Unit 28,29,30, Peel Mills Industrial Estate, Chamberhall Street, Bury, BL9 0LU (19 components)
• 16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• EV charging at residential premises
• Generating Unit 2
Active • 2028-29 (T-4), 2027-28 (T-4) ...
52.05 MW
Sloy Power Station, Inveruglas, By Arrochar, Argyll, G83 7DP (22 components)
• Energy facility comprising of battery energy storage sets and ancillary equipment.
• Genset 3
• The CMU component comprises of three 2MW Reciprocating Gas Engines
Active • 2026-27 (T-4), 2024-25 (T-4) ...
7.09 MW
Plot 4, South Kirkby Business Park, Hemsworth, WF9 3TJ (7 components)
• A 8MW New Build gas fuelled generating station.
• Gas fired reciprocating engines.
• Generating Unit 2
Active • 2026-27 (T-4), 2023-24 (T-4) ...
20.96 MW
Pilsworth North, Moss Hall Road, Pilsworth, Bury, Lancashire, BL9 7JL (4 components)
• 1 x hydro turbine & synchronous generator
• Gas fired reciprocating engines.
• The CMU at the Pilsworth North Landfill site near Bury will be made up of four reciprocating engines generating from natural gas. In their current state, these engines have been designed to generate from Anaerobic Digestion (AD) biogas, but will be converted to natural gas and then recommissioned, ahead of the delivery year. The four components of the CMU (referenced VIR097, VIR098, VIR099 and VIR100) are MWM 2020 V12 units (VIR 097 is a MWM 2020 V16), built in 2011 and rated at 1,200kW (VIR097 is rated at 1,560kW). Each engine generates at 415V, which is then stepped up to 6.6kV for export.
Active • 2026-27 (T-4), 2023-24 (T-4) ...
17.00 MW
Peterhead Power Station, Peterhead, Aberdeenshire, AB42 3BZ (27 components)
• A gas fuelled generating station.
• Generators at hospital site
• Peterhead CCGT
Active • 2028-29 (T-4), 2027-28 (T-4) ...
6471.35 MW
Mitchell Road, Phoenix Parkway, Corby, Northamptonshire, NN17 5QT (45 components)
• The CMU is a Open Cycle Gas Turbine (OCGT)
• The CMU is a combined cycle gas turbine
• The CMU is a gas plant, capable of running in either OCGT or CCGT modes
Active • 2028-29 (T-4), 2026-27 (T-4) ...
2527.80 MW
Kirkless Landfill Site, Hemfield Close, Kirkless, Higher Ince, Wigan, WN2 2DW (5 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• Gas fired reciprocating engine(s)
• Genset 2. ROCable hydro units within the BMU are not included in the CMU.
Active • 2026-27 (T-4), 2024-25 (T-4) ...
21.04 MW
Greengate Works Power Station, Sutton Heath Road or Burtonhead Road, St Helens, WA9 5DS (23 components)
• Generating Unit 2
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
28.28 MW
Greatmoor EfW, Greatmoor Road, Woodham, Aylesbury, Buckinghamshire, HP18 0QE (16 components)
• District heating implementation with one asset 1.943MW exporting excess to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
• Genset 2.
• This CMU identifier is the replacement for BUCK01, BUCK02, FCCB01, due to the change in Connection Capacity as per rule 3.5.2 and change from "New build CMU" to "Existing CMU" status FCC Buckinghamshire Ltd. 300kT Energy from Waste Plant with c. 25MW net output. Auxiliary load is not included in the connection capacity i.e the export is net.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
94.17 MW
Foyers Power Station, Foyers, Inverness, IV2 6YB (16 components)
• Construction of a New Generating CMU comprising of gas fuelled reciprocating generation sets and gas delivery plant
• Generating Unit 1
• Generating Unit 2
Active • 2028-29 (T-4), 2027-28 (T-4) ...
603.34 MW
EDF Energy (Thermal Generation) Limited, West Burton A Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (142 components)
• Genset 2.
• West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUGT-4 = 100% (T_WBUGT-4)
• West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUPS-4 = 100% (T_WBUPS-4) + 25% (E_WBUPS-STX)
Active • 2027-28 (T-4), 2026-27 (T-4) ...
2472.54 MW
Bury St Edmunds Sugar Factory British Sugar plc Hollow Road Bury St Edmunds IP32 7BB (12 components)
• 1 x hydro turbine & synchronous generator
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• The CMU is a gas fired CCGT CHP
Active • 2028-29 (T-4), 2026-27 (T-4) ...
275.68 MW