31 unique locations (424 components) - Page 1 of 2

Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (66 components)
• A gas engine CHP site providing electricity & heat to the associated development
• A gas engine CHP site providing hot water to a local district heating network, as well as a solar PV installation on site but is metered seperately to the CHP
• Load reduction on site supported by non-exporting standby generation.
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Willows, Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (7 components)
• 1000kW/1200kWh Lithium Ion Battery
• 1MW Lithium Ion Battery Storage unit
• Gas fired reciprocating engines
Inactive • 2022-23 (T-3), 2020-21 (T-4) ...
Water Tower, Knight Street, Pinchbeck, Spalding, PE11 3XD (3 components)
• 2.6MW of demand reduction
• CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
• Containerised High Speed Gas-fired reciprocating engines together with transformers, switchgear and associated control gear
Active • 2024-25 (T-1), 2023-24 (T-4)
0.09 MW
Toray 1 Toray Textiles ImportExport Crown Farm Way Mansfield Nottingham NG19 0FN (6 components)
• 3.6MW of demand reduction
• Gas generating unit(s)
• NEW BUILD GAS GENERATION STATION
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Thatcham Grid Substation, Piper's Lane, Off Station Road, Thatcham, RG19 4NA (15 components)
• 6 x reciprocating engines
• Auxiliary supply is subtracted prior to Bespoke Metering point MSID - NIA M1 ? 18042602
• Distribution Centre with behind the meter back-up generation.
Active • 2025-26 (T-4), 2023-24 (T-4) ...
Shawhouse farm, Clitheroe Road, Clitheroe, Lancashire, BB7 9AD (4 components)
• 2 X 2MW gas fuelled engines installed on a compound at Shawhouse farm.
• 4 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
PROJECT SCENE ENERGY CENTRE, TRENT BASIN, TRENT LANE, SNEINTON, NOTTINGHAM, NOTTINGHAMSHIRE, NG2 4DS (7 components)
• 0.5MW of demand reduction
• A generating station consisting on multiple reciprocating engines and alternators located on a single site
• Sizewell B Power Station CMU 2: [SZ2-19] T_SIZB-2 + (50% x T_SIZB-D)
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Poplars, Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (10 components)
• 1 MW of demand reduction
• 1000kW/1200kWh Lithium Ion Battery
• Gas fired reciprocating engines
Inactive • 2022-23 (T-3), 2020-21 (T-4) ...
Plot B at Severn Road Avonmouth BS10 7SE (11 components)
• Existing Generator Battery Energy Storage System
• Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms
• New Build Battery Energy Storage Systems
Active • 2025-26 (T-4), 2025-26 (T-1) ...
5.25 MW
Plot A3, Watervole Way, Doncaster, DN4 5JP (5 components)
• 25 x 400kW cleaned thermal ( using Exhaust Gas Treatments) diesel gensets Disputes: 25*400kW, 50Hz canopy type diesel generator sets ( MTU/Caterpillar that meet the EU?s Stage III A emissions certification and using Gas-To-Liquids (GTL) fuels/lubricants and fitted with Exhaust Gas Treatments (EGT) incorporating Selective Catalytic Reduction (SCR), Diesel Particulate Filter (DPF) and Diesel Oxidation Catalyst (DOC) systems with ?ad-blue?)
• A 20MW new build gas generating station..
• A new build gas generating station.
Inactive • 2020-21 (T-4), 2019-20 (T-1)
Pierces Farm, Field off Goring Lane, Grazeley Green, Reading, Berkshire. RG7 1LY (5 components)
• 1 x 250Kw/250KWh Lithium Ion Battery
• CMU consisting of a reciprocating engine and alternator
Inactive • 2023-24 (T-4), 2020-21 (T-4) ...
Oaks, Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (5 components)
• 1000kW/1200kWh Lithium Ion Battery
• Gas fired reciprocating engines
Inactive • 2022-23 (T-3), 2020-21 (T-4) ...
Mersey Wharf Business Park, Dock Road South, Bromborough Pool, Wirral, Merseyside, CH62 4SU (20 components)
• 16 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
• Ratcliffe Unit 3 coal-fired unit
Active • 2028-29 (T-4), 2027-28 (T-4) ...
61.51 MW
3678.80 MW
Land off Amy Johnson Way, Blackpool, FY4 2RS (14 components)
• A gas fuelled generating station.
• Connah's Quay PS Unit 1 CCGT
• Containerized high speed gas-fired reciprocating engines with transformers, switchgear and associated control gear
Active • 2028-29 (T-4), 2023-24 (T-4) ...
6.54 MW
Land North of Clayhill Farm Westoning,MK45 5JD (5 components)
• 1 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery: at Land North of Clayhill Farm Westoning,MK45 5JD
• A generating station consisting of multiple reciprocating engines and alternators located on a single site.
Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
41.27 MW
Land At Mitchells Industrial Park, Bradberry Balk Lane, Wombwell, Barnsleym, S73 8HR (17 components)
• 5 MW of demand reduction
• CHP Unit
• New reciprocating gensets in acoustic enclosure
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
7.44 MW
FEEDER PILLAR 1 (W9920), BROOKFIELD PARK, MANVERS WAY, WATH-UPON-DEARNE, ROTHERHAM, S63 5DJ (4 components)
• 2MW of demand reduction
• Gas reciprocating engines
Inactive • 2022-23 (T-4), 2019-20 (T-1)
Eurac - Dorset, 16 Mannings Heath Road Poole Dorset BH12 4NJ (42 components)
• 10.000MW DSR
• A gas fuelled generating station.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
21.66 MW
Church Hill Rd, Middleton-on-the-Wolds, Driffield YO25 9UG (10 components)
• 0.250MW Battery Energy Storage System
• 10 x 2MW gas generator units to be installed on designated land within Southbrook Farm
• 5MW of demand reduction
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Caxton Way, Dinnington, Rotherham, S25 3QE (4 components)
• 1 MW diesel gensets
• A 10MW new build gas generating station..
Inactive • 2022-23 (T-1), 2020-21 (T-4)
Bourne Park Solar Farm, Bourne Park, Piddlehinton, Dorset. DT2 7TU (4 components)
• 800kW/ 1100kWh BYD Lithium Ion Battery
• CMU consisting of multiple reciprocating engines and alternators
Inactive • 2023-24 (T-4), 2020-21 (T-4) ...
Bevercotes Energy Park, West Drayton Avenue, Bevercotes, Nottinghamshire, DN22 8DB (5 components)
• 3 x 1MW / 1.2 MWh BYD Lithium Ion Battery
• a new build gas generating station
Inactive • 2023-24 (T-4), 2020-21 (T-4) ...
Ashford Rd, Charing TN27 0DF, United Kingdom (10 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• N/A
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2024-25 (T-4), 2023-24 (T-4) ...
3.45 MW