Reciprocating engines

9 unique locations (266 components)

Unproven DSR yet to be procured (46 components)
• Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 8MW.
• N/A
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Rochester Power Generation Plant, Whitewall Road, Medway City Estate, Rochester, Kent, ME2 4DZ (17 components)
• Existing Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters
Active • 2026-27 (T-4), 2025-26 (T-1) ...
52.07 MW
Land on the south west of Brigg Road, Scunthorpe, North Lincolnshire, DN16 1AP (21 components)
• Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations
• Multiple gas engines capable of exporting electricity.
• The CMU is a Open Cycle Gas Turbine (OCGT)
Active • 2026-27 (T-4), 2024-25 (T-4) ...
323.62 MW
Land north of the railway Line, Bellamour Lane, Wolsey Bridge  WS15 3JS (17 components)
• Component has yet to be procured.
• Gas peaking reciprocating engine
• N/A
Active • 2026-27 (T-4), 2025-26 (T-4) ...
190.51 MW
Greatmoor EfW, Greatmoor Road, Woodham, Aylesbury, Buckinghamshire, HP18 0QE (16 components)
• District heating implementation with one asset 1.943MW exporting excess to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
• Genset 2.
• This CMU identifier is the replacement for BUCK01, BUCK02, FCCB01, due to the change in Connection Capacity as per rule 3.5.2 and change from "New build CMU" to "Existing CMU" status FCC Buckinghamshire Ltd. 300kT Energy from Waste Plant with c. 25MW net output. Auxiliary load is not included in the connection capacity i.e the export is net.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
94.17 MW
EDF Energy, Hunterston B power station, West Kilbride, Ayrshire, KA23 9QX (40 components)
• Existing CCGT Unit
• Hunterston B Power Station CMU 7: [HU7-21] T_HUNB-7 + (50% x T_HUNB-D) + (50% x E_HUNB-11S)
• Hunterston B Power Station CMU 8: [HU8-21] T_HUNB-8 + (50% x T_HUNB-D) + (50% x E_HUNB-11S)
Active • 2025-26 (T-4), 2024-25 (T-4) ...
1607.21 MW
EDF Energy, Heysham 1 power station, Morecambe, Lancashire, LA3 2XH (33 components)
• EV charge station
• Heysham 1 Power Station CMU 1: [HY1124] T_HEYM11
• Heysham 1 Power Station CMU 2: [HY1224] T_HEYM12
Active • 2028-29 (T-4), 2026-27 (T-4) ...
2591.79 MW
Cargill PLC, Trafford Park, Manchester, M17 1PA (69 components)
• Siemens SGT200 based CHP
• Solar T70 Based CHP System
• Solar T70 based CHP system
Active • 2028-29 (T-4), 2025-26 (T-4) ...
93.80 MW
Asda Sheffield Drakehouse, Joan Ln, Bamford, Hope Valley S33 0AW (7 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• Load reduction on site supported by non-exporting standby generation.
• Sizewell B Power Station CMU 1: [SZ1-20] T_SIZB-1 + (50% x T_SIZB-D)
Active • 2027-28 (T-4), 2024-25 (T-4) ...
7.43 MW
Loading map...
Showing 9 locations