Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

12 unique locations (240 components)

Windsor Battery East, Millstream East, Maidenhead Road, Windsor, Berkshire, SL4 5GD. (10 components)
• Battery Storage
• Gas reciprocating engines
• Glenlee hydro power station - Unit 1, part of the Galloway hydroelectric scheme. The registered capacity of the Glenlee hydro power station is 30MVA or 24MW at 0.8PF and each of the 2 identical generating unit components at the station is 12MW.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
0.09 MW
Union Street, rotherham, S61 1AB *Post code and grid reference may not match because site address is not yet registered with post office. We have used nearest available post code. (2 components)
• Kendoon hydro power station - Unit 2, part of the Galloway hydroelectric scheme The registered capacity of the Kendoon Power Station is 26.25MVA or 24MW at 0.915PF. Each of the 2 generating unit components are identical i.e. 12MW for each of unit 1 and unit 2
• New reciprocating genset in acoustic enclosure
Active • 2024-25 (T-4), 2022-23 (T-4)
St Johns Town of Dalry, Castle Douglas, Kirkcudbrightshire, DG7 3UB, Scotland (37 components)
• Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 8MW.
• Kendoon hydro power station - Unit 1, part of the Galloway hydroelectric scheme
• Kendoon hydro power station - Unit 2, part of the Galloway hydroelectric scheme
Active • 2028-29 (T-4), 2026-27 (T-4) ...
80.18 MW
Power Station Road Isle of Grain Rochester ME3 0AR (69 components)
• Grain B CCGT Unit 6 Grain B power station provides heat to the Grain LNG regasification facility.
• OCGT from Grain U1. Fuel is Diesel as specified in BS EN590
• OCGT from Grain U4. Fuel is Diesel as specified in BS EN590
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2886.91 MW
No.1 Maxwell Road Woodston Industrial Estate Peterborough PE2 7JB (8 components)
• A power plant, with associated civil works, switchgear and electrical connection.
• A recently completed power plant, with associated civil works, switchgear and electrical connection.
• The CMU will consist of 2 MW's of containerised battery storage.
Active • 2027-28 (T-4), 2023-24 (T-1) ...
New Galloway, Castle Douglas, Kirkcudbrightshire, DG7 3SF, Scotland (43 components)
• Glenlee hydro power station - Unit 1, part of the Galloway hydroelectric scheme. The registered capacity of the Glenlee hydro power station is 30MVA or 24MW at 0.8PF and each of the 2 identical generating unit components at the station is 12MW.
• Glenlee hydro power station - Unit 1, part of the Galloway hydroelectric scheme. The registered capacity of the Glenlee hydro power station is 30MVA or 24MW at 0.8PF and each of the 2 identical generating unit components at the station is 12MW.
• Glenlee hydro power station - Unit 2, part of the Galloway hydroelectric scheme The registered capacity of the Glenlee hydro power station is 30MVA or 24MW at 0.8PF and each of the 2 identical generating unit components at the station is 12MW.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
78.70 MW
Leek STW, Off Cheddleton Rd, Leekbrook, Leek, ST13 7AU (18 components)
• Kendoon hydro power station - Unit 2, part of the Galloway hydroelectric scheme
• Load reduction on site supported by non-exporting standby generation.
• One 2MW gas CHP engine in a horticultural environment
Active • 2028-29 (T-4), 2027-28 (T-4) ...
23.75 MW
Knapton Generating Station, East Knapton, Malton, YO17 8JF (2 components)
• 12-turbine wind farm located in Scotland with the installed capacity of 43.200MW
• Natural gas fired reciprocating engines installed upon designated land within the existing Knapton Generating Station facility. The CMU output will have a combined total output of 40.9 MWe.
Active • 2027-28 (T-4), 2024-25 (T-4)
41.95 MW
Imerys Aluminates Dolphin Way, Purfleet RM19 1NZ, United Kingdom (37 components)
• Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• To be confirmed once CMU components are known
Active • 2028-29 (T-4), 2026-27 (T-4) ...
24.79 MW
Castle Hill Road, Bransholme, Sutton, Kingston Upon Hull, HU7 4TX (1 component)

A new build, gas fuelled generation station.

Active • 2024-25 (T-4)
Carsphairn, St Johns Town of Dalry, Castle Douglas, Dumfries and Galloway, DG7 3TJ (4 components)
• Drumjohn hydro power station - Unit 1, part of the Galloway hydroelectric scheme
• Total installed capacity is 6.9MW gas reciprocating engines to be installed on designated land within a compound.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
10.91 MW
BATH ROAD, Castle Gresley, SWADLINCOTE, DERBYSHIRE, DE11 (9 components)
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
• EV charging on residential premises
Active • 2026-27 (T-4), 2025-26 (T-4) ...
6.86 MW
Loading map...
Showing 12 locations