Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

1206 unique locations (4419 components) - Page 18 of 49

Active MW: 45623.98 MW
Inactive MW: 10846.14 MW
Keaton Lane, Ivybridge, PL21 9ES (3 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
5.70 MW
Kestrel Road, Manfield, Nottingham, NG18 5FJ (2 components)

New reciprocating genset in acoustic enclosure

Reciprocating engines Mercia Power Response (Kestrel Road) Limited New Build Generating CMU Kestrel Road Kestrel Road Conditional NG18
Inactive • 2022-23 (T-4), 2020-21 (T-4)
7.49 MW
Kiln Lane, Rochdale, OL16 3JF (2 components)

A gas fuelled generating station.

Reciprocating engines AVE 010 Limited New Build Generating CMU Kiln Lane Not Prequalified OL16
Inactive • 2023-24 (T-4), 2022-23 (T-3)
4.75 MW
Kiln Power, Unit 6, Lime Kilns Business Park, Nutts Lane, Hinckley, Leicestershire, LE10 3EL. (22 components)
• Kiln Power is a 16 MW power plant comprising gas reciprocating engines. The export of the power plant is connected to the local distribution network via two separately metered 8MW connections (of which this is one of the two CMU components) and it is connected to the local gas network. Kiln Power has a single Balancing Service ID - NGSTORKILN218. To distinguish between the two components of the CMU a numbering system has been used. The two components are separately metered.
• Kiln Power is a 16 MW power plant comprising gas reciprocating engines. The export of the power plant is connected to the local distribution network via two separately metered 8MW connections (of which this is one of the two CMU components) and it is connected to the local gas network. Kiln Power has a single Balancing Service ID - NGSTORKILN218. To distinguish between the two components of the CMU a numbering system has been used. The two components are separately metered.
• Kiln Power is a 16 MW power plant comprising gas reciprocating engines. The export of the power plant is connected to the local distribution network via two separately metered 8MW connections (of which this is one of the two CMU components) and it is connected to the local gas network. connections and it is connected to the local gas network. Kiln Power has a single Balancing Service ID - NGSTORKILN218. To distinguish between the two components of the CMU a numbering system has been used. The two components are separately metered.
Reciprocating engines KILN POWER LIMITED Existing Generating CMU Kiln Power Kiln Power +5 more LE10
Active • 2028-29 (T-4), 2027-28 (T-4) ...
104.88 MW
Kingdom Avenue, Westbury, Wiltshire, BA13 4FG (2 components)

A gas fuelled electrical power generating unit comprising multiple reciprocating engines

Reciprocating engines HEYWOOD POWER LIMITED New Build Generating CMU Hawkeridge Sudbury BA13
Active • 2026-27 (T-4), 2025-26 (T-1)
13.67 MW
Kings Mill Hospital Mansfield Road Sutton in Ashfield NG17 4JL (1 component)

Gas reciprocating engines.

Reciprocating engines ALKANE ENERGY UK LIMITED Existing Generating CMU CMM Portfolio NG17
Active • 2025-26 (T-4)
Kings Mill Hospital, Mansfield Road, Sutton in Ashfield, NG17 4JL (5 components)
• 2 x 1.55 MW Contianerised Generating Sets.
• Gas reciprocating engines
• Gas reciprocating engines.
Active • 2025-26 (T-4), 2021-22 (T-4) ...
13.39 MW
19.04 MW
Kirkgate, Inverkeithing, Fife, Scotland, KY11 1HY, (1 component)

A new build, gas fueled generation station

Reciprocating engines BLACK SHED GENERATION LIMITED New Build Generating CMU Knowsley KY11
Active • 2026-27 (T-4)
19.04 MW
Kirkhaw Lane Knottingley WF11 8RD (1 component)

New build power station comprised of multiple reciprocating engines.

Reciprocating engines HARTREE SOLUTIONS (UK) LIMITED New Build Generating CMU Conditional WF11
Inactive • 2019-20 (T-1)
Kirkhaw Lane, Knottingley, WF11 8RD (2 components)

New build power station comprised of multiple reciprocating engines.

