Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

12 unique locations (481 components)

BN27 (61 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
42.87 MW
Bramble Road South Hiendley Barnsley S72 (1 component)

Reciprocating gas engines running on natural gas

Inactive • 2023-24 (T-1)
5.14 MW
DRAYTON CLOSE SALE CHESHIRE M33 (3 components)
• Gas fired peaking power plant
• Load curtailment
Active • 2025-26 (T-4), 2025-26 (T-1) ...
7.28 MW
EX19 (5 components)
• Domestic EV
• Domestic EV charger
Active • 2025-26 (T-1), 2024-25 (T-1) ...
33.31 MW
FOWLEY COMMON LANE GLAZEBURY WARRINGTON CHESHIRE WA3 (3 components)
• Additional reciprocating gas engines running on natural gas returned to service
• Domestic EV charger
• New build diesel and/or gas dual fuel generating station. First Renewable Beta Limited, Southam Road, Banbury OX16 2SN SP 45615 42662
Active • 2025-26 (T-4), 2024-25 (T-1) ...
16.18 MW
HG2 (96 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
61.94 MW
Pye Bridge Industrial Estate, Pye Bridge, Somercotes, Alfreton DE55 4NX (5 components)

Gas fired peaking power plant

Active • 2028-29 (T-4), 2025-26 (T-1)
36.39 MW
RG8 (71 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
82.08 MW
RH15 (63 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
242.93 MW
STONESWOOD ROAD DELPH OLDHAM LANCASHIRE OL3 (3 components)
• Aux. load separately metered
• Domestic EV charger
• Gas fired peaking power plant
Active • 2028-29 (T-4), 2025-26 (T-4) ...
157.83 MW
TR1 (35 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
78.74 MW
WD3 (135 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
209.09 MW
Loading map...
Showing 12 locations