Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

1206 unique locations (4419 components) - Page 19 of 49

Active MW: 45623.98 MW
Inactive MW: 10846.14 MW
Liverton Business Park Exmouth, Devon, EX8 2NU (3 components)

A gas fuelled generating station.

Reciprocating engines LIVERTON 2014 LIMITED New Build Generating CMU Liverton Liverton EX8
Active • 2024-25 (T-4), 2023-24 (T-4) ...
13.31 MW
Liverpool Street, Bordesley, Birmingham, B9 4DS (1 component)

A new build gas fuelled power generating unit comprising multiple reciprocating engines.

Reciprocating engines SWB Power Ltd New Build Generating CMU BORDESLEY Conditional B9
Inactive • 2022-23 (T-4)
3.81 MW
Lead Road, Chopwell, Tyne and Wear, NE40 4JP (10 components)
• 11 x 1mw gas generator units to be installed on designated land at Lead Road - Connection offer is for 41.24mw which is split between CMUs - further detail in covering letter
• A gas fuelled generating station.
• A new build 40MW gas fuelled generating station.
Reciprocating engines ARL 019 Limited New Build Generating CMU Lead Road Lead Road A +2 more Conditional NE40
Active • 2024-25 (T-4), 2023-24 (T-4) ...
116.04 MW
Lawns Avenue, Wigan, WN5 8UH (4 components)

A gas fuelled generating station.

Reciprocating engines AVE 014 Limited New Build Generating CMU Lawns Avenue A Lawns Avenue B Not Prequalified WN5
Inactive • 2023-24 (T-4), 2022-23 (T-3)
6.65 MW
Langstone Power Generation Plant, Southmoor Lane, Havant, Hampshire, PO9 1JW (5 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Reciprocating engines CONRAD ENERGY (DEVELOPMENTS) LIMITED New Build Generating CMU Langstone Langstone +1 more Not Prequalified PO9
Active • 2027-28 (T-4), 2026-27 (T-4) ...
19.01 MW
Langage Solar Park, Lower Langage Farm, Plympton, Plymouth PL7 5AW (note Appendix 1 of Cover Letter) (1 component)

Three new 1.55MW gas reciprocating units connected at Langage Solar Park

Reciprocating engines LANGAGE SOLAR PARK LIMITED New Build Generating CMU Langage Solar Park Gas Reciprocating Engine Units 1s PL7
Active • 2024-25 (T-4)
4.43 MW
Langage Solar Park, Lower Langage Farm, Plympton, Plymouth PL7 5AW (1 component)

Three new 1.55MW gas reciprocating units to be installed at Langage Solar Park

Reciprocating engines LANGAGE SOLAR PARK LIMITED New Build Generating CMU Langage Solar Park Gas Reciprocating Engine Units 1s PL7
Active • 2027-28 (T-4)
4.39 MW
Land within Duniface Farm, Leven, KY8 5RH (2 components)
• A new build, gas fuelled generation station.
• Diesel and/or gas reciprocating engines.
Reciprocating engines LEVEN GENERATION LIMITED New Build Generating CMU Leven Generation Limited KY8
Inactive • 2022-23 (T-4), 2020-21 (T-4)
38.13 MW
Land west of Cheston Road, Birmingham, B7 5EU (2 components)

3 x 2MW gas fuelled generator units to be installed on a compound on industrial land west of Cheston Road.

Inactive • 2023-24 (T-4), 2022-23 (T-3)
5.70 MW
Land west of Cadwell Lane, Hitchin, SG4 0AG (2 components)

3 X 2MW gas fuelled generators installed on a compound on land to the west of Cadwell Lane

Reciprocating engines Cadwell Lane Energy Centre Limited New Build Generating CMU Not Prequalified SG4
Inactive • 2023-24 (T-4), 2022-23 (T-3)
5.70 MW
Land west of Basildon substation, Lower Dunton Road, Basildon, Essex, CM13 3SX (1 component)

Energy Centre comprising of Lean Burn, Acoustically Treated Natural Gas Reciprocating Engines.

