Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

1206 unique locations (4419 components) - Page 10 of 49

Active MW: 45623.98 MW
Inactive MW: 10846.14 MW
Commercial Road, Bromborough, Birkenhead, Wirral, CH62 3NL (1 component)

The CMU component consist of gas fired reciprocating engines to be installed on designated land at Commercial Road, Bromborough Birkenhead, Wirral.

Active • 2024-25 (T-4)
19.04 MW
Common Lane, Wath upon Dearne, Rotherham, South Yorkshire, S63 7DX (4 components)
• Battery energy storage unit
• New reciprocating genset in acoustic enclosure
Reciprocating engines Storage (Duration 3h) FRP MERCIA HOLDCO LIMITED New Build Generating CMU Common Lane Common Lane S63
Active • 2028-29 (T-4), 2025-26 (T-1) ...
15.52 MW
Connect House, Bates Road, Quayside Industrial Estate, Maldon, CM9 5FA (1 component)

14 MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.

Reciprocating engines Blackwater Power Limited New Build Generating CMU Blackwater Power Conditional CM9
Inactive • 2022-23 (T-4)
13.13 MW
Connect House, Bates Road, Quayside Industrial Estate, Maldon, Essex, CM9 5FA (3 components)
• 14MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Reciprocating Engines Reciprocating engines CONRAD (HEYBRIDGE) LIMITED New Build Generating CMU Blackwater Power Blackwater Power CM9
Inactive • 2022-23 (T-1), 2020-21 (T-4) ...
26.47 MW
Cotton Valley STW, Portway, Milton Keynes, MK15 9LZ (1 component)

A new build gas fuelled power generating unit comprising multiple reciprocating engines

Reciprocating engines BALANCE POWER PROJECTS LIMITED New Build Generating CMU COTTON VALLEY Conditional MK15
Inactive • 2022-23 (T-4)
19.03 MW
Cowley Hill Works Boilerhouse, Albert Street, St Helens, WA10 2RZ (15 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas) UK POWER RESERVE LIMITED Existing Generating CMU Cowley Hill Power Station Cowley Hill Power Station +8 more WA10
Active • 2028-29 (T-4), 2027-28 (T-4) ...
72.67 MW
CPG Power, Manchester Rd, Carrington, Manchester, M31 4AY, UK (3 components)
• This CMU [CGTN_4] will be formed of multiple gas reciprocating units controlled centrally & exporting to the Transmission system.
• This CMU will be formed of multiple gas reciprocating units controlled centrally & exporting to the Transmission system.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
141.12 MW
Cps House, Stephenson Road, Severalls Industrial Park, Colchester, CO4 9QR (3 components)

CMU consisting of multiple reciprocating engines and alternators

Reciprocating engines URBAN RESERVE (ASSETCO 2) LIMITED New Build Generating CMU Stephenson Power Stephenson Power Not Prequalified CO4
Active • 2026-27 (T-4), 2025-26 (T-4) ...
16.41 MW
Crookham Common Road, Thatcham, RG19 8BR (2 components)

Gas fired reciprocating engines.

Inactive • 2022-23 (T-4), 2021-22 (T-4)
36.09 MW
Crosby Power, Church Street, Bootle, L20 1AF (4 components)

CMU consisting of multiple reciprocating engines and alternators

Reciprocating engines URBAN RESERVE (ASSETCO) LIMITED New Build Generating CMU Crosby Power Crosby Power L20
Active • 2025-26 (T-4), 2024-25 (T-1) ...
10.88 MW
Cuckoo Road, Nechells, Birmingham, B7 5TR (2 components)

New reciprocating genset in acoustic enclosure

Reciprocating engines FRP MERCIA HOLDCO LIMITED New Build Generating CMU Cuckoo Road Cuckoo Road B7
Inactive • 2020-21 (T-4), 2019-20 (T-1)
14.99 MW
Cuffley Hill, Cuffley, Potters Bar, EN7 5HA (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2022-23 (T-4)
7.14 MW
Cuffley Hill, Cuffley, Potters Bar, Hertfordshire, EN7 5HA (2 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2023-24 (T-4), 2022-23 (T-3)
7.12 MW
Cunliff Road, Blackburn, BB1 5SX (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Reciprocating engines CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Blackburn Not Prequalified BB1
Active • 2025-26 (T-4)
6.68 MW
Currock Road, Carlisle, Cumbria CA2 5AD (4 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment.

