Reciprocating engines

2 unique locations (30 components)

Ray Wind Farm, Kirkwhelpington, Newcastle upon Tyne, Northumberland (10 components)
• A new build 10MW battery storage facility. The construction of this new build generating CMU comprises site preparation; ground works for concrete raft foundations and cable trenching; installation of three containerised battery units; six inverter banks; associated 33kV transformer; switchgear and HV station.
• A new build 20 MW / 2 hour battery storage facility. The construction of this new build generating CMU comprises site preparation; ground works for concrete raft foundations and cable trenching; installation of three containerised battery units; six inverter banks; associated 33kV transformer; switchgear and HV station.
• Gas reciprocating engines.
Active • 2024-25 (T-1), 2023-24 (T-4) ...
34.08 MW
Pen-y-Cymoedd Wind Farm, Treherbert Road, Treherbert, Treorchy. Rhondda Cynon Taf. South Wales CF42 5SX (20 components)
• A new build 22 MW battery storage facility. Comprising of five containerised battery units, ten inverter banks (2 per battery container), associated 33kV transformers, switchgear and cabling.
• CMU consisting of multiple reciprocating engines and alternators
Inactive • 2023-24 (T-4), 2023-24 (T-1) ...
7.30 MW