34 unique locations (520 components) - Page 1 of 2

1 Maxwell Road, Woodston Industrial Estate, Peterborough PE2 7JB (7 components)
• This CMU is 10*2MW reciprocating engines using HVO.
• This CMU is 10*2MW reciprocating engines.
• This CMU is 6*2MW reciprocating engines.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
37.40 MW
22-30 Bell Street Great Britain Wigston LE18 1AD (3 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2025-26 (T-1), 2025-26 (T-4)
0.01 MW
3 Nairn Road, Deans Industrial Estate, Livingston, West Lothian, EH54 8AY (13 components)
• Newbuild gas generator
• Reciprocating engine (natural gas fuelled)
Active • 2026-27 (T-4), 2025-26 (T-1) ...
40.95 MW
AB35 (5 components)
• Domestic EV
• Domestic EV charger
Active • 2025-26 (T-1), 2025-26 (T-4) ...
4.79 MW
Alne Material Recovery Facility, Forest Lane, Alne, York, YO61 1TU (14 components)
• Existing Generating CMU comprising of a gas fuelled reciprocating engine and gas delivery plant.
• New Build Generating CMU comprising of a CHP asset producing energy from waste.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
16.76 MW
Aveley Landfill Site, Sandy Lane, Aveley, RM15 4XP (3 components)

Gas reciprocating engines

Active • 2027-28 (T-4), 2025-26 (T-1) ...
2.78 MW
Bentinck Generating Station, Mill Lane, Nottinghamshire NG17 9LG (2 components)

A 7.5MW new build gas generating station..

Active • 2025-26 (T-1)
14.02 MW
Bentinck Generating Station, Mill Lane, Nottinghamshire NG17 9LJ (4 components)

An electrical power generating unit comprised of multiple gas reciprocating engines with an aggregated exporting capacity totalling 4.5MW.

Active • 2025-26 (T-1), 2024-25 (T-1)
16.91 MW
CM14 (26 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
95.94 MW
Common Lane, Wath upon Dearne, Rotherham, South Yorkshire, S63 7DX (10 components)
• Battery energy storage unit
• New reciprocating genset in acoustic enclosure
Active • 2028-29 (T-4), 2025-26 (T-1) ...
1.37 MW
Dewi Road, Tregaron, SY25 6JP (3 components)

STOR diesel engines that will operate environmentally with mixed fuel

Active • 2025-26 (T-1)
18.54 MW
Drake Grove, Burndell Road, Yapton, Arundel, BN18 0HX (7 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2026-27 (T-4), 2025-26 (T-1) ...
47.79 MW
Ellifoot Lane, Burstwick, HU12 9EB (8 components)
• A Distribution Connected 4.5MW gas fueled generating station
• a Combined Heat and Power Plant
Active • 2028-29 (T-4), 2025-26 (T-1) ...
38.53 MW
Felindre Road, Pencoed, Brigend, CF35 5HU (1 component)

New build 40MW gas Peaker plant

Active • 2025-26 (T-1)
37.21 MW
FK1 (20 components)
• Domestic EV
• Domestic EV charge point
• Domestic EV charger
Active • 2025-26 (T-1), 2025-26 (T-4) ...
77.73 MW
Hoon Hay Manor, Marston Lane, Hatton, Derby, DE65 5EA (30 components)

Reciprocating genset

Active • 2028-29 (T-4), 2027-28 (T-4) ...
24.85 MW
18.51 MW
Kingdom Avenue, Westbury, Wiltshire, BA13 4FG (2 components)

A gas fuelled electrical power generating unit comprising multiple reciprocating engines

Active • 2025-26 (T-1)
14.21 MW
Land at Enterprise Court, Corby, NN18 8ES (107 components)

Reciprocating genset

Active • 2028-29 (T-4), 2027-28 (T-4) ...
77.38 MW
Land at Fordbridge Lane, Blackwell, DE55 5JY. (24 components)

Reciprocating genset

Active • 2027-28 (T-4), 2026-27 (T-4) ...
22.48 MW
land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL. (4 components)
• Battery Storage plant
• Gas reciprocating engines
• Thurrock Power Limited has secured a "blue chip" manufacturer as the EPC contractor to engineer, procure and construct a battery storage plant on at land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL.. Thurrock Power Limited will be constructed to be a brand new generating asset and is expected to have an equipment design life of 20 years. An experienced Operations & Maintenance contractor will be employed to ensure the plant is running effectively and efficiently to meet Capacity Market requirements. An Independent technical expert will be engaged to confirm the Plant will meet the Extended Years Criteria, Financial Commitment Milestone, and 6 monthly report for the Delivery Body as required under paragraph 8.3.6A of the Capacity Market Rules.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
286.73 MW
Land off High View Road, South Normanton, Bolsover, Derbyshire, DE55 2EY (12 components)

Reciprocating genset

Active • 2027-28 (T-4), 2026-27 (T-4) ...
11.02 MW
27.07 MW
Maybrook Road, Maybrook Business Park, Minworth, Sutton Coldfield, West Midlands, B76 1AL (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2025-26 (T-1)
11.87 MW
PE19 (92 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
214.88 MW