Inactive • 2022-23 (T-4), 2019-20 (T-1)
3.81 MW
Kirkless Landfill Site, Hemfield Close, Kirkless, Higher Ince, Wigan, WN2 2DW (3 components)

Gas fired reciprocating engine(s)

Reciprocating engines INFINIS ALTERNATIVE ENERGIES LIMITED New Build Generating CMU KIRKLESS KIRKLESS Not Prequalified WN2
Active • 2024-25 (T-4), 2023-24 (T-4) ...
3.71 MW
Kirkless Landfill Site, Makerfield Way, Kirkless, Higher Ince, Wigan, WN2 2PR (1 component)

The site comprises of gas reciprocating unit(s)

Reciprocating engines INFINIS ALTERNATIVE ENERGIES LIMITED New Build Generating CMU Conditional WN2
Inactive • 2022-23 (T-4)
1.90 MW
Kitching Road, Peterlee, County Durham, SR8 2HP (3 components)
• 10 x 1mw gas generator units to be installed on designated land at Kitching Road - Connection offer is for 41.24mw which is split between CMUs - further detail in covering letter
• 11 x 1mw gas generator units to be installed on designated land at Kitching Road - Connection offer is for 41.24mw which is split between CMUs - further detail in covering letter
• 20 x 1mw gas generator units to be installed on designated land at Kitching Road - Connection offer is for 41.24mw which is split between CMUs - further detail in covering letter
Reciprocating engines ARL 012 Limited New Build Generating CMU Conditional SR8
Inactive • 2022-23 (T-4)
39.01 MW
Kitching Road, Peterlee, SR8 2HP (7 components)
• A gas fuelled generating station.
• A new build 40MW gas fuelled generating station.
Reciprocating engines ARL 012 Limited New Build Generating CMU Kitching Road Kitching Road A +2 more Rejected SR8
Active • 2024-25 (T-4), 2023-24 (T-4) ...
77.03 MW
Knapton Generating Station, East Knapton, Malton, YO17 8JF (2 components)
• Natural gas fired reciprocating engines installed upon designated land within the existing Knapton Generating Station facility. The CMU output will have a combined total output of 40.9 MWe.
• Natural gas fired reciprocating engines installed upon designated land within the existing Knapton Generating Station facility. The CMU output will have a combined total output of 9 MWe.
Reciprocating engines Knapton Energy One Limited New Build Generating CMU Knapton Peaking Plant Knapton Peaking Plant Not Prequalified YO17
Active • 2024-25 (T-4)
47.52 MW
Knightsbridge Farm, Yarnton, Oxford, OX5 1PH (2 components)

11x 4.5MW gas fuelled generators installed on a compound on land at Knightsbridge farm.

Reciprocating engines KNIGHTSBRIDGE ENERGY CENTRE LIMITED New Build Generating CMU Not Prequalified OX5
Inactive • 2023-24 (T-4), 2022-23 (T-3)
47.02 MW
Knowsley Park Way, Hasslingdon, Rossendale, BB4 4HU (2 components)

A gas fuelled electrical power generating unit comprising multiple reciprocating engines.

Reciprocating engines BALANCE POWER PROJECTS LIMITED New Build Generating CMU Knowsley Not Prequalified BB4
Inactive • 2023-24 (T-4), 2022-23 (T-3)
6.65 MW
Knypersley Generation Unit G, Brown Lees Industrial Estate, Knypersley, Staffordshire, ST8 7DN (8 components)
• The CMU Component is made up of brand new gas-fired engines.
• The CMU Component is made up of reciprocating diesel engines.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Land 15, J3 Business Park, Carr Hill, Balby, Doncaster, DN4 5JT (1 component)

A new build gas fuelled generating station.

Inactive • 2019-20 (T-1)
9.51 MW
Land Adjacent To Electricity Sub-Station, Agecroft Road, Pendlebury (1 component) Geocoding Needed

Small scale gas-fuelled electricity generation facility (14MW) with associated infrastructure.

Reciprocating engines HM AGECROFT LTD New Build Generating CMU
Active • 2024-25 (T-4)
13.33 MW
Loading map...
Showing 25 locations