Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

517 unique locations (2572 components) - Page 17 of 21

Active MW: 45623.98 MW
Inactive MW: 10846.14 MW
QinetiQ Portsdown Technology Park, Southwick Rd, Portsmouth, PO6 3RU (1 component)

20MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.

Reciprocating engines WP GRID STORAGE 5 LIMITED New Build Generating CMU Portsdown Power station Not Prequalified PO6
Active • 2027-28 (T-4)
18.68 MW
Radstone Rd, Radstone, Brackley NN13 5PY (5 components)
• A new build diesel or gas grid support plant
• An Existing diesel grid support plant
• An Exiting diesel grid support plant
Reciprocating engines OCGT and Reciprocating Engines HALL FARM ENERGY LIMITED Existing Generating CMU Hall Farm Hall Farm +2 more NN13
Active • 2025-26 (T-1), 2024-25 (T-1) ...
18.88 MW
Rassau Industrial Estate, Ebbw Vale, South Wales, NP23 5SD (15 components)
• 16MW Power plant comprising 8x2MW gas reciprocating engines.The Power plant is connected to the local distribution and gas network.
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
• 16MW Power plant comprising reciprocating engines.The Power plant is connected to the local distribution and gas network.
Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas) OGMORE POWER LIMITED Existing Generating CMU Ogmore Power Ogmore Power +7 more NP23
Active • 2028-29 (T-4), 2027-28 (T-4) ...
134.74 MW
Rear Grazing Land, Crescent Industrial Estate, Station Road, Southampton, Hampshire, SO16 0YD (3 components)

20MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.

Reciprocating engines Nursling Power Limited New Build Generating CMU Nursling Power Nursling Power SO16
Active • 2024-25 (T-4), 2023-24 (T-4) ...
37.66 MW
Rectory Field, Cards Road, Sandon, CM2 7AE (6 components)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
45.95 MW
Redditch Generation Station, Windsor Road, Redditch, B97 6HE (11 components)
• Battery Storage Station
• Gas reciprocating engines as the generating unit.
• Open cycle gas turbine as the generating unit.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
174.30 MW
Redscar Business Park, Preston, PR2 5NJ (2 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment.

Reciprocating engines STOR 122 Ltd New Build Generating CMU PR2
Active • 2028-29 (T-4)
14.96 MW
Rhodesia Power Limited, Highgrounds Industrial Estate Highgrounds road, Rhodesia, Worksop, S80 3AT (3 components)

The CMU component consist of gas fired reciprocating engines, organic rankine cycle turbines and stack gas-recovery carbon capture to be installed on designated land at Rhodesia Power Limited, Highgrounds Industrial … (3)

Reciprocating engines RHODESIA POWER LIMITED New Build Generating CMU Rhodesia Power Limited S80
Active • 2025-26 (T-1), 2024-25 (T-1) ...
28.30 MW
Rhodesia Power Limited, Highgrounds Industrial Estate, Highgrounds road, Rhodesia, Worksop, S80 3AT (4 components)

The CMU component consist of gas fired reciprocating engines, organic rankine cycle turbines and stack gas-recovery carbon capture to be installed on designated land at Rhodesia Power Limited, Highgrounds Industrial …

Active • 2026-27 (T-4), 2025-26 (T-1) ...
37.82 MW
Rhymney STOR Gen Room Unit 48 Portmanmoor Road Industrial Estate Rover Way Cardiff CF24 5HB (2 components)

Gas reciprocating engines (2)

Reciprocating engines ALKANE ENERGY UK LIMITED Existing Generating CMU Rhymney Rhymney CF24
Active • 2028-29 (T-4), 2024-25 (T-4)
6.78 MW
Rhymney, STOR Gen Room, Unit 48, Portmanmoor Road Industrial Estate, Rover Way, Cardiff, CF24 5HB (4 components)
• Gas reciprocating engines
• Gas reciprocating engines as the generating unit.
Reciprocating engines ALKANE ENERGY UK LIMITED Refurbishing Generating CMU Rhymney CF24
Active • 2028-29 (T-4), 2027-28 (T-4) ...
22.50 MW
Ribble Court, Red Scar Business Park, Preston, Lancashire, England, PR2 5LX (2 components)

A Distribution Connected gas fueled generating station.

