Reciprocating engines

27 unique locations (140 components) - Page 1 of 2

Active MW: 14652.51 MW
Inactive MW: 930.44 MW
Welkin Road, Bredbury, SK6 2BH (6 components)
• Battery Energy Storage System (2)
• A gas fuelled generating station.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
16.07 MW
Wallingford Road, Goring, Reading, RG8 0HS (3 components)

A 6.9MW gas fuelled generating station. (3)

Reciprocating engines GORING POWER LTD New Build Generating CMU GORING GORING +1 more RG8
Active • 2026-27 (T-4), 2025-26 (T-1) ...
19.53 MW
Scawby Brook, Scawby, Brigg, DN20 9LT. (4 components)

Brigg Gas Peaker (3)

Reciprocating engines CENTRICA DISTRIBUTED GENERATION LIMITED New Build Generating CMU 8RESAK 8RESAK DN20
Active • 2026-27 (T-4), 2025-26 (T-1) ...
135.85 MW
Rochester Power Generation Plant, Whitewall Road, Medway City Estate, Rochester, Kent, ME2 4DZ (9 components)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (2)
• Existing Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Reciprocating Engines Reciprocating engines CONRAD (ROCHESTER) LIMITED New Build Generating CMU Rochester Rochester +1 more ME2
Active • 2026-27 (T-4), 2025-26 (T-1) ...
18.91 MW
Rhodesia Power Limited, Highgrounds Industrial Estate Highgrounds road, Rhodesia, Worksop, S80 3AT (3 components)

The CMU component consist of gas fired reciprocating engines, organic rankine cycle turbines and stack gas-recovery carbon capture to be installed on designated land at Rhodesia Power Limited, Highgrounds Industrial … (3)

Reciprocating engines RHODESIA POWER LIMITED New Build Generating CMU Rhodesia Power Limited S80
Active • 2025-26 (T-1), 2024-25 (T-1) ...
28.30 MW
Rectory Field, Cards Road, Sandon, CM2 7AE (6 components)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (2)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
38.31 MW
Radstone Rd, Radstone, Brackley NN13 5PY (5 components)
• A new build diesel or gas grid support plant
• An Existing diesel grid support plant
• An Exiting diesel grid support plant
Reciprocating engines OCGT and Reciprocating Engines HALL FARM ENERGY LIMITED Existing Generating CMU Hall Farm Hall Farm +2 more NN13
Active • 2025-26 (T-1), 2024-25 (T-1) ...
9.39 MW
Pye Bridge Industrial Estate, Pye Bridge, Somercotes, Alfreton DE55 4NX (2 components)

Gas fired peaking power plant (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
14.56 MW
Maybrook Road, Maybrook Business Park, Minworth, Sutton Coldfield, West Midlands, B76 1AL (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Reciprocating engines CONRAD (CASTLE BROMWICH) LIMITED New Build Generating CMU Castle Bromwich B76
Active • 2025-26 (T-1)
11.87 MW
Land off High View Road, South Normanton, Bolsover, Derbyshire, DE55 2EY (9 components)

Reciprocating genset (3)

Reciprocating engines FRP MERCIA HOLDCO 2 LIMITED New Build Generating CMU High View Road High View Road +1 more DE55
Active • 2027-28 (T-4), 2026-27 (T-4) ...
8.31 MW
land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL. (6 components)
• Gas reciprocating engines
• Thurrock Power Limited has secured a "blue chip" manufacturer as the EPC contractor to engineer, procure and construct a battery storage plant on at land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL.. Thurrock Power Limited will be constructed to be a brand new generating asset and is expected to have an equipment design life of 20 years. An experienced Operations & Maintenance contractor will be employed to ensure the plant is running effectively and efficiently to meet Capacity Market requirements. An Independent technical expert will be engaged to confirm the Plant will meet the Extended Years Criteria, Financial Commitment Milestone, and 6 monthly report for the Delivery Body as required under paragraph 8.3.6A of the Capacity Market Rules.
• Thurrock Power Limited has secured a "blue chip" manufacturer as the EPC contractor to engineer, procure and construct a gas power facility on at land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL.. Thurrock Power Limited will be constructed to be a brand new generating asset and is expected to have an equipment design life of 20 years. An experienced Operations & Maintenance contractor will be employed to ensure the plant is running effectively and efficiently to meet Capacity Market requirements. An Independent technical expert will be engaged to confirm the Plant will meet the Extended Years Criteria, Financial Commitment Milestone, and 6 monthly report for the Delivery Body as required under paragraph 8.3.6A of the Capacity Market Rules.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
817.08 MW
Land at Legacy Substation, Bronwylfa Road, Legacy, Wrexham, LL14 4HY (3 components)
• A Battery Energy Storage System (2)
• A gas fuelled generating station.
Reciprocating engines Storage (Duration 2h) HD639LEG LIMITED New Build Generating CMU Fryston Legacy +1 more LL14
Active • 2026-27 (T-4), 2025-26 (T-1) ...
28.95 MW
Land at Fordbridge Lane, Blackwell, DE55 5JY. (21 components)

