Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

1206 unique locations (4419 components) - Page 17 of 49

Active MW: 45623.98 MW
Inactive MW: 10846.14 MW
Markinch Power Station, Glenrothes, KY7 6GU (1 component)

The CMU will be formed of multiple gas reciprocating engines.

Inactive • 2022-23 (T-4)
18.93 MW
Markham Lane, Duckmanton, Chesterfield, S44 5HS (8 components)
• Gas reciprocating engines
• Gas reciprocating engines as the generating unit.
• Gas reciprocating engines.
Reciprocating engines ALKANE ENERGY UK LIMITED Refurbishing Generating CMU Markham S44
Active • 2028-29 (T-4), 2027-28 (T-4) ...
12.72 MW
Markham Lane, Duckmanton, Chesterfield S44 5HS (4 components)

Gas reciprocating engines

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
4.42 MW
Markham Lane Duckmanton Chesterfield S44 5HS (1 component)

Gas reciprocating engines

Reciprocating engines ALKANE ENERGY UK LIMITED Existing Generating CMU Markham S44
Inactive • 2023-24 (T-1)
1.91 MW
Markham Lane Duckmanton Chesterfield S44 5HS (2 components)

Gas reciprocating engines. (2)

Reciprocating engines ALKANE ENERGY UK LIMITED Existing Generating CMU Markham Markham S44
Active • 2025-26 (T-4), 2024-25 (T-4)
Manvers, Callflex Business Park, South of Doncaster Road, Rotherham, S63 7EF (7 components)
• Gas generating unit(s)
• Gas reciprocating engines
• Gas reciprocating engines as the generating unit.
Reciprocating engines ALKANE ENERGY UK LIMITED Refurbishing Generating CMU Manvers S63
Active • 2028-29 (T-4), 2027-28 (T-4) ...
15.40 MW
Manvers Callflex Business Park South of Doncaster Road Rotherham S63 7EF (4 components)

Gas reciprocating engines (3)

Reciprocating engines ALKANE ENERGY UK LIMITED Existing Generating CMU Manvers Manvers +2 more S63
Active • 2028-29 (T-4), 2026-27 (T-4) ...
5.24 MW
Manvers Callflex Business Park South of Doncaster Road Rotherham S63 7EF (1 component)

Gas generating unit(s)

Reciprocating engines REGENT PARK ENERGY LIMITED Existing Generating CMU Hem Heath 1 & Manvers 1 S63
Inactive • 2023-24 (T-1)
2.61 MW
Manners Avenue, Ilkeston, Derbyshire, DE7 8HE (2 components)

New reciprocating genset in acoustic enclosure

Reciprocating engines FRP MERCIA HOLDCO LIMITED New Build Generating CMU Manners Avenue 2 Manners Avenue 2 DE7
Inactive • 2020-21 (T-4), 2019-20 (T-1)
13.09 MW
Mannerberg Way, Scunthorpe, East Yorks, DN15 8XF (8 components)
• Gas reciprocating engine
• Peak power plant
DSR Reciprocating engines KIWI POWER LTD Unproven DSR CMU CMU - Unproven DSR KIWI87 DN15
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
38.58 MW
Mannelli House, Cowper Road, Gilwilly Industrial Estate, Penrith, CA11 9BN (4 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
Reciprocating engines SWB Power Ltd New Build Generating CMU MANNELLI HOUSE MANNELLI HOUSE +1 more Conditional CA11
Active • 2024-25 (T-4), 2023-24 (T-4) ...
14.27 MW
Mannaberg Way, Scunthorpe, East Yorkshire, DN15 8XF (10 components)
• 16 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• 20 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
Reciprocating engines MARDEN POWER LIMITED Existing Generating CMU Marden Power Marden Power +4 more DN15
Active • 2028-29 (T-4), 2027-28 (T-4) ...
127.16 MW
Mannaberg Way, Scunthorpe, East Yorkshire, DN15 8XF (1 component)

16 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.

Reciprocating engines MARDEN POWER LIMITED Existing Generating CMU Marden Power DN15
Inactive • 2019-20 (T-1)
Manchester Road, Manchester, Greater Manchester, M31 4UG (3 components)

A new build, gas fuelled generation station.

Reciprocating engines CARRINGTON GENERATION LIMITED New Build Generating CMU Carrington Generation Limited Carrington Generation Limited M31
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
76.05 MW
Manchester, Bolton & Bury Canal Towpath, Clifton, Manchester M27 8LR (3 components)
• Gas fired reciprocating engines.
• gas fired reciprocating engines
Reciprocating Engines Reciprocating engines Dockside Power Limited New Build Generating CMU Rake Lane Rake Lane M27
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
39.75 MW
Maltby 1 Colliery Ltd Tickhill Road Rotherham South Yorkshire S66 7QN (1 component)

Gas generating unit(s)

Reciprocating engines REGENT PARK ENERGY LIMITED Existing Generating CMU Regent Park - CMM Rejected S66
Inactive • 2019-20 (T-1)
Major Street, Wolverhampton, WV2 2EG (1 component)

A new build gas fuelled power generating unit comprising multiple reciprocating engines.

Reciprocating engines SWB Power Ltd New Build Generating CMU MAJOR STREET Conditional WV2
Inactive • 2022-23 (T-4)
7.14 MW
M74, Gallowflat, Rutherglen, Scotland, G73 1PX (2 components)

A new build gas fuelled power generating unit comprising multiple reciprocating engines.

Inactive • 2023-24 (T-4), 2022-23 (T-3)
9.50 MW
M65, Accrington BB5 5WE (4 components)
• Gas fired reciprocating engines.
• gas fired reciprocating engines
Active • 2024-25 (T-1), 2020-21 (T-4) ...
52.48 MW
M1, Luton, LU5 6HR, UK (1 component)

The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.

Reciprocating engines CSE21 Limited New Build Generating CMU Sundon Conditional LU5
Inactive • 2022-23 (T-4)
46.14 MW
M1, Luton, LU5 6HR (3 components)

The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.

Reciprocating engines CSE21 Limited New Build Generating CMU Sundon Sundon20 LU5
Active • 2024-25 (T-4), 2023-24 (T-4) ...
93.20 MW
Lymedale Business Park, Holditch Road, Newcastle-under-Lyme, Staffordshire,ST5 9JA (1 component)

Holditch Power will be a 9.36MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.

Reciprocating engines Holditch Power Limited New Build Generating CMU Holditch Power Limited ST5
Active • 2024-25 (T-4)
Lymedale Business Park, Holditch Road, Newcastle-under-Lyme, Staffordshire, ST5 9JA (1 component)

Holditch Power will be a 9.36MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.

Active • 2024-25 (T-4)
8.72 MW
Loading map...
Showing 25 locations