Reciprocating engines BALANCE POWER PROJECTS LIMITED New Build Generating CMU Longridge 1 Longridge 2 PR2
Active • 2028-29 (T-4)
14.96 MW
Road off Ffordd William Morgan St Asaph LL17 0LF (1 component)

Construction of a New Generating CMU comprising of gas fuelled reciprocating generation sets and gas delivery plant

Reciprocating engines CONRAD ENERGY (DEVELOPMENTS) LIMITED New Build Generating CMU St. Asaph B Not Prequalified LL17
Active • 2024-25 (T-4)
Road off Ffordd William Morgan, St Asaph, LL17 0LF (1 component)

Construction of a New Generating CMU comprising of gas fuelled reciprocating generation sets and gas delivery plant

Active • 2024-25 (T-4)
4.76 MW
Rochester Power Generation Plant, Whitewall Road, Medway City Estate, Rochester, Kent, ME2 4DZ (9 components)
• Existing Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Reciprocating Engines Reciprocating engines CONRAD (ROCHESTER) LIMITED New Build Generating CMU Rochester Rochester +1 more ME2
Active • 2026-27 (T-4), 2025-26 (T-1) ...
25.02 MW
Rosper Road Immingham North Lincolnshire DN40 3DZ (1 component)

New build gas reciprocating multi-engine generating plant

Reciprocating engines VPI IMMINGHAM ENERGY PARK A LIMITED New Build Generating CMU VPI Energy Park A DN40
Active • 2024-25 (T-1)
47.08 MW
Rosper Road, Immingham, North Lincolnshire, DN40 3DZ (18 components)
• Battery storage unit
• Gas CHP on South bank of river Humber providing electricity and industrial steam
• New build gas reciprocating multi-engine generating plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
11434.68 MW
Royal Oak Way North, Daventry, NN11 8PQ (3 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
Reciprocating engines Balance Energy 4 Ltd New Build Generating CMU Braunston Braunston Not Prequalified NN11
Active • 2024-25 (T-4), 2023-24 (T-4) ...
13.85 MW
Salford Road, Over Holton, Bolton, Lancashire BL5 1BW (5 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment.

Reciprocating engines SALFORD POWER LIMITED New Build Generating CMU Salford Salford +2 more BL5
Active • 2024-25 (T-4), 2023-24 (T-4) ...
76.10 MW
Scawby Brook, Brigg, Lincolnshire DN20 9LT (5 components)
• A Prospective New Build Gas reciprocating energy reserve facility
• Gas reciprocating energy reserve facility
Active • 2024-25 (T-4), 2023-24 (T-4) ...
230.52 MW
Scawby Brook, Scawby, Brigg, DN20 9LT. (4 components)

Brigg Gas Peaker

Reciprocating engines CENTRICA DISTRIBUTED GENERATION LIMITED New Build Generating CMU 8RESAK 8RESAK DN20
Active • 2026-27 (T-4), 2025-26 (T-4) ...
158.29 MW
Severn Road, Almondsbury, Bristol, BS10 7GD (3 components)
• A new build, gas fuelled generation station
• A new build, gas fuelled generation station.
Reciprocating engines AVONMOUTH PROJECT CO LIMITED New Build Generating CMU Avonmouth Shapfell 1 +1 more BS10
Active • 2027-28 (T-4), 2026-27 (T-4)
47.08 MW
Severn Road, Treforest Industrial Estate, Ponypridd, CF37 5TA (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Reciprocating engines CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Nantgarw Not Prequalified CF37
Active • 2025-26 (T-4)
6.87 MW
Shaw Side, Heyside, Luzley Brook, Oldham, Greater Manchester, England, OL2 6HL (2 components)

A Distribution Connected gas fueled generating station.

Reciprocating engines BALANCE POWER PROJECTS LIMITED New Build Generating CMU Birshaw 1 Birshaw 2 OL2
Active • 2028-29 (T-4)
14.96 MW
Shirebrook 1, Acreage Lane, Shirebrook, Nottinghamshire, NG20 8RN (13 components)
• Gas reciprocating engines
• Gas reciprocating engines as the generating unit.
• Gas reciprocating engines.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
72.89 MW
Loading map...
Showing 25 locations