Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

565 unique locations (3571 components) - Page 15 of 23

Land To The North Of 3 Haywood Way Hastings, TN35 4NR (7 components)
• CMU consisting of multiple reciprocating engines and alternators
• CMU consisting of multiple reciprocating engines and alternators.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
33.52 MW
Land to the north of A1079, Cottingham, HU17 0RP (4 components)

Gas fired reciprocating engines.

Inactive • 2022-23 (T-4)
Land to the rear of Hawley House, Outgang, Lane Dinnington, Rotherham. (3 components)

New reciprocating engines housed within acoustic enclosures

Inactive • 2019-20 (T-1)
Land to the South of Clay Hill off Hamlet Hill CM19 5JR (2 components)

Gas reciprocating engines

Active • 2028-29 (T-4), 2023-24 (T-4)
46.74 MW
Land to the South of Clay Hill off Hamlet Hill, CM19 5JR (2 components)

Gas reciprocating engines

Active • 2025-26 (T-4), 2023-24 (T-4)
47.73 MW
Land to the south of the A883, Falkirk Road, near Bonnybridge FK4 1SN. This site pre-qualified last year as CFBS13 (2 components)

The facility consists of a series of gas fired generators. It connects to SPEN?s 33kV distribution network at 33kV.

Inactive • 2022-23 (T-3), 2022-23 (T-4)
Land to the West of Chapterhouse Close, Ellesmere Port, CH65 4EL (2 components)

49.9 MW Gas Reciprocating Engines envisaged to be made up of multiple modules.

Inactive • 2023-24 (T-4)
47.40 MW
Land west of Cadwell Lane, Hitchin, SG4 0AG (2 components)

3 X 2MW gas fuelled generators installed on a compound on land to the west of Cadwell Lane

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Land west of Cheston Road, Birmingham, B7 5EU (3 components)

3 x 2MW gas fuelled generator units to be installed on a compound on industrial land west of Cheston Road.

Inactive • 2023-24 (T-4), 2022-23 (T-3)
5.70 MW
Langstone Power Generation Plant, Southmoor Lane, Havant, Hampshire, PO9 1JW (10 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2026-27 (T-4), 2025-26 (T-4) ...
19.05 MW
Liverpool Street, Bordesley, Birmingham, B9 4DS (2 components)

A new build gas fuelled power generating unit comprising multiple reciprocating engines.

Inactive • 2022-23 (T-4)
Liverton Business Park Exmouth, Devon, EX8 2NU (2 components)

A gas fuelled generating station.

Inactive • 2023-24 (T-4), 2022-23 (T-3)
llanddewi Brefi Road, Tregaron, SY25 6JP (5 components)

STOR diesel engines that will operate environmentally with mixed fuel

Active • 2026-27 (T-4), 2023-24 (T-1)
18.92 MW
Llay Grid Capacity Site Llay Hall Farm Llay Wrexham LL12 0TH (4 components)
• 3.4MW of installed capacity of gas fuelled reciprocating engines to be installed on designated land.
• 3MW of installed capacity of gas fuelled reciprocating engines to be installed on designated land.
Active • 2024-25 (T-1), 2023-24 (T-4) ...
6.06 MW
Loddon Power,Unit A, The Loddon Centre, Wade Road, Basingstoke, RG24 8QW (4 components)

16 MW power plant comprising 8x2MW gas reciprocating engines. The power plant is connected to the Local distribution network and local gas network.

Active • 2028-29 (T-4), 2026-27 (T-4)
44.30 MW
Long Acres Road Neston CH64 3RL (20 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2025-26 (T-4), 2023-24 (T-1) ...
9.53 MW
Long Lane, Westhoughton, Bolton, Lancashire BL5 3QR (5 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
19.04 MW
Longridge Road, Preston, Lancashire PR2 5NQ (9 components)
• Battery Storage Facility
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
• Energy facility comprising of reciprocating engine sets.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
38.04 MW
Luton Rd Toddington LU5 6HT (2 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2022-23 (T-4)
 Luton Road, Fancott, Toddington LU5 6HT (13 components)
• Existing Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2024-25 (T-4), 2023-24 (T-1) ...
17.15 MW
M1, Luton, LU5 6HR (3 components)

The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.

Inactive • 2023-24 (T-4), 2022-23 (T-3)
47.02 MW
M65, Accrington BB5 5WE (10 components)
• Gas fired reciprocating engines.
• gas fired reciprocating engines
Active • 2024-25 (T-1), 2020-21 (T-4) ...
39.21 MW
M74 Gallowflat Rutherglen Scotland G73 1PX (2 components)

A new build gas fuelled power generating unit comprising multiple reciprocating engines.

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Loading map...
Showing 25 locations