Reciprocating engines Suncredit Solutions Limited New Build Generating CMU Conditional CM13
Inactive • 2022-23 (T-4)
20.93 MW
Land to the west (see map) of 18-20 Netherdale Rd, Netherton Industrial Estate, Wishaw ML2 0ER (4 components)
• The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV
• The facility consists of a series of gas fired generators. It connects to SPEN?s 33kV distribution network at 33kV
Storage Reciprocating engines SPECTRUMRESERVE5 LTD New Build Generating CMU Netherton Battery Storage Facility Netherton Gas Generation ML2
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
30.41 MW
Land to the West of Chapterhouse Close, Ellesmere Port, CH65 4EL (2 components)
• 49.5 MW Gas Reciprocating Engines envisaged to be made up of multiple modules.
• 49.9 MW Gas Reciprocating Engines envisaged to be made up of multiple modules.
Reciprocating engines Peel L&P Energy Limited New Build Generating CMU Ellesmere Port Balancing Services Plant Ellesmere Port Balancing Services Plant CH65
Active • 2024-25 (T-4), 2023-24 (T-4)
94.53 MW
Land to the south of the A883, Falkirk Road, near Bonnybridge FK4 1SN. This site pre-qualified last year as CFBS13 (2 components)

The facility consists of a series of gas fired generators. It connects to SPEN?s 33kV distribution network at 33kV.

Inactive • 2022-23 (T-4), 2022-23 (T-3)
18.92 MW
Land to the south of the A883, Falkirk Road, near Bonnybridge FK4 1SN. This site pre-qualified last year as CFBS13 (2 components)

The facility consists of a series of gas fired generators. It connects to SPEN?s 33kV distribution network at 33kV.

Reciprocating engines RELIABLE GENERATION LTD New Build Generating CMU Carmuirs Gas Generation Not Prequalified FK4
Inactive • 2022-23 (T-3), 2022-23 (T-4)
Land to the South of Clay Hill off Hamlet Hill, CM19 5JR (4 components)

Gas reciprocating engines

Reciprocating engines NAZEING EAST POWER LIMITED New Build Generating CMU Nazeing East Power Limited Nazeing East Power Limited +2 more CM19
Active • 2026-27 (T-4), 2025-26 (T-4) ...
190.39 MW
Land to the South of Clay Hill off Hamlet Hill CM19 5JR (6 components)

Gas reciprocating engines

Reciprocating engines NAZEING WEST POWER LIMITED New Build Generating CMU Nazeing West Power Limited Nazeing West Power Limited +4 more CM19
Active • 2028-29 (T-4), 2027-28 (T-4) ...
284.29 MW
Land to the south of Anna?s Road, Blackpool, FY4 5JX (nearest postcode) (1 component)

The CMU component consist of gas fired reciprocating engines to be installed on designated land lying to the south of Anna?s Road, Blackpool, FY4 5JX (nearest postcode)

Active • 2024-25 (T-4)
44.28 MW
Land to the south of Anna?s Road, Blackpool, FY4 5JX (nearest postcode) (1 component)

The CMU component consist of gas fired reciprocating engines to be installed on designated land lying to the south of Anna?s Road, Blackpool, FY4 5JX (nearest postcode)

Reciprocating engines RELIANCE ENERGY LIMITED New Build Generating CMU Not Prequalified FY4
Active • 2024-25 (T-4)
Land to the rear of Hawley House, Outgang, Lane Dinnington, Rotherham. (1 component) Geocoding Needed

New reciprocating engines housed within acoustic enclosures

Inactive • 2019-20 (T-1)
7.45 MW
Land to the North of the Grain Road, Isle of Grain, Grain, Medway, United Kingdom. Nearest postcode: ME3 0EH (2 components)

Gas reciprocating engines

Reciprocating engines GRAIN NORTH POWER LIMITED GRAIN SOUTH POWER LIMITED New Build Generating CMU Grain North Power Limited Grain South Power Limited ME3
Active • 2025-26 (T-4)
95.45 MW
Land to the north of A1079, Cottingham, HU17 0RP (2 components)

Gas fired reciprocating engines.

Reciprocating engines Dockside Power Limited New Build Generating CMU Conditional HU17
Inactive • 2022-23 (T-4)
38.06 MW
Land To The North Of 3 Haywood Way Hastings, TN35 4NR (5 components)
• CMU consisting of multiple reciprocating engines and alternators
• CMU consisting of multiple reciprocating engines and alternators.
Reciprocating engines URBAN RESERVE (ASSETCO 2) LIMITED New Build Generating CMU Haywood Power Haywood Power +2 more TN35
Active • 2028-29 (T-4), 2027-28 (T-4) ...
24.02 MW
LAND TO THE NORTH-EAST SIDE OF BRYN ROAD, ASHTON-IN-MAKERFIELD, WN4 8BX (5 components)

CMU consisting of multiple reciprocating engines and alternators

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
3.81 MW
LAND TO THE NORTH-EAST SIDE OF BRYN ROAD ASHTON-IN-MAKERFIELD WN4 8BX (3 components)

CMU consisting of multiple reciprocating engines and alternators (3)

Reciprocating engines URBAN RESERVE (ASSETCO) LIMITED New Build Generating CMU Bryn Power WN4
Inactive • 2022-23 (T-1), 2021-22 (T-1) ...
Loading map...
Showing 25 locations