Reciprocating engines STOR 141 LTD New Build Generating CMU Bog Bog +1 more CA2
Active • 2024-25 (T-4), 2023-24 (T-4) ...
57.07 MW
Currock Trade Centre, Currock, Carlisle, Cumberland CA2 5AD (2 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment.

Reciprocating engines STOR 140 Ltd New Build Generating CMU CA2
Active • 2028-29 (T-4)
14.96 MW
Currock Trade Centre, Currock, Carlisle, Cumberland, England, CA2 5AD (2 components)

A Distribution Connected gas fueled generating station.

Reciprocating engines BALANCE POWER PROJECTS LIMITED New Build Generating CMU Currock 1 Currock 2 CA2
Active • 2028-29 (T-4)
14.96 MW
Cut Throat Lane, Witham, Essex, CM8 2SZ (3 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2024-25 (T-4), 2023-24 (T-4) ...
19.02 MW
Dafen Power, Llethri Road, Dafen Park Industrial Estate, Llanelli, SA14 8QG (5 components)

10 MW power plant comprising of 5x2MW gas fired reciprocating engines. The power plant is connected to the local distribution network and local gas network.

Reciprocating engines DAFEN RESERVE POWER LIMITED Existing Generating CMU Dafen Power Limited Dafen Reserve Power Limited +3 more SA14
Active • 2028-29 (T-4), 2027-28 (T-4) ...
46.42 MW
Dafen Power, Llethri Road, Dafen Park Industrial Estate, Llanelli, SA14 8QN (5 components)
• 10 MW power plant comprising 5 x 2MW gas fired reciprocating engines. Power plant will be connected to the local distribution network and local gas network.
• 10 MW power plant comprising of 5x2MW gas fired reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• 10 MW power plant comprising of 5x2MW gas fired reciprocating engines. The power plant will be connected to the local distribution network and local gas network.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
27.92 MW
Daneshill Landfill Site, Daneshill Road, Lound, Nr Retford, Nottinghamshire, DN22 8RB (1 component)

The site comprises of gas reciprocating unit(s)

Reciprocating engines INFINIS ALTERNATIVE ENERGIES LIMITED New Build Generating CMU Conditional DN22
Inactive • 2022-23 (T-4)
2.71 MW
Danes Moss Landfill Site, Gawsworth, Macclesfield, Cheshire, SK11 0LR (2 components)

Gas fired reciprocating engine(s)

Reciprocating engines INFINIS ALTERNATIVE ENERGIES LIMITED New Build Generating CMU DANESMOSS Not Prequalified SK11
Inactive • 2023-24 (T-4), 2022-23 (T-3)
3.61 MW
Danes Moss Landfill Site, Gawsworth, Macclesfield, Cheshire, SK11 9QP (1 component)

The site comprises of gas reciprocating unit(s)

Reciprocating engines INFINIS ALTERNATIVE ENERGIES LIMITED New Build Generating CMU Conditional SK11
Inactive • 2022-23 (T-4)
3.88 MW
Davy Drive Peterlee SR8 2JF (3 components)

New build power station comprised of multiple reciprocating engines. (3)

Reciprocating engines HARTREE SOLUTIONS (UK) LIMITED New Build Generating CMU PETERLEE PETERLEE SR8
Inactive • 2022-23 (T-1), 2020-21 (T-1) ...
Davy Drive, Peterlee, SR8 2JF (7 components)

New build power station comprised of multiple reciprocating engines.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
26.64 MW
Loading map...
Showing 25 locations