Reciprocating engines

59 unique locations (933 components) - Page 1 of 3

132 Manchester Road, Carrington, Manchester, M31 4AY (12 components)
• 5 x 9.98MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
• New combined cycle gas turbine unit comprising the latest technology gas turbines, heat recovery steam generators, steam turbines and associated balance of plant. This will be constructed on Carrington Manchester
• One 4.5MW Gas Reciprocating engine with all ancillary equipment to be installed on the Trafford Power Site
Active • 2021-22 (T-4), 2022-23 (T-4) ...
1761.93 MW
1A Elms Farm Industrial Estate Edison Road Bedford Bedfordshire MK41 0HU (26 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW.

Active • 2023-24 (T-4), 2024-25 (T-4) ...
14.23 MW
1 Maxwell Road, Woodston Industrial Estate, Peterborough PE2 7JB (7 components)
• This CMU is 10*2MW reciprocating engines using HVO.
• This CMU is 10*2MW reciprocating engines.
• This CMU is 6*2MW reciprocating engines.
Active • 2023-24 (T-1), 2025-26 (T-1) ...
37.40 MW
46 Station Road Stokesley Middlesbrough TS9 7AA (16 components)
• 2 x 2.25 Gas reciprocating engines to be installed at Cleveland Nurseries (replacing existing CHP)
• Gas CHP engines in commercial horticultural usage with no auxilliary load
Active • 2023-24 (T-1), 2023-24 (T-4) ...
20.43 MW
4 Finway Road Hemel Hempstead HP2 7PT (25 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW

Active • 2023-24 (T-4), 2024-25 (T-4) ...
14.23 MW
APS Growers Ltd / Branfield Nursery 111 Stockbridge Road Elloughton HU15 1HW (27 components)
• One Jenbacher CHP engine with a generation capacity of 3.36 MW
• The new Energy Centre will consist of one Jenbacher CHP engine with a generation capacity of 3.36 MW and a thermal output of 3.984 MW.
Active • 2024-25 (T-4), 2025-26 (T-4) ...
18.47 MW
Arlesey Landfill Site Mill Lane Arlesey Bedfordshire SG15 6RF (17 components)
• Gas reciprocating engines
• The system comprises of two gas reciprocating engines provided an exported output of around 2MW.
Active • 2023-24 (T-1), 2024-25 (T-1) ...
9.84 MW
Aveley Landfill Site Sandy Lane Aveley RM15 4XP (28 components)
• 4x gas reciprocating engines with a combined output of approximately 4.3MW. All associated gas delivery equipment and switchgear is included. The generating units are connected to the distribution network.
• Gas fired generating units
• Gas reciprocating engines
Active • 2022-23 (T-1), 2023-24 (T-1) ...
7.71 MW
Aveley Landfill Site, Sandy Lane, Aveley, RM15 4XP (3 components)

Gas reciprocating engines

Active • 2024-25 (T-1), 2025-26 (T-1) ...
2.78 MW
Batleys Cash and Carry Talbot Road Fareham PO15 5RY (16 components)
• A completed power plant, with associated civil works, switchgear and electrical connection.
• The CMU component is net of the auxiliary power required
Active • 2024-25 (T-4), 2025-26 (T-4) ...
131.72 MW
Bond Avenue Bletchley Milton Keynes MK1 1JJ (27 components)

The CMU component comprises of three 2MW Reciprocating Gas Engines

Active • 2024-25 (T-4), 2025-26 (T-4) ...
28.70 MW
Cantelo Reception, UK Power Reserve Ltd, Bradon Farm, Isle Abbots, Taunton, Somerset. TA3 6RX (10 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2020-21 (T-4), 2021-22 (T-4) ...
9.15 MW
Carrington Power Station 132 Manchester Road Carrington Manchester M31 4AY United Kingdom (48 components)
• The CMU component is a combined cycle gas turbine
• This CMU (CARRI3) will be formed of multiple gas reciprocating units controlled centrally & exporting to the Distribution system.
• This CMU (CGTN_3) will be formed of multiple gas reciprocating units controlled centrally & exporting to the Distribution system.
Active • 2024-25 (T-4), 2025-26 (T-4) ...
3471.17 MW
Cavendish Rd Stevenage SG1 2ET UK (27 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 8MW.

Active • 2024-25 (T-4), 2025-26 (T-4) ...
22.64 MW
Cavendish Road 33kV Generation, Land Behind Caswell House, Cavendish Road, Stevenage, SG1 2ET (22 components)
• Containerised high speed gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 9MW.
• Containerised high speed gas-fired reciprocating engines with transformers, switchgear and associated control gear.
Active • 2024-25 (T-4), 2025-26 (T-4) ...
51.60 MW
Dig Gate Lane, Rochdale, OL16 4NR (3 components)

4.4MW gas fired peaking power plant

Active • 2026-27 (T-4), 2027-28 (T-4) ...
12.45 MW
Dogsthorpe Landfill Site Welland Road Peterborough Cambridgeshire PE1 3TD (7 components)
• 2 gas reciprocating engines with a combined export output of approximately 2MW. The generating equipment is connected to the distribution network via an import/export meter.
• Gas reciprocating engines
Active • 2018-19 (T-1), 2021-22 (T-4) ...
7.64 MW
Europa Energy Centre, Hills Court Road, Ash, Kent, CT3 2AP (32 components)
• The CMU BREH14 consists of two CHP components supplying heat, CO2 and power to the on-site Nursery.
• The CMU Component will have a connection capacity of 15MW. Gas-fired reciprocating engine will be the technology used.
• The CMU component BREH02 consists of one CHP engine supplying heat, CO2 and power to the on-site Nursery.
Active • 2023-24 (T-4), 2024-25 (T-4) ...
95.49 MW
Five Mile Drive, Upton Wold, Moreton-In-Marsh, WR12 7LD (8 components)
• New build site with gas reciprocating engines to replace diesel plant
• New state-of-the-art green bio-fuel reciprocating engines replacing existing diesel reciprocating engines.
• STOR diesel engines that will operate environmentally with mixed fuel
Active • 2023-24 (T-1), 2025-26 (T-4) ...
99.17 MW
Gate Lodge, Boundary Farm, Styal Road, Wythenshawe, Manchester, M22 5YA (21 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual gas units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2022-23 (T-3), 2022-23 (T-4) ...
37.75 MW
Grimethorpe CMM Generation Plant, Springvale Road, Grimethorpe, S72 7BF (1 component)

Gas reciprocating engines as the generating unit.

Active • 2027-28 (T-4)
Guernsey Road, Bletchley, Milton Keynes, Buckinghamshire, MK3 5FR (17 components)

Gas reciprocating engines

Active • 2022-23 (T-1), 2023-24 (T-1) ...
24.80 MW
Hoon Hay Manor, Marston Lane, Hatton, Derby, DE65 5EA (30 components)

Reciprocating genset

Active • 2025-26 (T-1), 2027-28 (T-4) ...
17.49 MW
Jack Martin Way, Fintry, Dundee, DD4 9FF (2 components)

A new build, gas fuelled generation station.

Active • 2027-28 (T-4), 2028-29 (T-4)
37.38 MW