Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

73 unique locations (909 components) - Page 1 of 3

Active MW: 45623.98 MW
Inactive MW: 10846.14 MW
1A Elms Farm Industrial Estate, Edison Road, Bedford, Bedfordshire, MK41 0HU (14 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW.

Active • 2029-30 (T-4), 2027-28 (T-4) ...
14.13 MW
2 South Wardpark Place, Wardpark, Cumbernauld, Glasgow, North Lanarkshire, G67 3HX (28 components)
• New build gas generator
• Operational Reciprocating Engine
• Operational gas reciprocating engine.
Reciprocating engines OCGT and Reciprocating Engines GREENSPAN NIFTY FIFTY LIMITED Existing Generating CMU Wardpark Alpha Wardpark Alpha +14 more G67
Active • 2029-30 (T-4), 2028-29 (T-4) ...
30.08 MW
4 Chemistry Lane, Pentre, Deeside CH5 2DA, UK (2 components)

14MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.

Reciprocating engines CULVERY POWER LIMITED Existing Generating CMU Culvery Power Limited CH5
Active • 2029-30 (T-4), 2028-29 (T-4)
25.64 MW
ABBOTSHAUGH RESERVE POWER FACILITY, ABBOTTS ROAD, FALKIRK, FK2 7XU (2 components)

Front of the meter 10 x 2MW Gas Reciprocating Engines installed to generate power and export to the local Distribution Network.

Reciprocating engines FLEXITRICITY LIMITED Existing Generating CMU FLEX163 FK2
Active • 2029-30 (T-4), 2025-26 (T-4)
17.01 MW
Aberaman Industrial Estate (South Bound), Aberaman, Nr Aberdare, Rhondda Cynon Taff, CF44 6DA (17 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas) UK POWER RESERVE LIMITED Existing Generating CMU Aberdare Power Station Aberdare Power Station +9 more CF44
Active • 2029-30 (T-4), 2028-29 (T-4) ...
37.60 MW
Adjacent to Seal Sand Bulk Storage Facility, Seal Sands, Stockton-on-Tees, Cleveland, TS2 1UB (12 components)
• Existing OCGT
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output.
Active • 2029-30 (T-4), 2028-29 (T-4) ...
173.55 MW
APS Growers Ltd / Branfield Nursery, 111 Stockbridge Road, Elloughton, HU15 1HW (14 components)
• One Jenbacher CHP engine with a generation capacity of 3.36 MW
• The new Energy Centre will consist of one Jenbacher CHP engine with a generation capacity of 3.36 MW and a thermal output of 3.984 MW.
Reciprocating engines Combined Heat and Power (CHP) GLASS LEAF POWER LIMITED Branfield Energy Centre Glassleaf Power +2 more HU15
Active • 2029-30 (T-4), 2028-29 (T-4) ...
12.40 MW
Arlesey Landfill Site, Mill Lane, Arlesey, Bedfordshire, SG15 6RF (16 components)
• Gas reciprocating engines
• The system comprises of two gas reciprocating engines provided an exported output of around 2MW.
Active • 2029-30 (T-4), 2028-29 (T-4) ...
14.23 MW
Ash Road, Elton, Chester, CH2 4RX (6 components)

A new build, gas fuelled generation station.

Reciprocating engines MERSEY GENERATION LIMITED New Build Generating CMU Protos Generation - 1 Protos Generation - 2 +1 more CH2
Active • 2029-30 (T-4), 2028-29 (T-4)
92.29 MW
Aveley Landfill Site, Sandy Lane, Aveley, RM15 4XP (19 components)
• 4x gas reciprocating engines with a combined output of approximately 4.3MW. All associated gas delivery equipment and switchgear is included. The generating units are connected to the distribution network.
• Gas fired generating units
• Gas reciprocating engines
Active • 2029-30 (T-4), 2028-29 (T-4) ...
10.16 MW
Batleys Cash and Carry, Gielgud Way, Coventry, CV2 2SZ (10 components)

A completed power plant, with associated civil works, switchgear and electrical connection.

Reciprocating engines PEAK GEN POWER LIMITED Peak Gen Power Coventry Peak Gen Power Coventry +2 more CV2
Active • 2029-30 (T-4), 2028-29 (T-4) ...
33.82 MW
Batleys Cash and Carry, Talbot Road, Fareham, PO15 5RY (10 components)
• A completed power plant, with associated civil works, switchgear and electrical connection.
• The CMU component is net of the auxiliary power required
Active • 2029-30 (T-4), 2028-29 (T-4) ...
104.59 MW
Bond Avenue, Bletchley, Milton Keynes, MK1 1JJ (15 components)

The CMU component comprises of three 2MW Reciprocating Gas Engines

Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas) CONRAD (BLETCHLEY) LIMITED Bond Estates Milton Keynes Bond Estates Milton Keynes +1 more MK1
Active • 2029-30 (T-4), 2028-29 (T-4) ...
22.76 MW
Booker Cash and Carry, Didcot, OX11 7HJ (10 components)

A completed power plant, with associated civil works, switchgear and electrical connection.

