Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

1206 unique locations (4419 components) - Page 12 of 49

Active MW: 45623.98 MW
Inactive MW: 10846.14 MW
EDF Land, Cliff Quay, Ipswich Docks, Suffolk, IP3 0NA (Please refer to "Equivalence Energy Limited - PPG Supporting Letter" for further clarity on the CMU address) (1 component)

Renewable green diesel fuelled generators, connected to the distrbution network at 132KV, metered using a standard half-hour (COP2) meter at the distrbution network boundary with no auxilliary load on site.

Reciprocating engines EQUIVALENCE ENERGY LIMITED Existing Generating CMU Ipswich 2 IP3
Inactive • 2019-20 (T-1)
EDF Land, Cliff Quay, Ipswich Docks, Suffolk, IP3 0NA, (Please refer to "Equivalence Energy Limited - PPG Supporting Letter" for further clarity on the CMU address) (1 component)

Renewable green diesel fuelled generators, connected to the distrbution network at 132KV, metered using a standard half-hour (COP2) meter at the distrbution network boundary with no auxilliary load on site.

Inactive • 2019-20 (T-1)
19.03 MW
Edge Lane Street, Royton, Oldham, OL2 6DS (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2022-23 (T-4)
4.76 MW
Eldon Way, Biggleswade, SG18 8NH (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Reciprocating engines CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Biggleswade Not Prequalified SG18
Active • 2025-26 (T-4)
6.87 MW
Elevator Road, Trafford Park M17 1BR (3 components)
• 20MW of installed capacity of gas fuelled reciprocating engines to be installed on designated land within a manufacturing compound on Elavator Road
• 20MW of installed capacity of gas fuelled reciprocating engines to be installed on designated land within a manufacturing compound on Elevator Road
Reciprocating engines BIOGAS TECHNOLOGY LIMITED New Build Generating CMU Elavator Elavator M17
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
38.02 MW
Ellifoot Lane, Burstwick, HU12 9EB (5 components)
• A Distribution Connected 4.5MW gas fueled generating station
• a Combined Heat and Power Plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
24.57 MW
Elm Court Estate, Capstone Road, Gillingham, ME7 3JQ (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Reciprocating engines CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Lordswood Not Prequalified ME7
Active • 2025-26 (T-4)
6.87 MW
Ely Road, Waterbeach, Cambridge, Cambridgeshire, CB25 9PG (2 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2023-24 (T-4), 2022-23 (T-3)
9.72 MW
Enterprise Drive, Four Ashes, Wolverhampton WV10 7DF (1 component)

A new build gas fuelled power generating unit comprising multiple reciprocating engines.

Reciprocating engines SWB Power Ltd New Build Generating CMU FOUR ASHES Conditional WV10
Inactive • 2022-23 (T-4)
4.76 MW
ENTERPRISE POWER 11 - 12 ENTERPRISE WAY WESTWOOD INDUSTRIAL ESTATE MARGATE CT9 4JA (3 components)

CMU consisting of multiple gas reciprocating engines and alternators (3)

Reciprocating engines URBAN RESERVE (ASSETCO) LIMITED New Build Generating CMU Enterprise Power Enterprise Power CT9
Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
4.76 MW
ENTERPRISE POWER, 11 - 12 ENTERPRISE WAY, WESTWOOD INDUSTRIAL ESTATE, MARGATE, CT9 4JA (4 components)

CMU consisting of multiple gas reciprocating engines and alternators

Active • 2024-25 (T-4), 2023-24 (T-1) ...
9.52 MW
E.r.f Way, Middlewich CW10 0QJ (3 components)

Gas fired reciprocating engines

Reciprocating engines CONRAD (MIDDLEWICH) LIMITED New Build Generating CMU ERF Way ERF Way CW10
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
39.41 MW
Europa Energy Centre, Hills Court Road, Ash, Kent, CT3 2AP (15 components)
• The CMU Component will have a connection capacity of 15MW. Gas-fired reciprocating engine will be the technology used.
• The CMU component BREH01 consists of one CHP engine supplying heat, CO2 and power to the on site Nursery.
• The CMU component BREH02 consists of one CHP engine supplying heat, CO2 and power to the on-site Nursery.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
104.20 MW
Excalibur Road, Beacons Park, Gorleston, Great Yarmouth, Norfolk NR31 7RQ (10 components)

New build power station comprised of multiple reciprocating engines.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
53.26 MW
Exeter Road, Ottery St. Mary, EX11 1RB (1 component)

A new build gas fuelled power generating unit comprising multiple reciprocating engines.

