6 unique locations (104 components)

Carrington Power Station 132 Manchester Road Carrington Manchester M31 4AY United Kingdom (57 components)
• CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
• The CMU component is a combined cycle gas turbine
• one CHP (1.9MW rating) in a horticulatural environment with no aux load
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3488.59 MW
Greatmoor EfW, Greatmoor Road, Woodham, Aylesbury, Buckinghamshire, HP18 0QE (16 components)
• District heating implementation with one asset 1.943MW exporting excess to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
• Genset 2.
• This CMU identifier is the replacement for BUCK01, BUCK02, FCCB01, due to the change in Connection Capacity as per rule 3.5.2 and change from "New build CMU" to "Existing CMU" status FCC Buckinghamshire Ltd. 300kT Energy from Waste Plant with c. 25MW net output. Auxiliary load is not included in the connection capacity i.e the export is net.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
94.17 MW
Hams Hall Sustainable Energy LTD, Edison Road, Hams Hall Distribution Park, Coleshill, B46 1AL (18 components)
• Battery Storage Plant
• Hamms Hall - Existing Site CHP
• Poole Existing Site CHP
Active • 2028-29 (T-4), 2026-27 (T-4) ...
18.43 MW
Land at Thornton Lane Markfield LE67 9TU (2 components)
• 20 MWs of reciprocating engine generation connecting into existing 33kV substation
• 20 MWs of reciprocating generator units to be installed on designated land at Thornton Lane, near Markfield.
Inactive • 2022-23 (T-4), 2021-22 (T-4)
Land off Coastal Road, Scarborough, YO13 0DE (2 components)
• 20 MWs of reciprocating engine generation connecting into existing 33kv substation
• The site comprises of gas reciprocating unit(s)
Inactive • 2022-23 (T-4), 2020-21 (T-4)
LAND ON THE NORTH SIDE OF GALLEY HILL ROAD NORTHFLEET GRAVESEND DA11 9SW (9 components)
• CMU consisting of multiple reciprocating engines and alternators
• Existing OCGT
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Inactive • 2023-24 (T-4), 2023-24 (T-1) ...
9.63 MW