Reciprocating engines PEAK GEN POWER LIMITED Peak Gen Power Didcot Peak Gen Power Didcot +1 more OX11
Active • 2029-30 (T-4), 2028-29 (T-4) ...
18.66 MW
Booker Cash and Carry, Frobisher Way, Hatfield, Hertfordshire, AL10 9TR (10 components)

A completed power plant, with associated civil works, switchgear and electrical connection.

Reciprocating engines PEAK GEN POWER LIMITED PEAK GEN TOP CO LIMITED Peak Gen Power Hatfield Peak Gen Power Hatfield +2 more AL10
Active • 2029-30 (T-4), 2028-29 (T-4) ...
28.97 MW
Cantelo Reception, UK Power Reserve Ltd, Bradon Farm, Isle Abbots, Taunton, Somerset. TA3 6RX (15 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas) UK POWER RESERVE LIMITED Existing Generating CMU Cantelo Power Station Cantelo Power Station +2 more TA3
Active • 2029-30 (T-4), 2027-28 (T-4) ...
25.58 MW
Carrington Power Station, 132 Manchester Road, Carrington, Manchester, M31 4AY, United Kingdom (30 components)
• The CMU component is a combined cycle gas turbine
• This CMU (CARRI3) will be formed of multiple gas reciprocating units controlled centrally & exporting to the Distribution system.
• This CMU (CGTN_3) will be formed of multiple gas reciprocating units controlled centrally & exporting to the Distribution system.
Active • 2029-30 (T-4), 2028-29 (T-4) ...
3318.50 MW
Cavendish Rd, Stevenage, SG1 2ET, UK (15 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 8MW.

Active • 2029-30 (T-4), 2028-29 (T-4) ...
30.08 MW
Cavendish Road 33kV Generation, Land Behind Caswell House, Cavendish Road, Stevenage, SG1 2ET (12 components)
• Containerised high speed gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 9MW.
• Containerised high speed gas-fired reciprocating engines with transformers, switchgear and associated control gear.
Reciprocating engines CONRAD (STEVENAGE A) LIMITED Existing Generating CMU Caswell Caswell +1 more SG1
Active • 2029-30 (T-4), 2028-29 (T-4) ...
33.89 MW
Chamberhall Street, Bury, Lancashire, BL9 0LU (8 components)
• 20 MW power plant comprising 10 x 2MW gas reciprocating engines. Power plant will be connected to the local distribution network and local gas network.
• 20MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
Reciprocating engines BURY POWER LIMITED Existing Generating CMU Bury Power Bury Power Limited +3 more BL9
Active • 2029-30 (T-4), 2028-29 (T-4) ...
73.32 MW
Cheshire Power Station, North Road, Ellesmere Port, South Wirral, CH65 1AF (13 components)
• Modular reciprocating engines
• One (1) Open Cycle Gas Turbine
• One (1) Open Cycle Gas Turbine MSID: 7382
Active • 2029-30 (T-4), 2028-29 (T-4) ...
287.68 MW
Cowley Hill Works Boilerhouse, Albert Street, St Helens, WA10 2RZ (16 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas) UK POWER RESERVE LIMITED Existing Generating CMU Cowley Hill Power Station Cowley Hill Power Station +8 more WA10
Active • 2029-30 (T-4), 2028-29 (T-4) ...
35.82 MW
Dafen Power, Llethri Road, Dafen Park Industrial Estate, Llanelli, SA14 8QG (6 components)

10 MW power plant comprising of 5x2MW gas fired reciprocating engines. The power plant is connected to the local distribution network and local gas network.

Reciprocating engines DAFEN RESERVE POWER LIMITED Existing Generating CMU Dafen Power Limited Dafen Reserve Power Limited +3 more SA14
Active • 2029-30 (T-4), 2028-29 (T-4) ...
36.85 MW
Dogsthorpe Landfill Site, Welland Road, Peterborough, Cambridgeshire, PE1 3TD (8 components)
• 2 gas reciprocating engines with a combined export output of approximately 2MW. The generating equipment is connected to the distribution network via an import/export meter.
• Gas reciprocating engines
Active • 2029-30 (T-4), 2028-29 (T-4) ...
15.23 MW
Loading map...
Showing 25 locations