Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

991 unique locations (4566 components) - Page 1 of 40

10-14 Birmingham Road, West Bromwich, B71 4LD (4 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2024-25 (T-4), 2021-22 (T-1)
1020 Slutchers Lane, Centre Park, Warrington, WA1 1QL (9 components)
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• 16 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
14.77 MW
1092 Ransomes Way, Ipswich IP3 8TF, UK (1 component)

16MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.

Inactive • 2022-23 (T-4)
112 Beddington Lane, Croydon, CR0 4TB (1 component)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2022-23 (T-4)
125 Cheston Road Birmingham B7 5EA (1 component)

Energy centre comprising of lean burn, acoustically treated natural gas reciprocating engines.

Inactive • 2022-23 (T-4)
132 Manchester Road, Carrington, Manchester, M31 4AY (17 components)
• 5 x 4.5MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
• 5 x 9.98MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
• One 4.5MW Gas Reciprocating engine with all ancillary equipment to be installed on the Trafford Power Site
Active • 2027-28 (T-4), 2025-26 (T-4) ...
93.41 MW
135 CLYDESDALE PLACE MOSS SIDE INDUSTRIAL ESTATE LEYLAND PR26 7QS (5 components)
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
• CMU consisting of multiple reciprocating engines and alternators
Active • 2024-25 (T-4), 2023-24 (T-4) ...
160 Ipswich Road, Stoke Holy Cross, Norwich NR14 8PQ, UK (3 components)
• The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.
• The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
1A Elms Farm Industrial Estate Edison Road Bedford Bedfordshire MK41 0HU (16 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW.

Active • 2027-28 (T-4), 2026-27 (T-4) ...
4.72 MW
1 Kirkshaw Lane, Ferrybridge, Knottingley, WF11 8RD (4 components)
• AN 8MW new build gas generating station..
• CMU FES003 which is an electrical power generating unit comprised of multiple gas reciprocating engines with an aggregated exporting capacity totalling 4MW. The CMU is located at: 1 Kirkshaw Lane, Ferrybridge, Knottingley, WF11 8RD.
• CMU FES26B which is an electrical power generating unit comprised of multiple gas reciprocating engines with an aggregated exporting capacity totalling 7.5MW. The CMU is located at: 1 Kirkshaw Lane, Ferrybridge, Knottingley, WF11 8RD.
Active • 2026-27 (T-4), 2024-25 (T-4)
7.14 MW
1 Maxwell Road, Woodston Industrial Estate, Peterborough PE2 7JB (5 components)
• This CMU is 10*2MW reciprocating engines using HVO.
• This CMU is 10*2MW reciprocating engines.
• This CMU is 6*2MW reciprocating engines.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
18.70 MW
20 Wallace Way Hitchin SG4 0SE (1 component)

A generating station consisting of multiple reciprocating engines and alternators located on a single site.

Inactive • 2022-23 (T-4)
23 Whittle Road, Ferndale Industrial Estate, Wimborne, BH21 7PW (6 components)

CMU consisting of multiple reciprocating engines and alternators

Active • 2025-26 (T-4), 2024-25 (T-1) ...
4.83 MW
25 Rookwood Way, Haverhill CB9 8PB (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2024-25 (T-4)
25 Rookwood Way, Haverhill, CB9 8PB (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2025-26 (T-4)
25 Southfield Lingard Lane Stockport SK6 2QN (16 components)

1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear

Inactive • 2022-23 (T-4), 2021-22 (T-4)
2 Anchor lane, Bilston, WV14 9NA (1 component)

Energy Centre comprising of lean burn acoustically treated natural gas reciprocating engines

Inactive • 2022-23 (T-4)
2 South Wardpark Place, Wardpark, Cumbernauld, Glasgow, North Lanarkshire, G67 3HX (33 components)
• New build gas generator
• Operational Reciprocating Engine
• Operational gas reciprocating engine.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
7.48 MW
3 Nairn Road, Deans Industrial Estate, Livingston, West Lothian, EH54 8AY (9 components)
• Newbuild gas generator
• Reciprocating engine (natural gas fuelled)
• gas generator
Active • 2026-27 (T-4), 2025-26 (T-1) ...
6.24 MW
40 Gardiner Road, Edinburgh, Midlothian, EH4 3RN (1 component)

New build power station comprised of multiple reciprocating engines.

Active • 2025-26 (T-4)
46 Station Road Stokesley Middlesbrough TS9 7AA (12 components)
• 2 x 2.25 Gas reciprocating engines to be installed at Cleveland Nurseries (replacing existing CHP)
• Gas CHP engines in commercial horticultural usage with no auxilliary load
Active • 2027-28 (T-4), 2025-26 (T-4) ...
4.25 MW
4 Chemistry Lane, Pentre, Deeside CH5 2DA, UK (1 component)

14MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.

Active • 2028-29 (T-4)
12.86 MW
4 Chemistry Lane, Pentre, Deeside, CH5 2DW (3 components)

14MW Power plant comprising 7x2MW gas reciprocating engines. The power plant is connected to the local distribution and gas network.

Inactive • 2022-23 (T-4), 2019-20 (T-1)
4 Chemistry Ln, Pentre, Deeside, CH5 2DA (11 components)
• Peak power plant
• Reciprocating engine
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
4 Chemistry Ln, Pentre, Deeside CH5 2DA, UK (4 components)

14MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.

Active • 2027-28 (T-4), 2026-27 (T-4) ...
13.02 MW
Loading map...
Showing 25 locations