, Highgrounds Industrial …

Active • 2026-27 (T-4), 2025-26 (T-1) ...
56.69 MW
Rectory Field, Cards Road, Sandon, CM2 7AE (8 components)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
53.54 MW
Radstone Rd, Radstone, Brackley NN13 5PY (9 components)
• A new build diesel or gas grid support plant
• An Existing diesel grid support plant
• An Exiting diesel grid support plant
Active • 2025-26 (T-1), 2024-25 (T-1) ...
14.07 MW
Pye Bridge Industrial Estate, Somercotes, Alfreton, DE55 4NX (15 components)
• Additional reciprocating gas engines running on natural gas returned to service
• Reciprocating gas engines running on natural gas
Active • 2026-27 (T-4), 2024-25 (T-1) ...
25.06 MW
Prowse's Lane, Axbridge, BS26 2HP. (5 components)

Total installed capacity is 6.9MW gas reciprocating engines to be installed on designated land within a compound.

Active • 2024-25 (T-1), 2023-24 (T-1)
26.15 MW
0.47 MW
Old Littleton Road, Chertsey, Surrey, TW17 9NU (3 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2028-29 (T-4), 2027-28 (T-4) ...
40.79 MW
Newmarket Lane Stanley Near Wakefield WF3 4BY (1 component)

Gas reciprocating engines

Active • 2024-25 (T-1)
0.30 MW
Neston Power Generation Plant, Longacres Road, Clayhill Light Industrial Park, Neston, CH64 3RL (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2024-25 (T-1)
2.36 MW
M65, Accrington BB5 5WE (10 components)
• Gas fired reciprocating engines.
• gas fired reciprocating engines
Active • 2024-25 (T-1), 2020-21 (T-4) ...
39.21 MW
Llay Grid Capacity Site Llay Hall Farm Llay Wrexham LL12 0TH (4 components)
• 3.4MW of installed capacity of gas fuelled reciprocating engines to be installed on designated land.
• 3MW of installed capacity of gas fuelled reciprocating engines to be installed on designated land.
Active • 2024-25 (T-1), 2023-24 (T-4) ...
6.06 MW
LAND ON THE SOUTH SIDE OF ROYDON ROAD HARLOW CM19 5GH (10 components)
• CMU consisting of a gas reciprocating engine and an alternator
• CMU consisting of multiple gas reciprocating engines and alternators
Active • 2024-25 (T-1), 2024-25 (T-4) ...
14.44 MW
Land On The North Side Of Kerfoot Street Warrington, WA2 8NT (6 components)

CMU consisting of multiple reciprocating engines and alternators

Active • 2026-27 (T-4), 2024-25 (T-1) ...
19.25 MW
LAND ON THE NORTH SIDE OF HOWARD CHASE BASILDON SS14 3BD (15 components)
• CMU consisting of a gas reciprocating engine and alternator
• CMU consisting of multiple reciprocating engines and alternators
Active • 2025-26 (T-4), 2024-25 (T-1) ...
30.22 MW
Land off Bowbridge Lane, Balderton, Newark NG24 3BY (9 components)
• 4 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Bowbridge Lane
• Containerised High Speed Gas-fired reciprocating engines together with transformers, switchgear and associated control gear
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2025-26 (T-4), 2024-25 (T-1) ...
46.53 MW
Land off Axe Road, Colley Lane Industrial Estate, Bridgwater, TA6 5LP (11 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2025-26 (T-4), 2024-25 (T-1) ...
41.02 MW
Loading map...
Showing 25 locations