Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

565 unique locations (3571 components) - Page 18 of 23

Penamser Road, Porthmadog, Gwnyedd, LL49 9NX (5 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2024-25 (T-4), 2021-22 (T-1)
Petre Road, Clayton-le-Moors, Lancashire BB5 5JG (4 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Petre Road, Oakenshaw, Clayton-le-Moors, Hyndburn, Lancashire, England, BB5 5JB (3 components)

A Distribution Connected gas fueled generating station.

Active • 2028-29 (T-4)
14.96 MW
Pilsworth North, Moss Hall Road, Pilsworth, Bury, Lancashire, BL9 7JL (2 components)

The CMU at the Pilsworth North Landfill site near Bury will be made up of four reciprocating engines generating from natural gas. In their current state, these engines have been …

Inactive • 2023-24 (T-4), 2022-23 (T-3)
PLOT 11 MID SUFFOLK BUSINESS PARK EYE IP23 7HU (1 component)

CMU consisting of a gas reciprocating engine and alternator

Active • 2024-25 (T-4)
2.41 MW
Plot 3, Forge Way, Knypersley, Staffordshire, ST8 7DN (3 components)

Knypersley Power will be a 7.012MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network

Active • 2028-29 (T-4)
13.11 MW
Plot 4 Hermitage Park, Harts Farm Way, Havant, PO91FA (1 component)

A new build, gas fuelled generation station

Active • 2026-27 (T-4)
19.04 MW
Plot A3, Watervole Way, Doncaster, DN4 5JP (4 components)
• A 20MW new build gas generating station..
• A new build gas generating station.
Inactive • 2020-21 (T-4), 2019-20 (T-1)
Plot A Land at Severn Road Avonmouth BS10 7SE (4 components)
• 10 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Avonmouth Energy Park
• Containerised High Speed Gas-fired reciprocating engines together with transformers, switchgear and associated control gear
Active • 2024-25 (T-4), 2023-24 (T-4)
19.04 MW
Plot A Land at Waterswallows Road, Buxton, SK17 7JT (4 components)
• 2 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Waterswallows Road
• 3 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Waterswallows Road
• 5 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Waterswallows Road
Active • 2024-25 (T-4)
16.00 MW
Plot B Land at Waterswallows Road, Buxton, SK17 7JT (2 components)

5 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Waterswallows Road

Active • 2024-25 (T-4)
Plot D2, Kingdom Avenue, Westbury, Wiltshire, South West England, England, BA13 4EW (10 components)

A 7.220MW reciprocating gas engine power plant comprising of 5 x 1.5MW engines to be installed on designated land at West Wilts Trading Estate.

Active • 2026-27 (T-4), 2025-26 (T-4) ...
26.18 MW
Plot D, Faraday Business Park, Solent Airport, Daedalus, Lee-on-the-Solent, Hampshire, PO13 9FW (2 components)

20MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Plot G11, Bennett St, Bridgend Industrial Estate, Bridgend, CF31 3RS (3 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2022-23 (T-4)
Poole Bank Nurseries , Common Lane, Welton, Hull, HU15 1UT (18 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
3.63 MW
0.47 MW
4.68 MW
Prowse's Lane, Axbridge, BS26 2HP. (5 components)

Total installed capacity is 6.9MW gas reciprocating engines to be installed on designated land within a compound.

Active • 2024-25 (T-1), 2023-24 (T-1)
26.15 MW
Pye Bridge Industrial Estate, Pye Bridge, Somercotes, Alfreton DE55 4NX (5 components)

Gas fired peaking power plant

Active • 2028-29 (T-4), 2025-26 (T-1)
29.11 MW
Pye Bridge Industrial Estate, Somercotes, Alfreton, DE55 4NX (15 components)
• Additional reciprocating gas engines running on natural gas returned to service
• Reciprocating gas engines running on natural gas
Active • 2026-27 (T-4), 2024-25 (T-1) ...
25.06 MW
Radstone Rd, Radstone, Brackley NN13 5PY (9 components)
• A new build diesel or gas grid support plant
• An Existing diesel grid support plant
• An Exiting diesel grid support plant
Active • 2025-26 (T-1), 2024-25 (T-1) ...
14.07 MW
Rampside Road, Roosecote, Near Barrow-in-Furness, Cumbria LA13 0PQ (4 components)

A Prospective New Build Gas reciprocating energy reserve facility

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Rampworx, 1-3 Leckwith Road, Bootle L30 6UE (2 components)

A generating station consisting of multiple reciprocating engines and alternators located on a single site.

Inactive • 2022-23 (T-4)
Loading map...
Showing 25 locations