Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

489 unique locations (2092 components) - Page 2 of 20

Active MW: 14652.51 MW
Inactive MW: 930.44 MW
Aberaman Industrial Estate (South Bound), Aberaman, Nr Aberdare, Rhondda Cynon Taff, CF44 6DA (16 components)

The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system. (3)

Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas) UK POWER RESERVE LIMITED Existing Generating CMU Aberdare Power Station Aberdare Power Station +9 more Rejected CF44
Active • 2028-29 (T-4), 2027-28 (T-4) ...
28.30 MW
Abercorn Street, Paisley, PA3 4DF (5 components)

A new build, gas fuelled generation station. (3)

Reciprocating engines ABERCORN GENERATION LIMITED New Build Generating CMU Abercorn Road Abercorn Road +2 more PA3
Active • 2024-25 (T-4), 2023-24 (T-1) ...
19.04 MW
Adjacent to Seal Sand Bulk Storage Facility Seal Sands Stockton-on-Tees Cleveland TS2 1UB (8 components)

Existing OCGT (3)

Reciprocating engines Open Cycle Gas Turbine (OCGT) WHITETOWER ENERGY LIMITED Existing Generating CMU Viking Power Viking Power +5 more TS2
Active • 2028-29 (T-4), 2027-28 (T-4) ...
127.07 MW
Adsworth Road, Stockport, SK3 8LF (2 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (2)

Reciprocating engines CONRAD ENERGY (DEVELOPMENTS) LIMITED New Build Generating CMU Stockport Not Prequalified SK3
Active • 2024-25 (T-4), 2021-22 (T-1)
Aldon Road, Poulton-le-Fylde, Lancashire FY6 8JL (5 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment. (3)

Reciprocating engines ALDON POWER LIMITED New Build Generating CMU Aldon Aldon +2 more FY6
Active • 2024-25 (T-4), 2023-24 (T-1) ...
14.28 MW
Alne Material Recovery Facility, Forest Lane, Alne, York, YO61 1TU (7 components)
• Existing Generating CMU comprising of a gas fuelled reciprocating engine and gas delivery plant.
• Generating CMU comprising of a CHP asset producing energy from waste
• New Build Generating CMU comprising of a CHP asset producing energy from waste.
Energy from Waste Reciprocating engines ALLIUM HELMSLEY LTD New Build Generating CMU Alne Alne +4 more YO61
Active • 2026-27 (T-4), 2025-26 (T-1) ...
8.05 MW
APS Growers Ltd / Branfield Nursery 111 Stockbridge Road Elloughton HU15 1HW (10 components)

One Jenbacher CHP engine with a generation capacity of 3.36 MW (3)

Reciprocating Engines Reciprocating engines Combined Heat and Power (CHP) GLASS LEAF POWER LIMITED Existing Generating CMU Branfield Energy Centre Glassleaf Power +2 more HU15
Active • 2028-29 (T-4), 2027-28 (T-4) ...
9.31 MW
Arlesey Landfill Site Mill Lane Arlesey Bedfordshire SG15 6RF (4 components)

Gas reciprocating engines (3)

Active • 2024-25 (T-1), 2023-24 (T-1) ...
2.13 MW
Arlesey Landfill Site Mill Lane Arlesey Bedfordshire SG15 6RF (8 components)

Gas reciprocating engines (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
5.97 MW
Arlesey Landfill Site, Mill Lane, Arlesey, Bedfordshire, SG15 6RF (2 components)

Gas reciprocating engines

Reciprocating engines ALKANE ENERGY UK LIMITED Existing Generating CMU Arlesey 4,5,6 SG15
Active • 2028-29 (T-4)
3.07 MW
Ashland Cottage Farm, Beck Lane, Sutton in Ashfield, NG17 3AH (4 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (3)

Reciprocating engines FISHPOND ENERGY LIMITED New Build Generating CMU Ashlands Ashlands +1 more NG17
Active • 2024-25 (T-4), 2023-24 (T-1) ...
7.61 MW
Ash Road, Elton, Chester, CH2 4RX (3 components)

A new build, gas fuelled generation station.

