Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

1206 unique locations (4419 components) - Page 11 of 49

Active MW: 45623.98 MW
Inactive MW: 10846.14 MW
Davy Road Astmoor Industrial Estate Runcorn WA7 1PZ (2 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (2)

Reciprocating engines CONRAD (RUNCORN) LIMITED New Build Generating CMU Runcorn Runcorn WA7
Inactive • 2022-23 (T-1), 2021-22 (T-1)
Davy Road, Astmoor Industrial Estate, Runcorn, WA7 1PZ (4 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
12.86 MW
Deanprint, Cheadle Heath, Works, Stockport Road, Stockport, SK3 0PR (1 component)

A new build gas fuelled power generating unit comprising multiple reciprocating engines.

Reciprocating engines SWB Power Ltd New Build Generating CMU STOCKPORT ROAD Conditional SK3
Inactive • 2022-23 (T-4)
4.76 MW
Dering Way, Gravesend, Kent, DA12 2QX (1 component)

The CMU component consist of gas fired reciprocating engines to be installed on designated land at Dering Way, Gravesend, Kent.

Reciprocating engines RELIANCE ENERGY LIMITED New Build Generating CMU Not Prequalified DA12
Active • 2024-25 (T-4)
Dering Way, Gravesend, Kent, DA12 2QX (1 component)

The CMU component consist of gas fired reciprocating engines to be installed on designated land at Dering Way, Gravesend, Kent.

Active • 2024-25 (T-4)
15.24 MW
Derwent Power Plant, Holme Lane, Spondon, Derby, DE21 7NT (2 components)
• CMU S22DPP will be formed of multiple individual generating units controlled centrally and exporting to the distribution system
• CMU S23DPP will be formed of multiple individual generating units controlled centrally and exporting to the distribution system
Reciprocating engines UK UTILITY RESERVE LIMITED New Build Generating CMU Derwent Power Station Derwent Power Station Not Prequalified DE21
Inactive • 2023-24 (T-4), 2022-23 (T-3)
94.79 MW
Devon Street, Birmingham, B7 4TH (6 components)

A gas fuelled generating station.

Reciprocating engines AVE 003 Limited AVE 003 LIMITED New Build Generating CMU Devon Street Devon Street +2 more Not Prequalified B7
Active • 2025-26 (T-4), 2024-25 (T-4) ...
20.00 MW
Dewi Road, Tregaron, SY25 6JP (2 components)

STOR diesel engines that will operate environmentally with mixed fuel

Reciprocating engines GFI TREGARON LTD Existing Generating CMU Tregaron SY25
Active • 2025-26 (T-1), 2024-25 (T-1)
12.42 MW
Dig Gate Lane, Lady House, Milnrow, Rochdale, Greater Manchester, England, OL16 4NR (2 components)
• A Distribution Connected Battery Energy Storage System.
• A Distribution Connected gas fueled generating station.
Active • 2028-29 (T-4)
10.40 MW
Dig Gate Lane, Rochdale, OL16 4NR (3 components)

4.4MW gas fired peaking power plant

Reciprocating engines ROCHDALE POWER LTD New Build Generating CMU ROCH01 ROCH01 Not Prequalified OL16
Active • 2028-29 (T-4), 2027-28 (T-4) ...
12.45 MW
Distington Landfill Site, Pitwood Road, Lillyhall, Workington, Cumbria, CA14 4JP (1 component)

The site comprises of gas reciprocating unit(s)

Reciprocating engines INFINIS ALTERNATIVE ENERGIES LIMITED New Build Generating CMU Conditional CA14
Inactive • 2022-23 (T-4)
1.90 MW
Dock Yard Power, Dock Yard Road, Ellesmere Port, CH65 4EF (4 components)

CMU consisting of multiple reciprocating engines and alternators

Reciprocating engines URBAN RESERVE (ASSETCO) LIMITED New Build Generating CMU Dock Yard Power Dock Yard Power CH65
Active • 2025-26 (T-4), 2024-25 (T-1) ...
6.36 MW
Dogsthorpe Landfill Site, Welland Road, Peterborough, Cambridgeshire, PE1 3TD (7 components)
• 2 gas reciprocating engines with a combined export output of approximately 2MW. The generating equipment is connected to the distribution network via an import/export meter.
• Gas reciprocating engines
Active • 2028-29 (T-4), 2027-28 (T-4) ...
20.11 MW
Dogsthorpe Landfill Site Welland Road Peterborough Cambridgeshire PE1 4TE (2 components)

2 gas reciprocating engines with a combined export output of approximately 2MW. The generating equipment is connected to the distribution network via an import/export meter. (2)

Inactive • 2020-21 (T-1), 2019-20 (T-1)
Dogsthorpe Landfill Site, Welland Road, Peterborough, Cambridgeshire, PE1 4TE (3 components)

2 gas reciprocating engines with a combined export output of approximately 2MW. The generating equipment is connected to the distribution network via an import/export meter.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
3.46 MW
Drake Grove, Brundell Road, Yapton, Arundel, BN18 0HX (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Reciprocating engines CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Bilsham Not Prequalified BN18
Active • 2025-26 (T-4)
6.87 MW
Drake Grove, Burndell Road, Yapton, Arundel, BN18 0HX (4 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Reciprocating engines CONRAD (BILSHAM) LIMITED New Build Generating CMU Bilsham Bilsham +1 more BN18
Active • 2026-27 (T-4), 2025-26 (T-1) ...
27.23 MW
Drakelow Power Station, Burton-on-Trent, DE15 9NG (2 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Reciprocating engines UK Dynamic Reserve Limited New Build Generating CMU Conditional DE15
Inactive • 2022-23 (T-4)
36.15 MW
Dunnikier Peaking Power, Wheatfield Road, Kirkcaldy. Fife. KY1 3PE (2 components)

The CMU is a new reciprocating engine based gas fuelled generating unit.

Reciprocating engines OCGT and Reciprocating Engines Sainc Energy Limited New Build Generating CMU DPG-GAS DPG-GAS Rejected KY1
Inactive • 2022-23 (T-4), 2021-22 (T-4)
37.23 MW
Dunsteads Farm, Trueloves Lane, Ingatestone, CM4 0NH (1 component)

20MW gas fuelled plant using new containerised engines with associated switchgear, substation and gas metering kiosk, and connections to the electricity and gas grid. The total planned capital expenditure for …

Reciprocating engines Edge Power (Larkfield Farm) Limited New Build Generating CMU 2018 20MW TWO Rejected CM4
Inactive • 2022-23 (T-4)
19.03 MW
Eagle Business Park, Yaxley, PE7 3GP (4 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Reciprocating engines CONRAD (YAXLEY) LIMITED New Build Generating CMU Yaxley Yaxley +1 more PE7
Active • 2024-25 (T-4), 2023-24 (T-1) ...
20.58 MW
EDF Land, Cliff Quay, Ipswich Docks, Suffolk, IP3 0NA (Please refer to "Balance Power Limited - PPG Supporting Letter" for further clarity) (1 component)

A 20 MW CMU, operating on a dockside, metered at the distribution boundary and having no auxilliary load on site.

Reciprocating engines BALANCE POWER LIMITED Existing Generating CMU Ipswich Docks A IP3
Inactive • 2019-20 (T-1)
EDF Land, Cliff Quay, Ipswich Docks, Suffolk, IP3 0NA, (Please refer to "Balance Power Limited - PPG Supporting Letter" for further clarity) (1 component)

A 20 MW CMU, operating on a dockside, metered at the distribution boundary and having no auxilliary load on site.

Inactive • 2019-20 (T-1)
19.03 MW
Loading map...
Showing 25 locations