Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

142 unique locations (1636 components) - Page 1 of 6

10-14 Birmingham Road, West Bromwich, B71 4LD (6 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2021-22 (T-1), 2024-25 (T-4)
132 Manchester Road, Carrington, Manchester, M31 4AY (12 components)
• 5 x 9.98MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
• New combined cycle gas turbine unit comprising the latest technology gas turbines, heat recovery steam generators, steam turbines and associated balance of plant. This will be constructed on Carrington Manchester
• One 4.5MW Gas Reciprocating engine with all ancillary equipment to be installed on the Trafford Power Site
Active • 2021-22 (T-4), 2022-23 (T-4) ...
1761.93 MW
135 CLYDESDALE PLACE MOSS SIDE INDUSTRIAL ESTATE LEYLAND PR26 7QS (7 components)
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
• CMU consisting of multiple reciprocating engines and alternators
Active • 2020-21 (T-1), 2022-23 (T-3) ...
9.68 MW
1A Elms Farm Industrial Estate Edison Road Bedford Bedfordshire MK41 0HU (26 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW.

Active • 2023-24 (T-4), 2024-25 (T-4) ...
14.23 MW
1 Kirkshaw Lane, Ferrybridge, Knottingley, WF11 8RD (2 components)
• AN 8MW new build gas generating station..
• CMU FES002 which is an electrical power generating unit comprised of multiple gas reciprocating engines with an aggregated exporting capacity totalling 8MW. The CMU is located at: 1 Kirkshaw Lane, Ferrybridge, Knottingley, WF11 8RD.
Active • 2024-25 (T-4)
15.24 MW
2 South Wardpark Place, Wardpark, Cumbernauld, Glasgow, North Lanarkshire, G67 3HX (37 components)
• New build gas generator
• Operational Reciprocating Engine
• Operational gas reciprocating engine.
Active • 2022-23 (T-3), 2022-23 (T-4) ...
11.29 MW
46 Station Road Stokesley Middlesbrough TS9 7AA (16 components)
• 2 x 2.25 Gas reciprocating engines to be installed at Cleveland Nurseries (replacing existing CHP)
• Gas CHP engines in commercial horticultural usage with no auxilliary load
Active • 2023-24 (T-1), 2023-24 (T-4) ...
20.43 MW
4 Finway Road Hemel Hempstead HP2 7PT (25 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW

Active • 2023-24 (T-4), 2024-25 (T-4) ...
14.23 MW
7 COWLEY WAY CREWE CW1 6AE (8 components)

CMU consisting of multiple gas reciprocating engines and alternators

Active • 2021-22 (T-1), 2022-23 (T-1) ...
10.25 MW
Abercorn Street, Paisley, PA3 4DF (8 components)

A new build, gas fuelled generation station.

Active • 2022-23 (T-3), 2022-23 (T-4) ...
76.15 MW
Adjacent to Seal Sand Bulk Storage Facility Seal Sands Stockton-on-Tees Cleveland TS2 1UB (8 components)
• Existing OCGT
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output.
Active • 2022-23 (T-4), 2023-24 (T-4) ...
83.72 MW
Adsworth Road, Stockport, SK3 8LF (4 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2021-22 (T-1), 2024-25 (T-4)
Aldon Road, Poulton-le-Fylde, Lancashire FY6 8JL (6 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment.

Active • 2022-23 (T-3), 2022-23 (T-4) ...
42.84 MW
APS Growers Ltd / Branfield Nursery 111 Stockbridge Road Elloughton HU15 1HW (27 components)
• One Jenbacher CHP engine with a generation capacity of 3.36 MW
• The new Energy Centre will consist of one Jenbacher CHP engine with a generation capacity of 3.36 MW and a thermal output of 3.984 MW.
Active • 2024-25 (T-4), 2025-26 (T-4) ...
18.47 MW
Arlesey Landfill Site Mill Lane Arlesey Bedfordshire SG15 6RF (17 components)
• Gas reciprocating engines
• The system comprises of two gas reciprocating engines provided an exported output of around 2MW.
Active • 2023-24 (T-1), 2024-25 (T-1) ...
9.84 MW
Ashland Cottage Farm, Beck Lane, Sutton in Ashfield, NG17 3AH (14 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2021-22 (T-1), 2022-23 (T-1) ...
30.46 MW
Ash Road, Protos, CH2 4RX (1 component)

49.5 MW Gas Reciprocating Engines envisaged to be made up of multiple modules.

Active • 2024-25 (T-4)
47.13 MW
Ashton Old Road, Openshaw, Manchester M11 1AA (7 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment.

Active • 2022-23 (T-3), 2022-23 (T-4) ...
68.54 MW
Batleys Cash and Carry Gielgud Way Coventry CV2 2SZ (16 components)

A completed power plant, with associated civil works, switchgear and electrical connection.

Active • 2024-25 (T-1), 2024-25 (T-4) ...
39.67 MW
Batleys Cash and Carry Talbot Road Fareham PO15 5RY (16 components)
• A completed power plant, with associated civil works, switchgear and electrical connection.
• The CMU component is net of the auxiliary power required
Active • 2024-25 (T-4), 2025-26 (T-4) ...
131.72 MW
Bentinck Electricity Generating Plant Mill Lane Kirkby In Ashfield Nottinghamshire NG17 9LG (4 components)

Gas engine peaker plant providing capacity market, power trading and other balancing services.

Active • 2021-22 (T-1), 2024-25 (T-4)
Bond Avenue Bletchley Milton Keynes MK1 1JJ (27 components)

The CMU component comprises of three 2MW Reciprocating Gas Engines

Active • 2024-25 (T-4), 2025-26 (T-4) ...
28.70 MW
Bones lane, Cheddleton, Leek, Staffordshire, ST13 7BT (10 components)

1.9 MW Gas gen ENER-G 1999

Active • 2021-22 (T-4), 2022-23 (T-3) ...
3.77 MW
Booker Cash and Carry Didcot OX11 7HJ (12 components)

A completed power plant, with associated civil works, switchgear and electrical connection.

Active • 2022-23 (T-1), 2023-24 (T-1) ...
12.57 MW
Booker Cash and Carry Frobisher Way Hatfield Hertfordshire AL10 9TR (16 components)

A completed power plant, with associated civil works, switchgear and electrical connection.

Active • 2023-24 (T-1), 2024-25 (T-4) ...
27.31 MW
Loading map...
Showing 25 locations