Reciprocating engines MERSEY GENERATION LIMITED New Build Generating CMU Protos Generation - 1 Protos Generation - 2 +1 more CH2
Active • 2028-29 (T-4)
46.28 MW
Ash Road, Protos, CH2 4RX (1 component)

49.5 MW Gas Reciprocating Engines envisaged to be made up of multiple modules.

Reciprocating engines Peel L&P Energy Limited New Build Generating CMU Protos Balancing Services Plant Not Prequalified CH2
Active • 2024-25 (T-4)
Ashton Old Road, Openshaw, Manchester M11 1AA (5 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment. (3)

Reciprocating engines ASHTON POWER LIMITED New Build Generating CMU Ashton Ashton +2 more M11
Active • 2024-25 (T-4), 2023-24 (T-1) ...
17.13 MW
Askern CMM Generation Campsall Road Askern Doncaster DN6 0FD (1 component)

Gas reciprocating engines

Reciprocating engines ALKANE ENERGY UK LIMITED Existing Generating CMU Askern DN6
Active • 2024-25 (T-1)
0.22 MW
Askern CMM Generation Campsall Road Askern Doncaster DN6 0FD (1 component)

Gas reciprocating engines

Reciprocating engines ALKANE ENERGY UK LIMITED Existing Generating CMU Askern DN6
Active • 2025-26 (T-4)
Aspatria Business Park, Park Road, Aspatria, Cumbria, CA7 3DP (2 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines
• New build power station comprised of multiple reciprocating engines
Reciprocating engines OCGT and Reciprocating Engines SWB Power Ltd New Build Generating CMU Aspatria BP Not Prequalified CA7
Active • 2024-25 (T-4), 2021-22 (T-4)
Aveley Landfill Site Sandy Lane Aveley RM15 4XP (6 components)

Gas reciprocating engines (3)

Active • 2024-25 (T-1), 2023-24 (T-1) ...
1.85 MW
Aveley Landfill Site Sandy Lane Aveley RM15 4XP (6 components)

Gas reciprocating engines (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
1.85 MW
Aveley Landfill Site, Sandy Lane, Aveley, RM15 4XP (5 components)

Gas reciprocating engines (3)

Reciprocating engines ALKANE ENERGY UK LIMITED INFINIS ALTERNATIVE ENERGIES LIMITED Existing Generating CMU Aveley 13, 14 Aveley2 +1 more RM15
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4.62 MW
Balle Street, Darwen, Blackburn BB3 2AZ (4 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment. (3)

Reciprocating engines STOR 130 LTD New Build Generating CMU Balle Balle +1 more Not Prequalified BB3
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Batleys Cash and Carry Gielgud Way Coventry CV2 2SZ (4 components)

A completed power plant, with associated civil works, switchgear and electrical connection. (3)

Reciprocating engines PEAK GEN POWER LIMITED Existing Generating CMU Peak Gen Power Coventry Peak Gen Power Coventry +2 more CV2
Active • 2024-25 (T-1), 2023-24 (T-1) ...
11.31 MW
Batleys Cash and Carry Gielgud Way Coventry CV2 2SZ (5 components)

A completed power plant, with associated civil works, switchgear and electrical connection. (3)

Reciprocating engines PEAK GEN POWER LIMITED Existing Generating CMU Peak Gen Power Coventry Peak Gen Power Coventry +2 more CV2
Active • 2028-29 (T-4), 2027-28 (T-4) ...
16.92 MW
Batleys Cash and Carry Talbot Road Fareham PO15 5RY (4 components)

The CMU component is net of the auxiliary power required (3)

Reciprocating engines W4B RENEWABLE ENERGY LIMITED Existing Generating CMU W4B 2020 16MW W4B 2020 16MW +2 more PO15
Active • 2024-25 (T-1), 2023-24 (T-1) ...
33.85 MW
Batleys Cash and Carry Talbot Road Fareham PO15 5RY (5 components)
• The CMU component is net of the auxiliary power required (2)
• A completed power plant, with associated civil works, switchgear and electrical connection.
Reciprocating engines W4B RENEWABLE ENERGY LIMITED PEAK GEN TOP CO LIMITED Existing Generating CMU W4B 2020 16MW W4B 2020 16MW +2 more PO15
Active • 2028-29 (T-4), 2027-28 (T-4) ...
52.31 MW
Loading map...
Showing 25 locations