Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

49 unique locations (464 components) - Page 1 of 2

23 Whittle Road, Ferndale Industrial Estate, Wimborne, BH21 7PW (8 components)

CMU consisting of multiple reciprocating engines and alternators

Active • 2025-26 (T-4), 2024-25 (T-1) ...
19.28 MW
Alne Material Recovery Facility, Forest Lane, Alne, York, YO61 1TU (14 components)
• Existing Generating CMU comprising of a gas fuelled reciprocating engine and gas delivery plant.
• New Build Generating CMU comprising of a CHP asset producing energy from waste.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
14.36 MW
Arlesey Landfill Site Mill Lane Arlesey Bedfordshire SG15 6RF (17 components)
• Gas reciprocating engines
• The system comprises of two gas reciprocating engines provided an exported output of around 2MW.
Active • 2027-28 (T-4), 2025-26 (T-4) ...
9.84 MW
0.22 MW
Aveley Landfill Site Sandy Lane Aveley RM15 4XP (28 components)
• 4x gas reciprocating engines with a combined output of approximately 4.3MW. All associated gas delivery equipment and switchgear is included. The generating units are connected to the distribution network.
• Gas fired generating units
• Gas reciprocating engines
Active • 2027-28 (T-4), 2025-26 (T-4) ...
7.71 MW
Aveley Landfill Site, Sandy Lane, Aveley, RM15 4XP (3 components)

Gas reciprocating engines

Active • 2027-28 (T-4), 2025-26 (T-1) ...
2.78 MW
Batleys Cash and Carry Gielgud Way Coventry CV2 2SZ (16 components)

A completed power plant, with associated civil works, switchgear and electrical connection.

Active • 2028-29 (T-4), 2026-27 (T-4) ...
39.67 MW
Bentinck Generating Station, Mill Lane, Nottinghamshire NG17 9LJ (4 components)

An electrical power generating unit comprised of multiple gas reciprocating engines with an aggregated exporting capacity totalling 4.5MW.

Active • 2025-26 (T-1), 2024-25 (T-1)
12.70 MW
Cheshire Power Station, North Road, Ellesmere Port, Cheshire, CH65 1AF (1 component)

CMU formed of multiple individual Reciprocating Engines

Active • 2024-25 (T-1)
18.85 MW
Chickenhall Lane, Eastleigh, SO50 6RQ (4 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2024-25 (T-1), 2023-24 (T-1)
20.50 MW
Dock Yard Power, Dock Yard Road, Ellesmere Port, CH65 4EF (9 components)

CMU consisting of multiple reciprocating engines and alternators

Active • 2025-26 (T-4), 2024-25 (T-1) ...
11.91 MW
Drake Grove, Burndell Road, Yapton, Arundel, BN18 0HX (7 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2026-27 (T-4), 2025-26 (T-1) ...
40.94 MW
Ellifoot Lane, Burstwick, HU12 9EB (8 components)
• A Distribution Connected 4.5MW gas fueled generating station
• a Combined Heat and Power Plant
Active • 2028-29 (T-4), 2025-26 (T-1) ...
29.03 MW
Garden Lane Cadeby Doncaster DN5 7SN (2 components)

Gas reciprocating engines.

Active • 2025-26 (T-4), 2024-25 (T-1)
1.96 MW
Grain Road Isle of Grain Rochester ME3 0AB (10 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2025-26 (T-4), 2024-25 (T-1) ...
26.61 MW
Grimsby Power Station Moody Lane Grimsby DN31 2SW (17 components)
• CMU will be formed of multiple individual gas reciprocating engine units
• Ten (10) 2MWe gas reciprocating gas engines
Active • 2025-26 (T-4), 2024-25 (T-1) ...
152.20 MW
Guernsey Road, Bletchley, Milton Keynes, Buckinghamshire, MK3 5FR (17 components)

Gas reciprocating engines

Active • 2027-28 (T-4), 2024-25 (T-1) ...
24.80 MW
Hanson Street, Middleton, Manchester, M24 2YP (8 components)

CMU consisting of multiple reciprocating engines and alternators

Active • 2025-26 (T-4), 2024-25 (T-1) ...
19.28 MW
Howard Road, Park Farm Industrial Estate, Redditch, B98 7SE (8 components)

Redditch 20MW Gas Peaker Project

Active • 2026-27 (T-4), 2024-25 (T-1) ...
112.91 MW
66.82 MW
Land at Capenhurst Sub Station, Capenhurst, Cheshire, CH66 2HJ (3 components)
• A New Build Battery Energy Storage System
• A New Build Gas fuelled power plant at Capenhurst substation
Active • 2024-25 (T-1), 2023-24 (T-4) ...
12.92 MW
Land at Enterprise Court, Corby, NN18 8ES (83 components)

Reciprocating genset

Active • 2028-29 (T-4), 2027-28 (T-4) ...
55.87 MW
Land at Wolverhampton Road, Oldbury, B69 4RJ (13 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2024-25 (T-1), 2024-25 (T-4) ...
51.41 MW
Land off Axe Road, Colley Lane Industrial Estate, Bridgwater, TA6 5LP (11 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2025-26 (T-4), 2024-25 (T-1) ...
41.02 MW
Loading map...
Showing 25 locations