Reciprocating engines

6 unique locations (13 components)

Active MW: 14652.51 MW
Inactive MW: 930.44 MW
Chicks Lane, Chewton Mendip, BA3 4BY (1 component)

A gas fuelled electrical power generating unit comprising multiple reciprocating engines

Reciprocating engines BIOGAS TECHNOLOGY LIMITED New Build Generating CMU Chewton Not Prequalified BA3
Active • 2024-25 (T-4)
Church Field Road, Sudbury, CO10 2YA (3 components)

A gas fuelled electrical power generating unit comprising multiple reciprocating engines (2)

Reciprocating engines BIOGAS TECHNOLOGY LIMITED GREAT DUNMOW POWER LIMITED New Build Generating CMU Sudbury Sudbury A +1 more Not Prequalified CO10
Active • 2025-26 (T-4), 2024-25 (T-4)
Land East of B1256, Dunmow CM6 1EW (1 component)

Total installed capacity is 6.9MW gas reciprocating engines to be installed on designated land within a compound.

Reciprocating engines BIOGAS TECHNOLOGY LIMITED New Build Generating CMU Great Dunmow Not Prequalified CM6
Active • 2025-26 (T-4)
Llay Grid Capacity Site Llay Hall Farm Llay Wrexham LL12 0TH (3 components)
• 3MW of installed capacity of gas fuelled reciprocating engines to be installed on designated land. (2)
• 3.4MW of installed capacity of gas fuelled reciprocating engines to be installed on designated land.
Reciprocating engines LLAY POWER LIMITED New Build Generating CMU Llay Llay LL12
Active • 2025-26 (T-4), 2023-24 (T-4) ...
Marshall Road, Plympton, Plymouth, PL7 4NW (2 components)

A gas fuelled electrical power generating unit comprising multiple reciprocating engines

Reciprocating engines BIOGAS TECHNOLOGY LIMITED New Build Generating CMU Linketty Lane Linketty Lane Not Prequalified PL7
Active • 2024-25 (T-4)
Prowse's Lane, Axbridge, BS26 2HP. (3 components)

Total installed capacity is 6.9MW gas reciprocating engines to be installed on designated land within a compound. (3)

Reciprocating engines BIOGAS TECHNOLOGY LIMITED New Build Generating CMU Axbridge Axbridge +1 more BS26
Active • 2025-26 (T-4), 2024-25 (T-1) ...
13.08 MW