Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

565 unique locations (3571 components) - Page 21 of 23

'The Black Shed', Belleknowes Industrial Estate, Inverkeithing, KY11 1HY (5 components)

A new build, gas fuelled generation station.

Active • 2025-26 (T-4), 2024-25 (T-4) ...
37.95 MW
The Canalside, Marsh Lane, off Showground Road, Bridgwater, Somerset, TA6 6LQ (19 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2023-24 (T-4) ...
37.69 MW
The Long Barrow, Willesborough, Ashford, Kent. TN24 0GP (22 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2026-27 (T-4), 2022-23 (T-3) ...
9.52 MW
The Old Brickyard Brickyard Lane Station Road Verwood Dorset BH31 7LB (2 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2022-23 (T-4)
The Wood Yard, Whitehill Rd, Gravesend, Kent, DA13 9NA (4 components)

New reciprocating genset in acoustic enclosure

Inactive • 2020-21 (T-4), 2019-20 (T-1)
Thurscoe Business Park Barrowfield Rd Thurscoe Rotherham S63 0DB (3 components)

Gas reciprocating engines

Active • 2027-28 (T-4), 2026-27 (T-4) ...
10.35 MW
Thurscoe Business Park, Barrowfield Rd, Thurscoe, Rotherham S63 0DB (3 components)

Gas reciprocating engines

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Tickhill Road Rotherham South Yorkshire S66 7QW (1 component)

Gas reciprocating engines

Active • 2024-25 (T-1)
1.98 MW
Tir John North Rd, Swansea, SA1 8NS (2 components)

Gas fired reciprocating engines.

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Titanium Road, Cocket, Swansea, SA5 4NH (4 components)
• New build site with gas reciprocating engines to replace diesel plant
• STOR diesel engines that will operate environmentally with mixed fuel
Active • 2025-26 (T-4), 2023-24 (T-1)
44.12 MW
Titanium Road, Swansea, SA5 4SG (2 components)

Gas fired reciprocating engines.

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Titanium Road, Waunarlwydd, Swansea, SA5 4NH (2 components)

New gas reciprocating engines to be installed and/or existing plant to be refurbished/replaced to operate on green bio-fuel.

Active • 2028-29 (T-4)
37.40 MW
Toray 1 Toray Textiles ImportExport Crown Farm Way Mansfield Nottingham NG19 0FN (9 components)
• Gas fired generating unit
• Gas generating unit(s)
• Gas reciprocating engines
Active • 2024-25 (T-1), 2023-24 (T-4) ...
Toray 2 Toray Textiles ImportExport Crown Farm Way Mansfield Nottingham NG19 0FN (2 components)
• Gas reciprocating engines
• Gas reciprocating engines.
Active • 2024-25 (T-1), 2024-25 (T-4)
2.09 MW
Toray 2, Toray Textiles, Import Way Crown Farm Way Mansfield NG19 0FN (3 components)

Gas generating unit(s)

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Traston Road, Off Corporation Road, Newport , Gwent, NP19 4RQ (26 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2023-24 (T-4) ...
28.20 MW
Trumfleet Generation Site, Marsh Lane, Trumfleet, Doncaster. DN6 0DU (20 components)
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Tweedale Way, Oldham OL9 8EH (9 components)

CMU consisting of multiple reciprocating engines and alternators

Active • 2025-26 (T-4), 2024-25 (T-1) ...
21.69 MW
Union Street, Manchester, M27 4HL (4 components)

A gas fuelled generating station.

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Unit 1 Lanes Farm Marlborough Road Royal Wootton Bassett Swindon SN4 7SA (26 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2024-25 (T-4), 2023-24 (T-1) ...
24.75 MW
Loading map...
Showing 25 locations