Reciprocating engines SWB Power Ltd New Build Generating CMU OTTERY ST. MARY Conditional EX11
Inactive • 2022-23 (T-4)
4.76 MW
Eyre Street, Birmingham, B18 7AD (3 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
Reciprocating engines EYRE STREET POWER LIMITED New Build Generating CMU EYRE STREET Eyre Street B18
Active • 2024-25 (T-4), 2023-24 (T-4) ...
13.31 MW
Factory Lane, Croydon, Surrey, CR0 3LE (4 components)

The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output

Reciprocating engines OCGT and Reciprocating Engines WHITETOWER ENERGY LIMITED Existing Generating CMU Croydon Energy Croydon Energy +1 more CR0
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
189.45 MW
Faraday Rd, Plymouth, PL4 0ST (4 components)
• Gas fired reciprocating engines.
• New build CMU employing gas fired reciprocating engines. The Financial Commitment Milestone has been achieved for a previous auction. The site will generate at unity and therefore a power factor of 1.0 has been used to convert MVA to MW.
Reciprocating engines Viridis 178 Limited New Build Generating CMU DG002 DG002 +1 more Conditional PL4
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
71.15 MW
Faraday Road, Plymouth, PL4 0ST (6 components)
• Gas fired reciprocating engines.
• Reciprocating Engines
Active • 2024-25 (T-4), 2021-22 (T-4) ...
75.75 MW
Felindre Rd, Pencoed, Bridgend, CF35 5HU (2 components)

A new build, gas fuelled generation station

Reciprocating engines CENTRICA DISTRIBUTED GENERATION LIMITED New Build Generating CMU Stanford le hope (A) Stanford le hope (B) CF35
Active • 2026-27 (T-4)
38.07 MW
Felindre Road, Pencoed, Brigend, CF35 5HU (1 component)

New build 40MW gas Peaker plant

Reciprocating engines CENTRICA DISTRIBUTED GENERATION LIMITED New Build Generating CMU Not Prequalified CF35
Active • 2025-26 (T-1)
37.21 MW
Ffordd Penamser Road, Porthmadog, Gwynedd, LL49 9GB (2 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Reciprocating engines CONRAD ENERGY (DEVELOPMENTS) LIMITED New Build Generating CMU Porthmadog Not Prequalified LL49
Active • 2025-26 (T-4), 2022-23 (T-1)
4.77 MW
Fire Station Lane, Avonmouth, Bristol, BS11 9EH (4 components)

Gas fired reciprocating engines.

Reciprocating engines GFPII Limited New Build Generating CMU VI026 VI026 +1 more BS11
Active • 2024-25 (T-4), 2023-24 (T-4) ...
76.06 MW
Five Mile Drive, Upton Wold, Moreton-In-Marsh, WR12 7LD (9 components)
• New build site with gas reciprocating engines to replace diesel plant
• New state-of-the-art green bio-fuel reciprocating engines replacing existing diesel reciprocating engines.
• STOR diesel engines that will operate environmentally with mixed fuels
Reciprocating engines GFI73 LTD NORTHWICK POWER GENERATION NO 1 LIMITED New Build Generating CMU Northwick Northwick WR12
Active • 2028-29 (T-4), 2027-28 (T-4) ...
81.33 MW
Five Oaks Grid Substation Horsham Road Five Oaks Billinghurst, RH14 9AT (4 components)

4 x reciprocating engines (3)

Reciprocating engines SSEPG (OPERATIONS) LIMITED Existing Generating CMU Five Oaks Five Oaks +1 more RH14
Inactive • 2022-23 (T-1), 2021-22 (T-1) ...
Loading map...
Showing 25 locations