Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

517 unique locations (2572 components) - Page 18 of 21

Active MW: 45623.98 MW
Inactive MW: 10846.14 MW
Shirebrook 2 Acreage Lane Shirebrook Nottinghamshire NG20 8RN (4 components)

Gas reciprocating engines. (3)

Reciprocating engines ALKANE ENERGY UK LIMITED Existing Generating CMU Shirebrook Shirebrook +2 more NG20
Active • 2028-29 (T-4), 2026-27 (T-4) ...
2.36 MW
Shirebrook 2, Acreage Lane, Shirebrook, Nottinghamshire, NG20 8RN (12 components)
• Gas reciprocating engines
• Gas reciprocating engines as the generating unit.
• Gas reciprocating engines.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
62.47 MW
Shirland Lane, Greenland, Sheffield, S9 3FF (1 component)

A new build, gas fuelled generation station.

Reciprocating engines BAKER STREET GENERATION LIMITED New Build Generating CMU Attercliffe Not Prequalified S9
Active • 2024-25 (T-4)
17.52 MW
Shripney Road, Bognor Regis, PO22 9GH (2 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Reciprocating engines CONRAD ENERGY (DEVELOPMENTS) LIMITED New Build Generating CMU Bognor Bognor Not Prequalified PO22
Active • 2024-25 (T-4)
9.52 MW
Shripney Trade Park, Shripney Road, Bognor Regis, PO22 9GH (2 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Reciprocating engines CONRAD ENERGY (DEVELOPMENTS) LIMITED New Build Generating CMU Bognor Not Prequalified PO22
Active • 2025-26 (T-4), 2022-23 (T-1)
9.55 MW
Solway Trading Estate, Maryport, Cumbria, CA15 8NF (6 components)

New build power station comprised of multiple reciprocating engines.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
43.73 MW
SOUTH CLOSE, ROSYTON, SG8 5UH (7 components)

CMU consisting of multiple reciprocating engines and alternators

Active • 2024-25 (T-4), 2023-24 (T-4) ...
13.23 MW
South Cornelly Trading Estate, Porthcawl Road, Bridgend, CF33 4RE (15 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas) UK POWER RESERVE LIMITED Existing Generating CMU South Cornelly Power Station South Cornelly Power Station +8 more CF33
Active • 2028-29 (T-4), 2027-28 (T-4) ...
73.28 MW
Southmoor Lane, Havant, Hampshire, PO9 1JW (3 components)
• New Build Generating CMU comprising of battery storage and associated plant.
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2026-27 (T-4), 2023-24 (T-4) ...
11.84 MW
Southmoor Lane, Havant, PO9 1JW (2 components)
• A new power plant, with associated civil works, switchgear and electrical connection.
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Reciprocating engines CONRAD ENERGY (DEVELOPMENTS) LIMITED New Build Generating CMU Langstone Not Prequalified PO9
Active • 2024-25 (T-4), 2020-21 (T-4)
23.60 MW
Spalding Drove, Spalding, PE12 6BL (1 component)

