Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

10 unique locations (62 components)

Active MW: 45623.98 MW
Inactive MW: 10846.14 MW
Markinch Power Station, Glenrothes, KY7 6GU (1 component)

The CMU will be formed of multiple gas reciprocating engines.

Inactive • 2022-23 (T-4)
Grimsby Power Station, Moody Lane, Grimsby, DN31 2SW (9 components)
• CMU will be formed of multiple individual gas reciprocating engine units
• Ten (10) 2MWe gas reciprocating gas engines
Active • 2025-26 (T-4), 2024-25 (T-4) ...
37.91 MW
37.91 MW
Cheshire Power Station, North Road, Ellesmere Port, South Wirral, CH65 1AF (13 components)
• Modular reciprocating engines
• One (1) Open Cycle Gas Turbine
• One (1) Open Cycle Gas Turbine MSID: 7382
Active • 2029-30 (T-4), 2028-29 (T-4) ...
287.68 MW
Cheshire Power Station North Road Ellesmere Port South Wirral CH65 1AF (13 components)
Reciprocating engines Open Cycle Gas Turbine (OCGT) RWE GENERATION UK PLC Existing Generating CMU CMU_CHEGT1 CMU_CHEGT1 +2 more CH65
Active • 2029-30 (T-4), 2028-29 (T-4) ...
287.68 MW
Cheshire Power Station, North Road, Ellesmere Port, Cheshire, CH65 1AF (7 components)
• CMU formed of multiple individual Reciprocating Engines
• CMU will be formed of multiple individual gas reciprocating gas engines.
• CMU will be formed of multiple individual reciprocating gas engines.
Reciprocating engines RWE GENERATION UK PLC Existing Generating CMU CMU_CHEN21 CH65
Active • 2025-26 (T-4), 2024-25 (T-4) ...
37.88 MW
Cheshire Power Station North Road Ellesmere Port Cheshire CH65 1AF (7 components)
Reciprocating engines RWE GENERATION UK PLC New Build Generating CMU CMU_CHEN21 CH65
Active • 2025-26 (T-4), 2024-25 (T-4) ...
37.88 MW
Loading map...
Showing 10 locations