Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

198 unique locations (1579 components) - Page 1 of 8

Yew Tree Nursery, Guildford Road, Cranleigh, GU6 8PA (4 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2026-27 (T-4), 2025-26 (T-4) ...
5.71 MW
Woodhouse Energy Centre A. Pearson and Sons? Nursery Alderley Edge SK9 7UW (13 components)
• The CMU Component will have a connection capacity of 3.376MW. Gas-fired reciprocating engine will be the technology used.
• The CMU component is installed in the Woodhouse Energy Centre that is located at a Nursery site in Alderley Edge.
• The CMU component, CASQ17 supplies heat, CO2 and electricity to the onsite nursery and facilities.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3.08 MW
Wolverhampton Power, Northern Steel Rocks, Cross Street, Wolverhampton, WV1 2HS (16 components)
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant will be connected to the local distribution network and local gas network.
• 16 MW power plant comprising reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
14.58 MW
8.14 MW
Westwood Way, Wigan, WN3 4HH (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2025-26 (T-4)
Waun-y-Pound Industrial Estate, Ebbw Vale, Gwent, NP23 6PL (11 components)
• 16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• Peak power plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
14.58 MW
Watson Street Power Station, Burtonhead Road, St Helens, WA9 5EA (16 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
7.27 MW
Villa Nursery, Reeves Lane, Roydon, Harlow, Essex, CM19 5LE (18 components)
• A generating station consisting on multiple reciprocating engines and alternators located on a single site
• CMU consisting of multiple reciprocating engines and alternators
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2.71 MW
Units A, B, C and D, Postley Road, Kempston, Bedford, MK42 7AG (7 components)

CMU consisting of multiple reciprocating engines and alternators

Active • 2025-26 (T-4), 2023-24 (T-1) ...
11.57 MW
Units 1 To 6 Pin Green Industrial Estate Whitworth Road Stevenage, SG1 4QS (1 component)

CMU consisting of multiple reciprocating engines and alternators

Active • 2025-26 (T-4)
Unit 7, Cambridgeshire Business Park, Angel Drove, Ely CB7 4DT (5 components)

CMU consisting of multiple reciprocating engines and alternators

Active • 2027-28 (T-4), 2026-27 (T-4) ...
4.78 MW
Unit 28,29,30, Peel Mills Industrial Estate, Chamberhall Street, Bury, BL9 0LU (14 components)

16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
208.85 MW
Unit 2, 105 Abercorn Street, Paisley, PA3 4AT (14 components)
• New build gas generator
• Operational reciprocating gas engines
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3.74 MW
Tweedale Way, Oldham OL9 8EH (6 components)

CMU consisting of multiple reciprocating engines and alternators

Active • 2025-26 (T-4), 2024-25 (T-1) ...
4.34 MW
Tring Road, Tring, HP23 4RA (11 components)
• 19 x 1mw gas generator units to be installed on designated land at Tring Road - Connection offer is for 49.9mw which is split between CMUs - further detail in covering letter
• 20 x 1mw gas generator units to be installed on designated land at Tring Road - Connection offer is for 49.9mw which is split between CMUs - further detail in covering letter
• A gas fuelled generating station.
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Traston Road, Off Corporation Road, Newport , Gwent, NP19 4RQ (21 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
9.35 MW
Toray 2 Toray Textiles ImportExport Crown Farm Way Mansfield Nottingham NG19 0FN (4 components)
• Gas reciprocating engines
• Gas reciprocating engines.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
1.05 MW
Toray 1 Toray Textiles ImportExport Crown Farm Way Mansfield Nottingham NG19 0FN (7 components)
• Gas fired generating unit
• Gas generating unit(s)
• Gas reciprocating engines
Active • 2025-26 (T-4), 2024-25 (T-1) ...
Titanium Road, Cocket, Swansea, SA5 4NH (6 components)
• New build site with gas reciprocating engines to replace diesel plant
• STOR diesel engines that will operate environmentally with mixed fuel
Active • 2026-27 (T-4), 2025-26 (T-4) ...
3.62 MW
The Manorway, Stanford-leHope, SS17 9LL (5 components)
• A Battery Energy Storage System
• A gas fuelled generating station
Active • 2025-26 (T-4), 2024-25 (T-1)
The Long Barrow, Willesborough, Ashford, Kent. TN24 0GP (18 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
9.52 MW
Loading map...
Showing 25 locations