Reciprocating engines

132 unique locations (1341 components) - Page 1 of 6

1020 Slutchers Lane, Centre Park, Warrington, WA1 1QL (9 components)
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• 16 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
14.77 MW
1A Elms Farm Industrial Estate Edison Road Bedford Bedfordshire MK41 0HU (16 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW.

Active • 2027-28 (T-4), 2026-27 (T-4) ...
4.72 MW
1 Kirkshaw Lane, Ferrybridge, Knottingley, WF11 8RD (4 components)
• AN 8MW new build gas generating station..
• CMU FES003 which is an electrical power generating unit comprised of multiple gas reciprocating engines with an aggregated exporting capacity totalling 4MW. The CMU is located at: 1 Kirkshaw Lane, Ferrybridge, Knottingley, WF11 8RD.
• CMU FES26B which is an electrical power generating unit comprised of multiple gas reciprocating engines with an aggregated exporting capacity totalling 7.5MW. The CMU is located at: 1 Kirkshaw Lane, Ferrybridge, Knottingley, WF11 8RD.
Active • 2026-27 (T-4), 2024-25 (T-4)
7.14 MW
1 Maxwell Road, Woodston Industrial Estate, Peterborough PE2 7JB (5 components)
• This CMU is 10*2MW reciprocating engines using HVO.
• This CMU is 10*2MW reciprocating engines.
• This CMU is 6*2MW reciprocating engines.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
18.70 MW
2 South Wardpark Place, Wardpark, Cumbernauld, Glasgow, North Lanarkshire, G67 3HX (33 components)
• New build gas generator
• Operational Reciprocating Engine
• Operational gas reciprocating engine.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
7.48 MW
3 Nairn Road, Deans Industrial Estate, Livingston, West Lothian, EH54 8AY (9 components)
• Newbuild gas generator
• Reciprocating engine (natural gas fuelled)
• gas generator
Active • 2026-27 (T-4), 2025-26 (T-1) ...
6.24 MW
4 Chemistry Ln, Pentre, Deeside CH5 2DA, UK (4 components)

14MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.

Active • 2027-28 (T-4), 2026-27 (T-4) ...
13.02 MW
4 Finway Road Hemel Hempstead HP2 7PT (16 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW

Active • 2027-28 (T-4), 2026-27 (T-4) ...
4.72 MW
Aberaman Industrial Estate (South Bound), Aberaman, Nr Aberdare, Rhondda Cynon Taff, CF44 6DA (19 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
9.35 MW
Adjacent to Seal Sand Bulk Storage Facility Seal Sands Stockton-on-Tees Cleveland TS2 1UB (8 components)
• Existing OCGT
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Alne Material Recovery Facility, Forest Lane, Alne, York, YO61 1TU (9 components)
• Existing Generating CMU comprising of a gas fuelled reciprocating engine and gas delivery plant.
• Generating CMU comprising of a CHP asset producing energy from waste
• New Build Generating CMU comprising of a CHP asset producing energy from waste.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
0.88 MW
APS Growers Ltd / Branfield Nursery 111 Stockbridge Road Elloughton HU15 1HW (16 components)
• One Jenbacher CHP engine with a generation capacity of 3.36 MW
• The new Energy Centre will consist of one Jenbacher CHP engine with a generation capacity of 3.36 MW and a thermal output of 3.984 MW.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3.12 MW
Arlesey Landfill Site Mill Lane Arlesey Bedfordshire SG15 6RF (15 components)
• Gas reciprocating engines
• The system comprises of two gas reciprocating engines provided an exported output of around 2MW.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
2.97 MW
Aveley Landfill Site Sandy Lane Aveley RM15 4XP (17 components)
• 4x gas reciprocating engines with a combined output of approximately 4.3MW. All associated gas delivery equipment and switchgear is included. The generating units are connected to the distribution network.
• Gas fired generating units
• Gas reciprocating engines
Active • 2027-28 (T-4), 2026-27 (T-4) ...
0.92 MW
Batleys Cash and Carry Gielgud Way Coventry CV2 2SZ (11 components)

A completed power plant, with associated civil works, switchgear and electrical connection.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.61 MW
Batleys Cash and Carry Talbot Road Fareham PO15 5RY (11 components)
• The CMU component is net of the auxiliary power required (2)
• A completed power plant, with associated civil works, switchgear and electrical connection.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
18.45 MW
7.14 MW
Bond Avenue Bletchley Milton Keynes MK1 1JJ (19 components)

The CMU component comprises of three 2MW Reciprocating Gas Engines

Active • 2028-29 (T-4), 2027-28 (T-4) ...
11.83 MW
Booker Cash and Carry Didcot OX11 7HJ (7 components)

A completed power plant, with associated civil works, switchgear and electrical connection.

Active • 2026-27 (T-4), 2025-26 (T-4) ...
3.14 MW
Booker Cash and Carry Frobisher Way Hatfield Hertfordshire AL10 9TR (12 components)

A completed power plant, with associated civil works, switchgear and electrical connection. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.31 MW
Booth Lane Sandbach Cheshire CW11 3PY (1 component)

A new build gas fuelled generating station.

Active • 2026-27 (T-4)
42.83 MW
Briar Chemicals, Sweet Briar Road, Norwich, NR6 5AP (5 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2027-28 (T-4), 2026-27 (T-4) ...
7.55 MW
Bridge Street, Stalybridge, SK15 1PH (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2026-27 (T-4)
1.43 MW
Bristol Royal Infirmary, Marlborough Hill, Bristol, BS2 8HW (10 components)
• 1 * 1.7MW diesel reciporcating engine
• 1 * 1.7MW diesel reciprocating engine
Active • 2026-27 (T-4), 2025-26 (T-4) ...
1.45 MW
Bristol Royal Infirmary, Marlborough Hill, Bristol, BS2 8HW (8 components)
• 1 * 1.7MW diesel reciporcating engine
• 1 * 1.7MW diesel reciprocating engine
Active • 2026-27 (T-4), 2025-26 (T-4) ...
1.46 MW