Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

8 unique locations (312 components)

West Burton B Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (30 components)
β€’ West Burton B Power Station CMU 1 WB1-24= 100% T_WBURB-1
β€’ West Burton B Power Station CMU 2 WB2-24= 100% T_WBURB-2
β€’ West Burton B Power Station CMU 3 WB3-24= 100% T_WBURB-3
Active β€’ 2028-29 (T-4), 2026-27 (T-4) ...
2330.50 MW
Plot 6 Barrow Man Road, Birchington CT7 0AX (19 components)
β€’ CHP engine in a horticultural environment, natural gas, no aux load
β€’ New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
β€’ The CMU component at the Feeder Road Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each.
Active β€’ 2028-29 (T-4), 2024-25 (T-4) ...
14.72 MW
MytheΒ Road. Tewkesbury. Gloucester. GL20 6AA (18 components)
β€’ Load reduction on site supported by non-exporting standby generation.
β€’ The CMU component at Catsbrain Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 MW.
β€’ West Burton A Power Station Combined CMU WAC-21 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUPS-3 = 100% (T_WBUPS-3) + 25% (E_WBUPS-STX)
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
7.15 MW
Europa Energy Centre, Hills Court Road, Ash, Kent, CT3 2AP (30 components)
β€’ The CMU Component will have a connection capacity of 15MW. Gas-fired reciprocating engine will be the technology used.
β€’ The CMU component BREH01 consists of one CHP engine supplying heat, CO2 and power to the on site Nursery.
β€’ The CMU component BREH02 consists of one CHP engine supplying heat, CO2 and power to the on-site Nursery.
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
95.49 MW
EDF Energy (Thermal Generation) Limited, West Burton B Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (19 components)
β€’ The CMU is a Open Cycle Gas Turbine (OCGT)
β€’ The CMU will be formed of multiple individual diesel reciprocating generating units controlled centrally and exporting to the distribution system.
β€’ West Burton B Power Station CMU 2 WB2-20= 100% T_WBURB-2
Active β€’ 2024-25 (T-4), 2023-24 (T-4) ...
1246.05 MW
EDF Energy (Thermal Generation) Limited, West Burton A Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (142 components)
β€’ Genset 2.
β€’ West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUGT-4 = 100% (T_WBUGT-4)
β€’ West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUPS-4 = 100% (T_WBUPS-4) + 25% (E_WBUPS-STX)
Active β€’ 2027-28 (T-4), 2026-27 (T-4) ...
2472.54 MW
EDF Energy (Thermal Generation) Limited, Cottam Power Station, Outgang Lane, Cottam, Retford, DN22 0NP (46 components)
β€’ 2MW - 2.3MWh Battery Energy Storage System
β€’ CMU INO200 represents demand assets on the Inovyn ChlorVinyls Ltd site in Runcorn, Cheshire. The asset uses electricity for Chemical manufacture. Site load can easily be altered to suit demand or reduction.
β€’ Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. Placeholder component for empty Unproven DSR CMU - Load Reduction upon instruction
Active β€’ 2027-28 (T-4), 2025-26 (T-4) ...
1528.52 MW
Asda Leek, Meerbrook, Leek, Staffordshire, ST13 8SN (8 components)
β€’ 99.000MW Battery Energy Storage site
β€’ Load reduction on site supported by non-exporting standby generation.
β€’ West Burton A Power Station Combined CMU WAC-21 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUPS-4 = 100% (T_WBUPS-4) + 25% (E_WBUPS-STX)
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
29.75 MW
Loading map...
Showing 8 locations