Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

1206 unique locations (4419 components) - Page 17 of 49

Active MW: 45623.98 MW
Inactive MW: 10846.14 MW
Hilcote Lane, Alfreton, DE55 5HR (4 components)

New build power station comprised of multiple reciprocating engines.

Inactive • 2022-23 (T-4), 2019-20 (T-1)
30.45 MW
Hilfield Lane, Bushey, Hertsmere, Hertfordshire, WD25 8DA, United Kingdom (1 component)

The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.

Reciprocating engines CSE20 Limited New Build Generating CMU Elstree20 Not Prequalified WD25
Active • 2024-25 (T-4)
46.18 MW
Hilfield Lane, Bushey, Hertsmere, Hertforshire, East of England, England (2 components) Geocoding Needed

The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.

Reciprocating engines CSE20 Limited New Build Generating CMU Elstree Not Prequalified
Inactive • 2023-24 (T-4), 2022-23 (T-3)
47.02 MW
Hilfield Ln, Radlett, Watford WD25 8DT, UK (1 component)

The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.

Reciprocating engines CSE20 Limited New Build Generating CMU Elstree Conditional WD25
Inactive • 2022-23 (T-4)
46.14 MW
Hills Storage & Distribution Centre Stanley Way Stanley Industrial Estate Skelmersdale WN8 8EA (2 components)
• 20MW gas fuelled generating station
• A new build gas fuelled generating station.
Reciprocating engines OCGT and Reciprocating Engines SWB SKELMERSDALE LTD New Build Generating CMU Biodynamic1 Biodynamic1 WN8
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Hills Storage & Distribution Centre, Stanley Way, Stanley Industrial Estate, Skelmersdale, WN8 8EA (3 components)
• 20MW gas fuelled generating station
• A new build gas fuelled generating station.
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
56.82 MW
Hindlip Lane, Worcester, WR3 8SB (4 components)
• A gas fuelled generating station.
• A new build 7.5MW gas fuelled generating station.
Reciprocating engines ADV 001 LIMITED ADV 001 Limited New Build Generating CMU Hindlip Hindlip +1 more Not Prequalified WR3
Active • 2025-26 (T-4), 2024-25 (T-4) ...
21.43 MW
Holden Way, Wainwright Street, Dukinfield, Cheshire SK16 5PL (4 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment.

Reciprocating engines STOR 104 LTD New Build Generating CMU Sandy Lane Sandy Lane +1 more SK16
Active • 2024-25 (T-4), 2023-24 (T-4) ...
57.07 MW
Hollin Bridge Street, Blackburn, BB2 4AY (2 components)

A gas fuelled generating station.

Reciprocating engines AVE 001 Limited New Build Generating CMU Hollin Bridge Not Prequalified BB2
Inactive • 2023-24 (T-4), 2022-23 (T-3)
4.27 MW
Holt Road, Wimborne, BH21 6SD (2 components)

A gas fuelled electrical power generating unit comprising multiple reciprocating engines.

Reciprocating engines BALANCE POWER PROJECTS LIMITED New Build Generating CMU MANNINGTON Not Prequalified BH21
Inactive • 2023-24 (T-4), 2022-23 (T-3)
6.65 MW
Hoon Hay Manor, Marston Lane, Hatton, Derby, DE65 5EA (14 components)

Reciprocating genset

Reciprocating engines FRP MERCIA HOLDCO 2 LIMITED New Build Generating CMU Hatton Hatton +1 more DE65
Active • 2028-29 (T-4), 2027-28 (T-4) ...
11.79 MW
Houghton Main CMU Generation Plant, Park Spring Road, S Grimethorpe, S72 0HN (4 components)

Gas reciprocating engines

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
5.04 MW
Houghton Main Generation Plant, Park Spring Road, S Grimethorpe, S72 0HN (5 components)
• Gas reciprocating engines as the generating unit.
• Gas reciprocating engines.
Reciprocating engines ALKANE ENERGY UK LIMITED Refurbishing Generating CMU Houghton S72
Active • 2028-29 (T-4), 2027-28 (T-4) ...
20.80 MW
Hound Road, Netley, Southampton, SO31 5FS (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Reciprocating engines CONRAD ENERGY (DEVELOPMENTS) LIMITED New Build Generating CMU Hamble Not Prequalified SO31
Active • 2024-25 (T-4)
5.71 MW
Howard Road, Park Farm Industrial Estate, Redditch B98 7SE (2 components)

Redditch 20MW Gas Peaker

Reciprocating engines CENTRICA BARRY LIMITED Existing Generating CMU 8RESAI B98
Active • 2025-26 (T-4), 2025-26 (T-1)
27.77 MW
Howard Road, Park Farm Industrial Estate, Redditch, B98 7SE (4 components)

Redditch 20MW Gas Peaker Project

Reciprocating engines CENTRICA BARRY LIMITED New Build Generating CMU 8RESAI B98
Active • 2026-27 (T-4), 2024-25 (T-1) ...
62.66 MW
Howard Way, Harlow, CM20 2AB (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2022-23 (T-4)
7.61 MW
HOWICK HALL FARM HOWICK CROSS LANE, PENWORTHAM, PRESTON, PR1 0NS (12 components)
• Battery Storage Plant
• Gas peaking reciprocating engines
Active • 2025-26 (T-4), 2024-25 (T-4) ...
168.56 MW
Hull Reserve Power, Staithes Road, Hull, HU12 8DX (4 components)

21 MW power plant comprising 11 gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.

Reciprocating engines HULL RESERVE POWER LIMITED Existing Generating CMU Hull Reserve Power HU12
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
19.81 MW
Immingham Landfill Site, Queens Road, Immingham, Lincolnshire, DN40 1QR (3 components)
• Gas fired reciprocating engine(s)
• The site comprises of gas reciprocating unit(s)
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
3.80 MW
J3 Business Park, Balby Carr Bank, Balby, Doncaster, DN4 8DE (3 components)

A 20MW New Build gas fuelled generating station.

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
56.95 MW
Jack Martin Way, Fintry, Dundee, DD4 9FF (2 components)

A new build, gas fuelled generation station.

Reciprocating engines FISHCROSS GENERATION LIMITED New Build Generating CMU Fintry Generation Fintry Generation DD4
Active • 2028-29 (T-4), 2027-28 (T-4)
37.38 MW
James Lane, Burghfield, Reading, RG30 3RS (1 component)

Gas fired reciprocating engines.

Reciprocating engines Dockside Power Limited New Build Generating CMU Conditional RG30
Inactive • 2022-23 (T-4)
18.84 MW
Keaton Lane Ivybridge PL21 9ES (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Reciprocating engines CONRAD ENERGY (DEVELOPMENTS) LIMITED New Build Generating CMU Ivybridge Not Prequalified PL21
Inactive • 2020-21 (T-1)
Loading map...
Showing 25 locations