Reciprocating engines

19 unique locations (265 components)

1 Maxwell Road, Woodston Industrial Estate, Peterborough PE2 7JB (2 components)
• This CMU is 10*2MW reciprocating engines.
• This CMU is 6*2MW reciprocating engines.
Active • 2025-26 (T-1), 2023-24 (T-1)
18.70 MW
1 Maxwell Road, Woodston Industrial Estate, Peterborough PE2 7JB (5 components)
• This CMU is 10*2MW reciprocating engines using HVO.
• This CMU is 10*2MW reciprocating engines.
• This CMU is 6*2MW reciprocating engines.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
18.70 MW
AL1 (123 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
174.09 MW
Batleys Cash and Carry Gielgud Way Coventry CV2 2SZ (4 components)

A completed power plant, with associated civil works, switchgear and electrical connection.

Active • 2028-29 (T-4), 2023-24 (T-1) ...
11.32 MW
Batleys Cash and Carry Gielgud Way Coventry CV2 2SZ (11 components)

A completed power plant, with associated civil works, switchgear and electrical connection.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
22.63 MW
Batleys Cash and Carry Talbot Road Fareham PO15 5RY (4 components)
• A completed power plant, with associated civil works, switchgear and electrical connection.
• The CMU component is net of the auxiliary power required
Active • 2028-29 (T-4), 2023-24 (T-1) ...
33.68 MW
Batleys Cash and Carry Talbot Road Fareham PO15 5RY (11 components)
• A completed power plant, with associated civil works, switchgear and electrical connection.
• The CMU component is net of the auxiliary power required
Active • 2028-29 (T-4), 2027-28 (T-4) ...
52.31 MW
Booker Cash and Carry Didcot OX11 7HJ (3 components)

A completed power plant, with associated civil works, switchgear and electrical connection.

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
3.14 MW
Booker Cash and Carry Didcot OX11 7HJ (7 components)

A completed power plant, with associated civil works, switchgear and electrical connection.

Active • 2026-27 (T-4), 2025-26 (T-4) ...
3.14 MW
Booker Cash and Carry Frobisher Way Hatfield Hertfordshire AL10 9TR (4 components)

A completed power plant, with associated civil works, switchgear and electrical connection.

Active • 2028-29 (T-4), 2023-24 (T-1) ...
9.48 MW
Booker Cash and Carry Frobisher Way Hatfield Hertfordshire AL10 9TR (12 components)

A completed power plant, with associated civil works, switchgear and electrical connection.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
18.67 MW
Carrington Power Station 132 Manchester Road Carrington Manchester M31 4AY United Kingdom (40 components)
• The CMU component is a combined cycle gas turbine
• This CMU (CARRI3) will be formed of multiple gas reciprocating units controlled centrally & exporting to the Distribution system.
• This CMU (CGTN_3) will be formed of multiple gas reciprocating units controlled centrally & exporting to the Distribution system.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
637.73 MW
LAND LYING TO THE SOUTH OF WEST QUAY ROAD WINWICK WA2 8TL (5 components)

CMU consisting of multiple reciprocating engines and alternators

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Land on west side of Droppingwell Road, Sheffield, S61 2DW (4 components)

3 x 2MW gas generator units to be installed on a compound adjacent to Droppingwell Road

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Millfield Lane Haydock Industrial Estate Haydock St Helens WA11 9UT (5 components)

A completed power plant, with associated civil works, switchgear and electrical connection.

Active • 2028-29 (T-4), 2026-27 (T-4) ...
15.55 MW
Millfield Lane Haydock Industrial Estate Haydock St Helens WA11 9UT (13 components)

A completed power plant, with associated civil works, switchgear and electrical connection.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
25.80 MW
No.1 Maxwell Road Woodston Industrial Estate Peterborough PE2 7JB (2 components)

A recently completed power plant, with associated civil works, switchgear and electrical connection.

Inactive • 2023-24 (T-1), 2017-18 (T-1)
No.1 Maxwell Road Woodston Industrial Estate Peterborough PE2 7JB (8 components)
• A power plant, with associated civil works, switchgear and electrical connection.
• A recently completed power plant, with associated civil works, switchgear and electrical connection.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
Recycling Centre Meek Street Rochdale OL2 6HL (2 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2022-23 (T-4)
Loading map...
Showing 19 locations