Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

2 unique locations (41 components)

Kirklees Energy from Waste Plant Vine Street Huddersfield, Yorkshire HD1 6NT (28 components)
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
• Existing Energy from Waste Plant
• The CMU component at Whitehouse Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 MW.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
56.00 MW
Land at Strasbourg St, Westwood Industrial Estate, Margate, Kent, CT9 4JF (13 components)
• 20.7MW power plant comprising reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• 20MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.
• This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-12G under the BSC.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Loading map...
Showing 2 locations