Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

517 unique locations (2572 components) - Page 19 of 21

Active MW: 45623.98 MW
Inactive MW: 10846.14 MW
Sutton Manor Grid Capacity Site, Union Bank Farm, Warrington Road, Bold Bridge, St Helens, WA8 5UT (6 components)

3.000MW of installed capacity of gas fuelled reciprocating engines to be installed on designated land within a manufacturing compound.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
11.35 MW
Tees Valley Nursery, The Moat, Belasis Hall, TS23 4ED (21 components)
• The CMU component TEES01 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
• The CMU component TEES02 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
40.32 MW
Tewin Road, Welwyn Garden City, AL7 1BD (1 component)

New build power station comprised of multiple reciprocating engines.

Reciprocating engines WGC ENERGY CENTRE LIMITED New Build Generating CMU WGC ENERGY CENTRE LIMITED Not Prequalified AL7
Active • 2026-27 (T-4)
17.13 MW
Thatcham Grid Substation, Piper's Lane, Off Station Road, Thatcham, RG19 4NA (10 components)
• 6 x reciprocating engines
• Aux. load separately metered
Active • 2025-26 (T-4), 2024-25 (T-4) ...
16.59 MW
'The Black Shed', Belleknowes Industrial Estate, Inverkeithing, KY11 1HY (5 components)

A new build, gas fuelled generation station.

Reciprocating engines BELLEKNOWES GENERATION LIMITED New Build Generating CMU Belleknowes Generation Limited Belleknowes Generation Limited +2 more KY11
Active • 2025-26 (T-4), 2024-25 (T-4) ...
75.88 MW
The Canalside, Marsh Lane, off Showground Road, Bridgwater, Somerset, TA6 6LQ (15 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas) UK POWER RESERVE LIMITED Existing Generating CMU Bridgwater Power Station Bridgwater Power Station +8 more TA6
Active • 2028-29 (T-4), 2027-28 (T-4) ...
75.76 MW
The Long Barrow, Willesborough, Ashford, Kent. TN24 0GP (14 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas) UK POWER RESERVE LIMITED Existing Generating CMU Long Barrow Power Station Sevington Power Station +7 more TN24
Active • 2026-27 (T-4), 2025-26 (T-4) ...
61.16 MW
The Manorway, Stanford-leHope, SS17 9LL (5 components)
• A Battery Energy Storage System
• A gas fuelled generating station
Active • 2025-26 (T-4), 2024-25 (T-1)
26.37 MW
Thistlebrook Farm, Tring Road, Wingrave, HP22 4LN (1 component)

A New Build Distributed Connected Gas Fueled Generating Station.

Reciprocating engines ARL 021 LIMITED New Build Generating CMU Wingrave HP22
Active • 2027-28 (T-4)
47.08 MW
13.42 MW
Tickhill Road Rotherham South Yorkshire S66 7QW (1 component)

Gas reciprocating engines

Reciprocating engines ALKANE ENERGY UK LIMITED Existing Generating CMU Maltby S66
Active • 2024-25 (T-1)
1.98 MW
Tickhill Road, Rotherham, South Yorkshire, S66 7QW (7 components)
• Gas fired generating unit(s)
• Gas reciprocating engines
Active • 2025-26 (T-4), 2024-25 (T-1) ...
14.57 MW
Tir John North Road, St Thomas, SA1 8NS (1 component)

Gas fired reciprocating engines.

Reciprocating engines PULSE CLEAN ENERGY UK LIMITED New Build Generating CMU DG004 Not Prequalified SA1
Active • 2024-25 (T-4)
19.04 MW
Titanium Road, Cocket, Swansea, SA5 4NH (6 components)
• New build site with gas reciprocating engines to replace diesel plant
• STOR diesel engines that will operate environmentally with mixed fuel
Reciprocating engines GFI73 LTD Refurbishing Generating CMU Swansea Swansea SA5
Active • 2026-27 (T-4), 2025-26 (T-4) ...
37.58 MW
Titanium Road, Waunarlwydd, Swansea, SA5 4NH (2 components)
• New build site with gas reciprocating engines to replace diesel plant
• New gas reciprocating engines to be installed and/or existing plant to be refurbished/replaced to operate on green bio-fuel.
Reciprocating engines GFI TIMET LTD New Build Generating CMU SA5
Active • 2028-29 (T-4), 2027-28 (T-4)
37.57 MW
Toray 1 Toray Textiles ImportExport Crown Farm Way Mansfield Nottingham NG19 0FN (2 components)
• Gas fired generating unit
• Gas reciprocating engines
Reciprocating engines ALKANE ENERGY UK LIMITED Existing Generating CMU A11703 Torays NG19
Active • 2024-25 (T-1), 2019-20 (T-1)
Toray 1, Toray Textiles ImportExport, Crown Farm Way, Mansfield, Nottingham, NG19 0FN (6 components)
• Gas fired generating unit
• Gas generating unit(s)
• Gas reciprocating engines
Active • 2025-26 (T-4), 2024-25 (T-1) ...
12.59 MW
1.04 MW
Toray 2, Toray Textiles ImportExport, Crown Farm Way, Mansfield, Nottingham, NG19 0FN (4 components)
• Gas reciprocating engines
• Gas reciprocating engines.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
5.23 MW
Traston Road, Off Corporation Road, Newport , Gwent, NP19 4RQ (16 components)

The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system. (3)

Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas) UK POWER RESERVE LIMITED Existing Generating CMU Solutia Power Station Solutia Power Station +9 more NP19
Active • 2028-29 (T-4), 2027-28 (T-4) ...
28.30 MW
Traston Road, Off Corporation Road, Newport, Gwent, NP19 4RQ (16 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
81.43 MW
Tring Road, Tring, HP23 4RA (11 components)
• 10 x 1mw gas generator units to be installed on designated land at Tring Road - Connection offer is for 49.9mw which is split between CMUs - further detail in covering letter
• 20 x 1mw gas generator units to be installed on designated land at Tring Road - Connection offer is for 49.9mw which is split between CMUs - further detail in covering letter
• A gas fuelled generating station.
Reciprocating engines ARL 021 Limited New Build Generating CMU AR0123 Tring Road +4 more Conditional HP23
Active • 2025-26 (T-4), 2024-25 (T-4) ...
189.26 MW
Loading map...
Showing 25 locations