Generating unit

Reciprocating engines ENEL X UK LIMITED Existing Generating CMU PE12
Active • 2025-26 (T-4)
Sparrowhawk Road, Halesworth, East Suffolk, IP19 8QW (3 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Reciprocating engines CONRAD (HALESWORTH) LIMITED New Build Generating CMU Halesworth Halesworth +1 more IP19
Active • 2024-25 (T-4), 2023-24 (T-1) ...
20.58 MW
Speke Hall Avenue, Speke, Liverpool, L24 8DA (3 components)
• A new build, battery energy storage system
• A new build, gas fueled generation station.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
24.56 MW
St Asaph Power, Glascoed Road, St Asaph, Denbighshire LL17 0LQ (11 components)
• 16 MW power plant comprising of 8 x 2MW gas fired reciprocating engines.The Power plant is connected to the local distribution and gas network.
• 16 MW power plant comprising of reciprocating engines.The Power plant is connected to the local distribution and gas network.
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
Reciprocating engines ST ASAPH POWER LIMITED Existing Generating CMU St Asaph Power St Asaph Power +5 more LL17
Active • 2028-29 (T-4), 2027-28 (T-4) ...
104.88 MW
Stather Road, Flixborough, DN15 8RR (5 components)
• 2 x 1.2mw gas generator units to be installed on designated land at Stather Raod
• 2.4MW gas fired peaking power plant
• A gas fuelled generating station comprised of multiple reciprocating engines
Reciprocating engines ARL 018 LIMITED New Build Generating CMU Stather Road Stather Road +1 more Conditional DN15
Active • 2028-29 (T-4), 2025-26 (T-4) ...
9.10 MW
Station Road, Cuffley, EN7 5HA (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Reciprocating engines CONRAD ENERGY (DEVELOPMENTS) LIMITED New Build Generating CMU Cuffley Not Prequalified EN7
Active • 2024-25 (T-4)
7.14 MW
Steventon Road, Abingdon, OX13 6RW (5 components)
• 5 x 1mw gas generator units to be installed on designated land at Steventon Road - Connection offer is for 13mw which is split between CMUs - further detail in covering letter
• A gas fuelled generating station.
• A new build 6MW gas fuelled generating station.
Reciprocating engines ARL 028 Limited New Build Generating CMU Steventon Road Conditional OX13
Active • 2024-25 (T-4), 2023-24 (T-4) ...
30.90 MW
Steventon Road, Abingdon,OX13 6RW (1 component)

A new build 6MW gas fuelled generating station.

Reciprocating engines ARL 028 Limited New Build Generating CMU Steventon Not Prequalified OX13
Active • 2024-25 (T-4)
Stewartby Landfill Site, Green Lane, Stewartby, Bedfordshire, MK43 9LY (2 components)
• Solar PV generation site
• The site comprises of gas reciprocating unit(s)
Solar Photovoltaic Reciprocating engines ALKANE ENERGY UK LIMITED New Build Generating CMU Stewartby Solar Not Prequalified MK43
Active • 2025-26 (T-4), 2022-23 (T-4)
3.41 MW
Stone Circle, A6, Shap, Cumbria, CA10 3PZ (2 components)

A new build, gas fuelled generation station.

Reciprocating engines FORSA ENERGY (BERYL STREET) HOLDINGS LIMITED New Build Generating CMU Shapell2 Shapfell1 Not Prequalified CA10
Active • 2024-25 (T-4)
42.85 MW
Stone Circle, Shap, Cumbria, CA10 3PZ (2 components)
• A new build gas fuelled generation station
• A new build, gas fuelled generation station
Reciprocating engines AVONMOUTH GENERATION LIMITED New Build Generating CMU Fell Energy Shap Energy CA10
Active • 2027-28 (T-4)
42.46 MW
STONE CROSS LANE, GOLBORNE, WA3 2SF (1 component)

CMU consisting of multiple gas reciprocating engines and alternators

Active • 2024-25 (T-4)
4.82 MW
Styal Road, Wythenshawe, Manchester, M22 5WB (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Reciprocating engines CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Moss Nook Not Prequalified M22
Active • 2025-26 (T-4)
7.16 MW
Sutton Courtenay Landfill Site, Appleford Sidings, Sutton Courtenay, Abingdon, Oxfordshire, OX14 4PW (4 components)
• Gas fired reciprocating engine(s)
• Solar PV generation site
• The site comprises of gas reciprocating unit(s)
Solar Photovoltaic Reciprocating engines ALKANE ENERGY UK LIMITED New Build Generating CMU SUTTONCOURTENAY Sutton Courtenay Solar Conditional OX14
Active • 2025-26 (T-4), 2023-24 (T-4) ...
6.08 MW
Sutton Farm, Sutton Lane, Broughton Astley, Leicester, LE9 6QF (16 components)

New build power station comprised of multiple reciprocating engines.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
76.07 MW
Loading map...
Showing 25 locations