Reciprocating genset (3)

Reciprocating engines FRP MERCIA HOLDCO 2 LIMITED New Build Generating CMU Fordbridge Lane Fordbridge Lane +1 more DE55
Active • 2027-28 (T-4), 2026-27 (T-4) ...
20.32 MW
Kingdom Avenue, Westbury, Wiltshire, BA13 4FG (2 components)

A gas fuelled electrical power generating unit comprising multiple reciprocating engines (2)

Reciprocating engines HEYWOOD POWER LIMITED New Build Generating CMU Hawkeridge Sudbury BA13
Active • 2026-27 (T-4), 2025-26 (T-1)
13.67 MW
Howard Road, Park Farm Industrial Estate, Redditch B98 7SE (2 components)

Redditch 20MW Gas Peaker

Reciprocating engines CENTRICA BARRY LIMITED Existing Generating CMU 8RESAI B98
Active • 2025-26 (T-1), 2025-26 (T-4)
18.51 MW
Hoon Hay Manor, Marston Lane, Hatton, Derby, DE65 5EA (14 components)

Reciprocating genset (3)

Reciprocating engines FRP MERCIA HOLDCO 2 LIMITED New Build Generating CMU Hatton Hatton +1 more DE65
Active • 2028-29 (T-4), 2027-28 (T-4) ...
11.06 MW
Felindre Road, Pencoed, Brigend, CF35 5HU (1 component)

New build 40MW gas Peaker plant

Reciprocating engines CENTRICA DISTRIBUTED GENERATION LIMITED New Build Generating CMU Not Prequalified CF35
Active • 2025-26 (T-1)
37.21 MW
Ellifoot Lane, Burstwick, HU12 9EB (5 components)
• a Combined Heat and Power Plant (2)
• A Distribution Connected 4.5MW gas fueled generating station
Active • 2028-29 (T-4), 2027-28 (T-4) ...
24.57 MW
Drake Grove, Burndell Road, Yapton, Arundel, BN18 0HX (4 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (3)

Reciprocating engines CONRAD (BILSHAM) LIMITED New Build Generating CMU Bilsham Bilsham +1 more BN18
Active • 2026-27 (T-4), 2025-26 (T-1) ...
27.23 MW
Dewi Road, Tregaron, SY25 6JP (2 components)

STOR diesel engines that will operate environmentally with mixed fuel (2)

Reciprocating engines GFI TREGARON LTD Existing Generating CMU Tregaron SY25
Active • 2025-26 (T-1), 2024-25 (T-1)
12.42 MW
Common Lane, Wath upon Dearne, Rotherham, South Yorkshire, S63 7DX (4 components)
• Battery energy storage unit (2)
• New reciprocating genset in acoustic enclosure
Reciprocating engines Storage (Duration 3h) FRP MERCIA HOLDCO LIMITED New Build Generating CMU Common Lane Common Lane S63
Active • 2028-29 (T-4), 2025-26 (T-1) ...
0.69 MW
Bentinck Generating Station, Mill Lane, Nottinghamshire NG17 9LJ (4 components)
• An electrical power generating unit comprised of multiple gas reciprocating engines with an aggregated exporting capacity totalling 4.5MW. (2)
• A 7.5MW new build gas generating station..
Active • 2027-28 (T-4), 2025-26 (T-1) ...
19.78 MW
Bentinck Generating Station, Mill Lane, Nottinghamshire NG17 9LG (2 components)

A 7.5MW new build gas generating station.. (2)

Reciprocating engines WALKER & SON (HAULIERS) LIMITED New Build Generating CMU FERRY1 FERRY1 NG17
Active • 2026-27 (T-4), 2025-26 (T-1)
14.15 MW
Aveley Landfill Site, Sandy Lane, Aveley, RM15 4XP (5 components)

Gas reciprocating engines (3)

Reciprocating engines ALKANE ENERGY UK LIMITED INFINIS ALTERNATIVE ENERGIES LIMITED Existing Generating CMU Aveley 13, 14 Aveley2 +1 more RM15
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4.62 MW
Alne Material Recovery Facility, Forest Lane, Alne, York, YO61 1TU (7 components)
• Existing Generating CMU comprising of a gas fuelled reciprocating engine and gas delivery plant.
• Generating CMU comprising of a CHP asset producing energy from waste
• New Build Generating CMU comprising of a CHP asset producing energy from waste.
Energy from Waste Reciprocating engines ALLIUM HELMSLEY LTD New Build Generating CMU Alne Alne +4 more YO61
Active • 2026-27 (T-4), 2025-26 (T-1) ...
8.05 MW
Loading map...
Showing 25 locations