Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

12 unique locations (39 components)

Chicks Lane, Chewton Mendip, BA3 4BY (1 component)

A gas fuelled electrical power generating unit comprising multiple reciprocating engines

Active • 2024-25 (T-4)
Church Field Road, Sudbury, CO10 2YA (3 components)

A gas fuelled electrical power generating unit comprising multiple reciprocating engines

Active • 2025-26 (T-4), 2024-25 (T-4)
Kingdom Avenue, Westbury, Wiltshire, BA13 4FG (3 components)

A gas fuelled electrical power generating unit comprising multiple reciprocating engines

Active • 2026-27 (T-4), 2025-26 (T-1)
20.78 MW
Land at Philips Lane Works, Philips Lane, Colne, Lancashire, BB8 9PQ (1 component)

Total installed capacity is 6.9MW gas reciprocating engines to be installed on designated land within a compound.

Active • 2026-27 (T-4)
6.57 MW
Land East of B1256, Dunmow CM6 1EW (1 component)

Total installed capacity is 6.9MW gas reciprocating engines to be installed on designated land within a compound.

Active • 2025-26 (T-4)
Llay Grid Capacity Site Llay Hall Farm Llay Wrexham LL12 0TH (4 components)
• 3.4MW of installed capacity of gas fuelled reciprocating engines to be installed on designated land.
• 3MW of installed capacity of gas fuelled reciprocating engines to be installed on designated land.
Active • 2025-26 (T-4), 2024-25 (T-1) ...
Marshall Road, Plympton, Plymouth, PL7 4NW (2 components)

A gas fuelled electrical power generating unit comprising multiple reciprocating engines

Active • 2024-25 (T-4)
Prowse's Lane, Axbridge, BS26 2HP. (4 components)

Total installed capacity is 6.9MW gas reciprocating engines to be installed on designated land within a compound.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
6.57 MW
Sutton Manor Grid Capacity Site, Union Bank Farm, Warrington Road, Bold Bridge, St Helens, WA8 5UT (3 components)

3.000MW of installed capacity of gas fuelled reciprocating engines to be installed on designated land within a manufacturing compound.

Active • 2028-29 (T-4), 2022-23 (T-1)
5.61 MW
Sutton Manor Grid Capacity Site, Union Bank Farm, Warrington Road, Bold Bridge, St Helens, WA8 5UT (8 components)

3.000MW of installed capacity of gas fuelled reciprocating engines to be installed on designated land within a manufacturing compound.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.64 MW
The Manorway, Stanford-leHope, SS17 9LL (5 components)
• A Battery Energy Storage System
• A gas fuelled generating station
Active • 2025-26 (T-4), 2024-25 (T-1)
Wallingford Road, Goring, Reading, RG8 0HS (4 components)

A 6.9MW gas fuelled generating station.

Active • 2026-27 (T-4), 2025-26 (T-1) ...
19.47 MW
Loading map...
Showing 12 locations