Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

2 unique locations (4 components)

Active MW: 14652.51 MW
Inactive MW: 930.44 MW
M1, Luton, LU5 6HR, UK (1 component)

The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.

Reciprocating engines CSE21 Limited New Build Generating CMU Sundon Conditional LU5
Inactive • 2022-23 (T-4)
M1, Luton, LU5 6HR (3 components)

The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology. (3)

Reciprocating engines CSE21 Limited New Build Generating CMU Sundon Sundon20 Not Prequalified LU5
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Loading map...
Showing 2 locations